Sobha Orbis Tower E

by Sobha · 📍 Motor City

Price from

AED 985,000

Sobha Orbis Tower E is a project by Sobha in Motor City, Dubai. Prices start from AED 985,000. It offers 1 Bedroom. Sobha states handover in December 2028. It was 18% built at the official RERA site inspection of 13 August 2026.

Sobha Orbis Tower ESobha Orbis Tower E 2Sobha Orbis Tower E 3Sobha Orbis Tower E 4Sobha Orbis Tower E 5

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓
Unit typeSize rangeLayouts
1 Bedroom545–988 sqft (51–92 m²)1
1.5 Bedroom545–988 sqft (51–92 m²)1
2 Bedroom545–988 sqft (51–92 m²)1

Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.

About the project

Introducing Sobha Orbis Tower E, a luxurious residential development by Sobha Group, featuring elegantly designed 1, 1.5 and 2-bedroom apartments in Motor City Dubai. It is one of the three towers with G+34 floors and has 19 meticulously crafted apartments per floor. The façades of these high-end apartments offer a lifestyle where luxury, convenience and connectivity converge, providing an unmatched living environment for all residents. Motor City's prime location, with easy access to major highways, makes it a convenient hub for navigating Dubai's vibrant urban landscape. Residents can enjoy a range of luxurious amenities, including landscaped gardens, a resort-style pool and a state-of-the-art fitness centre.

Construction progress

18.2% complete at the latest RERA site inspection on 13 Aug 2026; scheduled completion 31 Dec 2028.

Project register as of 15 Oct 2026.

Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 1)Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 2)Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 3)Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 4)Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 5)Sobha Orbis Tower E, Motor City construction progress, 18.2% complete: RERA site inspection 13 Aug 2026 (photo 6)
Sobha Orbis Tower E site photos from the RERA inspection on 13 Aug 2026 (6 of 19 shown).
InspectionCompletePhotos
13 Aug 202618.2%19
25 Mar 202611.7%6
4 Jul 20256.42%7
14 May 20240%3

Escrow account 001640199690701 at Dubai Islamic Bank (Public Joint Stock Company). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #3070, updated daily. Tap a photo for the full-size original.

Amenities

Barbeque AreaGym or Health ClubJacuzziKids Play AreaSwimming Pool

How it compares in Motor City

13 other off-plan projects in Motor City · average entry price AED 1.31M · this project is 25% below that average

Sobha Orbis Tower E: questions and answers

What is the starting price of Sobha Orbis Tower E?

Prices at Sobha Orbis Tower E start from AED 985,000, for homes from 536 sqft (50 m²), as published by Sobha.

What is the payment plan for Sobha Orbis Tower E?

The payment plan published by Sobha for Sobha Orbis Tower E is: 20% down, 60% pre-handover, 20% handover.

When is the handover of Sobha Orbis Tower E?

Sobha states handover of Sobha Orbis Tower E in December 2028. The Dubai Land Department project register lists the completion date of the project as December 2028.

How much of Sobha Orbis Tower E is built?

Sobha Orbis Tower E was 18% complete at the official RERA site inspection of 13 August 2026.

Is Sobha Orbis Tower E registered with the Dubai Land Department?

Yes. Sobha Orbis Tower E is registered with the Dubai Land Department as project number 3070, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Sobha Orbis Tower E?

Sobha Orbis Tower E is developed by Sobha. The Dubai Land Department project register lists 49 projects for Sobha: 20 delivered and 27 under construction.

Where is Sobha Orbis Tower E located?

Sobha Orbis Tower E is in Motor City (Sobha Orbis), Dubai.

What unit types does Sobha Orbis Tower E offer?

Sobha Orbis Tower E offers 1 Bedroom, with sizes from 536 sqft (50 m²). The project has 3,002 units in the Dubai Land Department project register.

How does Sobha Orbis Tower E compare with other off-plan projects in Motor City?

The starting price of Sobha Orbis Tower E (AED 985,000) is 25% below the average starting price of 5 other off-plan projects in Motor City, which is AED 1.31M.

What is the average price per sqft in Motor City?

Apartments in Motor City sell for about AED 1,003/sqft (AED 10,792/m²), based on 746 registered sales in the last 12 months.

What rental yield can I expect in Motor City?

Apartments in Motor City yield about 7.2% gross, or about 5.6% net after service charges, based on 1,940 registered rent contracts and 746 sales in the last 12 months.

What are the service charges in Motor City?

Service charges for apartments in Motor City are about AED 15.71/sqft (AED 169/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

What amenities does Sobha Orbis Tower E have?

Sobha Orbis Tower E lists these amenities: Barbeque Area, Gym or Health Club, Jacuzzi, Kids Play Area and Swimming Pool.

Explore more

✦ Want the full picture on Sobha Orbis Tower E?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 13 Aug 2026.