MADISON RESIDENCY
Data through November 2026 · DLDBy Deyaar, Barsha Heights — 17 registered sales in the last 12 months, at an average of AED 1,180/sqft (AED 12,701/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.
MADISON RESIDENCY: price and rent by number of bedrooms
| Home | Average sale price | AED/sqftAED/m² | Sales | Average rent a year | Rent contracts | Gross yield |
|---|---|---|---|---|---|---|
| Studio | — | — | — | AED 61,104 | 122 | — |
| 1-bedroom | — | — | — | AED 75,604 | 39 | — |
| 2-bedroom | — | — | — | AED 109,531 | 58 | — |
Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (4.2 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 5.2 h | 0.0 h | 2.0 h | 4.3 / 5.6 |
| South-east | 6.4 h | 0.2 h | 7.0 h | 5.7 / 6.9 |
| South-west | 5.5 h | 4.2 h | 6.4 h | 4.8 / 6.1 |
| North-west | 3.9 h | 3.7 h | 1.7 h | 3.3 / 4.5 |
Neighbours shade the lower floors: in summer 4.3 hours a day on a low floor against 5.6 near the top, on the side facing North-east.
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 53 m (around 15 floors). Floors below about 15 on this side may face a new building.
- Plot 3830345, 415 m away, no building on record · site plan: G+14
- South-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 53 m (around 15 floors). Floors below about 15 on this side may face a new building.
- Plot 3830328, 113 m away, no building on record · site plan: G+14
- Plot 3830326, 200 m away, being built · site plan: G+14 · The One By Prestige One
- South-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 179 m (around 51 floors).
- Plot 3830225, 397 m away, being built · site plan: G+50 · The Chedi Private Residences
- Plot 3830248, 400 m away, no building on record · site plan: G+14
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 235 m (around 67 floors).
- Plot 3820774, 498 m away, being built · site plan: G+66 · Iconic
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
How often homes here change hands
17 ready homes sold in the last 12 months, of 311 registered units: about 1 in 18. Across Barsha Heights, apartments: about 1 in 19.
Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.
From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.
Renewing tenants against new tenants
Tenants who renewed in MADISON RESIDENCY pay on average 0.7% less than new tenants of the same bedroom count.
| Bedrooms | New leases (avg/yr) | Renewals (avg/yr) | Renewal vs new |
|---|---|---|---|
| Studio | AED 61,12071 leases | AED 61,08351 leases | -0.1% |
| 1-bedroom | AED 76,23123 leases | AED 74,21715 leases | -2.6% |
| 2-bedroom | AED 109,88336 leases | AED 108,95622 leases | -0.8% |
A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator
From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.
Cooling (chiller)
The owners' association budget for 2026 pays the homes' air-conditioning: AED 5.64/sqft (AED 61/m²) a year, within a total service charge of AED 21.70/sqft (AED 234/m²). So cooling comes with the service charge here, not as a separate bill.
Full year 2026 · Owners' association budget registered with RERA (residential part, per sqft of the unit a year).
District cooling for this building: Empower.
Empower publishes its charges: AED 0.568 per ton-hour of cooling used and AED 750 per ton a year of contracted capacity (the developer sets each home's tons), plus a meter fee and 5% VAT.
Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.
Getting around and build time
Nearest metro: Dubai Internet City Metro Station (Red Metro line), 230 m in a straight line.
Bus stops within 800 m
- Al Barsha Heights, Saleh Bin Lahej Build · 10, 105, 106, 11A180 m
- Dubai Internet City Metro Bus Stop Lands · 10, 104, 105, 106240 m
- Dubai Internet City Metro Station Landsi · F31, F34, F35240 m
- Al Barsha Heights, Mazoon Hotel & Apartm · 10, 105, 106, 11A370 m
- Dubai Internet City, MS Seaside · 85, 88, X28450 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
MADISON RESIDENCY: questions and answers
What is the price per sqft at MADISON RESIDENCY?
Homes at MADISON RESIDENCY sold for an average of AED 1,180/sqft (AED 12,701/m²) over the last 12 months, with the middle half of sales between AED 1,092/sqft (AED 11,754/m²) and AED 1,225/sqft (AED 13,186/m²), from 17 registered sales.
How much is rent at MADISON RESIDENCY?
Average yearly rents at MADISON RESIDENCY over the 12 months to 11 Nov 2026: AED 61,104 for a studio, AED 75,604 for a 1-bedroom and AED 109,531 for a 2-bedroom, from 219 registered rent contracts (Ejari).
How many homes are sold at MADISON RESIDENCY?
MADISON RESIDENCY had 17 registered sales in the last 12 months, all ready homes.
Is MADISON RESIDENCY more expensive than the rest of Barsha Heights?
The average price at MADISON RESIDENCY is AED 1,180/sqft (AED 12,701/m²), 10% below the Barsha Heights average for ready homes over the same 12 months, which is AED 1,315/sqft (AED 14,155/m²).
Where is MADISON RESIDENCY and who built it?
MADISON RESIDENCY is in Barsha Heights, Dubai, and is a Deyaar development.
Explore more
Other buildings in Barsha Heights
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months