Alder at Park Five

by Deyaar · 📍 Dubai Production City (IMPZ)

Price from

AED 1.10M

Alder at Park Five is a project by Deyaar in Dubai Production City (IMPZ), Dubai. Prices start from AED 1.10M. It offers 1 Bedroom, 2 Bedroom and 3 Bedroom. Deyaar states handover in December 2027. It was 6% built at the official RERA site inspection of 30 September 2026.

Alder at Park FiveAlder at Park Five 2Alder at Park Five 3Alder at Park Five 4

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓
Unit typeSize rangeLayouts
1 Bedroom—1
2 Bedroom—1
3 Bedroom—1

Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.

About the project

Alder will be the final phase of Park Five in Dubai Production City, designed to enhance community living and promote sustainability. This off-plan project by Deyaar will feature 1, 2 and 3-bedroom apartments designed for balanced and functional living. It will focus on comfort and connection, surrounded by landscaped spaces and recreational zones that encourage a calm atmosphere. Residents will have access to a range of amenities, including separate pools for adults and children, a gym, co-working spaces, retail and dining outlets, green spaces and walkways. The development will be conveniently linked to Sheikh Mohammed Bin Zayed Road (E311) and Al Khail Road (E44) for smooth citywide access.

Construction progress

6.07% complete at the latest RERA site inspection on 30 Sept 2026; scheduled completion 31 Dec 2027.

Project register as of 16 Oct 2026.

Alder at Park Five, Dubai Production City (IMPZ) construction progress, 6.07% complete: RERA site inspection 30 Sept 2026 (photo 1)Alder at Park Five, Dubai Production City (IMPZ) construction progress, 6.07% complete: RERA site inspection 30 Sept 2026 (photo 2)Alder at Park Five, Dubai Production City (IMPZ) construction progress, 6.07% complete: RERA site inspection 30 Sept 2026 (photo 3)Alder at Park Five, Dubai Production City (IMPZ) construction progress, 6.07% complete: RERA site inspection 30 Sept 2026 (photo 4)Alder at Park Five, Dubai Production City (IMPZ) construction progress, 6.07% complete: RERA site inspection 30 Sept 2026 (photo 5)
Alder at Park Five site photos from the RERA inspection on 30 Sept 2026.
InspectionCompletePhotos
30 Sept 20266.07%5
21 Aug 20250%2

Escrow account 001640264465601 at Dubai Islamic Bank (Public Joint Stock Company). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #4052, updated daily. Tap a photo for the full-size original.

Sales velocity

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
1 Bed780–950 sqft (72–88 m²)AED 1.10M14 / 14
2 Beds1,200–1,740 sqft (111–162 m²)AED 1.70M45 / 50
3 Beds1,660–1,750 sqft (154–163 m²)AED 2.40M7 / 8

Independent third-party construction snapshot, not developer-confirmed. Sold counts reflect that source's own tracking and may differ from the other listing data on this page.

Amenities

24 Hours ConciergeBarbeque AreaCafeteria or CanteenConference RoomGym or Health ClubLobby in BuildingParking SpacesSwimming Pool

How it compares in Dubai Production City (IMPZ)

3 other off-plan projects in Dubai Production City (IMPZ) · average entry price AED 600,000 · this project is 83% above that average

Alder at Park Five: questions and answers

What is the starting price of Alder at Park Five?

Prices at Alder at Park Five start from AED 1.10M, for homes from 780 sqft (72 m²), as published by Deyaar.

What is the payment plan for Alder at Park Five?

The payment plan published by Deyaar for Alder at Park Five is: 10% down, 35% pre-handover, 55% handover.

When is the handover of Alder at Park Five?

Deyaar states handover of Alder at Park Five in December 2027. The Dubai Land Department project register lists the completion date of the project as December 2027.

How much of Alder at Park Five is built?

Alder at Park Five was 6% complete at the official RERA site inspection of 30 September 2026.

Is Alder at Park Five registered with the Dubai Land Department?

Yes. Alder at Park Five is registered with the Dubai Land Department as project number 4052, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Alder at Park Five?

Alder at Park Five is developed by Deyaar. The Dubai Land Department project register lists 41 projects for Deyaar: 28 delivered and 10 under construction.

Where is Alder at Park Five located?

Alder at Park Five is in Dubai Production City (IMPZ) (Park Five by Deyaar), Dubai.

What unit types does Alder at Park Five offer?

Alder at Park Five offers 1 Bedroom, 2 Bedroom and 3 Bedroom, with sizes from 780 sqft (72 m²). The project has 75 units in the Dubai Land Department project register.

What amenities does Alder at Park Five have?

Alder at Park Five lists these amenities: 24 Hours Concierge, Barbeque Area, Cafeteria or Canteen, Conference Room, Gym or Health Club, Lobby in Building, Parking Spaces and Swimming Pool.

Explore more

✦ Want the full picture on Alder at Park Five?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 30 Sept 2026.