Art Bay West
by Ellington Properties · 📍 Culture Village (Jaddaf Waterfront)
Price from
AED 1.98M
Art Bay West is a project by Ellington Properties in Culture Village (Jaddaf Waterfront), Dubai. Prices start from AED 1.98M. It offers Studio, 1 Bedroom, 2 Bedroom and 3 Bedroom. Ellington Properties states handover in September 2026. It was 9% built at the official RERA site inspection of 12 May 2026.





Official brochure
Full unit layouts & floor plans are inside the brochure. Source: independent listing source.
| Unit type | Size range | Layouts |
|---|---|---|
| Studio | 430–485 sqft (40–45 m²) | 1 |
| 1 Bedroom | 847–1,010 sqft (79–94 m²) | 1 |
| 2 Bedroom | 1,211–2,426 sqft (113–225 m²) | 1 |
| 3 Bedroom | 1,798–2,459 sqft (167–228 m²) | 1 |
Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.
About the project
Art Bay West will be a new residential development planned for Culture Village, Al Jaddaf, Dubai. This project will be a partnership between Dutco and Ellington Properties. Art Bay West will have a ground floor, 8 residential floors with a rooftop and two levels of parking. Art Bay West Tower will have two passenger elevators and two service elevators. The tower will comprise 8 studio units, 34 1-bedroom units, 90 2-bedroom units, and 35 3-bedroom units. The building will provide direct access to the promenade. Amenities at Art Bay will feature a baja shelf, barbecue deck, bicycle storage, cabanas, central courtyard, children's pool, fitness centre, games room, lobby lounge, mini outdoor theatre, outdoor shower, sun loungers, swimming pool and yoga studio.
Construction progress
9.11% complete at the latest RERA site inspection on 12 May 2026.
Project register as of 16 Oct 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 12 May 2026 | 9.11% | 3 |
| 27 Nov 2025 | 7.76% | 5 |
| 27 Nov 2025 | 7.76% | 5 |
| 2 May 2025 | 6.22% | 5 |
| 6 May 2024 | 0% | 2 |
Escrow account 1009118322 at Commercial Bank Of Dubai(Psc). Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #2996, updated daily. Tap a photo for the full-size original.
Amenities
Art Bay West: questions and answers
What is the starting price of Art Bay West?
Prices at Art Bay West start from AED 1.98M, for homes from 485 sqft (45 m²), as published by Ellington Properties.
What is the payment plan for Art Bay West?
The payment plan published by Ellington Properties for Art Bay West is: 20% down, 50% pre-handover, 30% handover.
When is the handover of Art Bay West?
Ellington Properties states handover of Art Bay West in September 2026.
How much of Art Bay West is built?
Art Bay West was 9% complete at the official RERA site inspection of 12 May 2026.
Is Art Bay West registered with the Dubai Land Department?
Yes. Art Bay West is registered with the Dubai Land Department as project number 2996, and its escrow account is held at Commercial Bank Of Dubai(Psc). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Art Bay West?
Art Bay West is developed by Ellington Properties. The Dubai Land Department project register lists 54 projects for Ellington Properties: 22 delivered and 32 under construction.
Where is Art Bay West located?
Art Bay West is in Culture Village (Jaddaf Waterfront) (Art Bay), Dubai.
What unit types does Art Bay West offer?
Art Bay West offers Studio, 1 Bedroom, 2 Bedroom and 3 Bedroom, with sizes from 485 sqft (45 m²). The project has 173 units in the Dubai Land Department project register.
What amenities does Art Bay West have?
Art Bay West lists these amenities: Barbeque Area, Kids Play Area, Parking Spaces and Swimming Pool.
Explore more
✦ Want the full picture on Art Bay West?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 12 May 2026.
