Elara Building 3

by Meraas · 📍 Madinat Jumeirah Living

Price from

AED 2.30M

Elara Building 3 is a project by Meraas in Madinat Jumeirah Living, Dubai. Prices start from AED 2.30M. It offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom. Meraas states handover in November 2026. It was 64% built at the official RERA site inspection of 20 July 2026.

Elara Building 3Elara Building 3 2Elara Building 3 3Elara Building 3 4Elara Building 3 5

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓
Unit typeSize rangeLayouts
1 Bedroom—1
2 Bedroom—1
3 Bedroom—1
4 Bedroom—1

Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.

About the project

Meraas introduces Elara Building 3 at Madinat Jumeirah Living, a remarkable addition to the community that offers a one-of-a-kind lifestyle experience in Dubai. This project is part of a complex consisting of three towers, showcasing modern design and cutting-edge interiors, complemented by its excellent location. Explore a variety of lavish apartments ranging from 1 to 3-bedrooms, as well as 4-bedroom penthouses that are available for purchase. These units provide spacious living areas, bedrooms with en-suite bathrooms, well-equipped kitchens and a balcony. Residents have the privilege of enjoying breathtaking views of the iconic Burj Al Arab, pristine beaches and scenic pathways surrounding Elara Building 3 at Madinat Jumeirah Living, creating an immersive and truly exceptional way of living.

Construction progress

64.27% complete at the latest RERA site inspection on 20 Jul 2026; scheduled completion 25 Nov 2026.

Project register as of 16 Oct 2026.

Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 1)Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 2)Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 3)Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 4)Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 5)Elara Building 3, Madinat Jumeirah Living construction progress, 64.27% complete: RERA site inspection 20 Jul 2026 (photo 6)
Elara Building 3 site photos from the RERA inspection on 20 Jul 2026 (6 of 10 shown).
InspectionCompletePhotos
20 Jul 202664.27%10
30 Apr 202653.56%8
30 Jan 202640.04%14
22 Oct 202522.14%6
31 Jul 20258.37%4
7 May 20250.55%3
25 Feb 20250.04%3
23 Sept 20240%3

Escrow account 4031224784662012 at First Abu Dhabi Bank P.J.S.C.. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #2754, updated daily. Tap a photo for the full-size original.

Amenities

Day Care CenterGym or Health ClubKids Play AreaParking SpacesSwimming Pool

How it compares in Madinat Jumeirah Living

10 other off-plan projects in Madinat Jumeirah Living · average entry price AED 2.52M · this project is 9% below that average

Elara Building 3: questions and answers

What is the starting price of Elara Building 3?

Prices at Elara Building 3 start from AED 2.30M, for homes from 721 sqft (67 m²), as published by Meraas.

What is the payment plan for Elara Building 3?

The payment plan published by Meraas for Elara Building 3 is: 20% down, 50% pre-handover, 30% handover.

When is the handover of Elara Building 3?

Meraas states handover of Elara Building 3 in November 2026. The Dubai Land Department project register lists the completion date of the project as November 2026.

How much of Elara Building 3 is built?

Elara Building 3 was 64% complete at the official RERA site inspection of 20 July 2026.

Is Elara Building 3 registered with the Dubai Land Department?

Yes. Elara Building 3 is registered with the Dubai Land Department as project number 2754, and its escrow account is held at First Abu Dhabi Bank P.J.S.C.. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Elara Building 3?

Elara Building 3 is developed by Meraas. The Dubai Land Department project register lists 64 projects for Meraas: 31 delivered and 32 under construction.

Where is Elara Building 3 located?

Elara Building 3 is in Madinat Jumeirah Living (Elara), Dubai.

What unit types does Elara Building 3 offer?

Elara Building 3 offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom, with sizes from 721 sqft (67 m²). The project has 238 units in the Dubai Land Department project register.

How does Elara Building 3 compare with other off-plan projects in Madinat Jumeirah Living?

The starting price of Elara Building 3 (AED 2.30M) is 9% below the average starting price of 6 other off-plan projects in Madinat Jumeirah Living, which is AED 2.52M.

What amenities does Elara Building 3 have?

Elara Building 3 lists these amenities: Day Care Center, Gym or Health Club, Kids Play Area, Parking Spaces and Swimming Pool.

Explore more

✦ Want the full picture on Elara Building 3?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 20 Jul 2026.