ENSO AMBER

Data through November 2026 · DLD
WhatsAppEmail

By Enso Development, Jumeirah Garden City — 35 registered sales in the last 12 months, at an average of AED 2,113/sqft (AED 22,744/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

35
Registered sales
AED 2,113 /sqft
AED 22,744 /m²
Average price per sqft · m²
AED 2,041–2,199/sqft, or AED 21,969–23,670/m²
Typical range (p25–p75)
100%
Off-plan share of sales

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (4.8 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North3.9 h2.0 h0.0 h3.4 / 4.4
East4.7 h0.0 h2.0 h4.0 / 5.4
South5.3 h2.1 h6.2 h4.9 / 5.6
West5.4 h4.8 h3.1 h5.1 / 6.0

Neighbours shade the lower floors: in summer 4.0 hours a day on a low floor against 5.4 near the top, on the side facing East.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 30. The tallest may rise to about 39 m (around 11 floors). Floors below about 11 on this side may face a new building.

    • Plot 3347279, 53 m away, no building on record · site plan: G+8
    • Plot 3347263, 134 m away, no building on record · site plan: G+8
    • Plot 3347257, 162 m away, no building on record · site plan: G+8
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 32 m (around 9 floors). Floors below about 9 on this side may face a new building.

    • Plot 3347288, 182 m away, no building on record · site plan: G+8
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 13. The tallest may rise to about 32 m (around 9 floors). Floors below about 9 on this side may face a new building.

    • Plot 3347282, 74 m away, being built · site plan: G+8 · Evergrin House 4
    • Plot 3347286, 85 m away, no building on record · site plan: G+8
    • Plot 3347275, 148 m away, being built · site plan: G+8 · Elmora
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 34. The tallest may rise to about 39 m (around 11 floors). Floors below about 11 on this side may face a new building.

    • Plot 3347264, 97 m away, no building on record · site plan: G+8
    • Plot 3342736, 180 m away, no building on record · site plan: G+2P+8
    • Plot 3342734, 209 m away, being built · site plan: G+2P+8 · Jardin Astral

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Getting around and build time

Nearest metro: World Trade Centre Metro Station (Red Metro line), 570 m in a straight line.

Bus stops within 800 m

  • White Crown Tower · 10, 103, 104, 105360 m
  • Trade Center Metro Bus Stop · 10, 103, 104, 105440 m
  • Trade Center Metro Station · 21, 98E, F11, F28440 m
  • Durrah Tower · 10, 103, 104, 105560 m
  • Satwa, Square 2 · 10, 102, 103, 104630 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

ENSO AMBER: questions and answers

What is the price per sqft at ENSO AMBER?

Homes at ENSO AMBER sold for an average of AED 2,113/sqft (AED 22,744/m²) over the last 12 months, with the middle half of sales between AED 2,041/sqft (AED 21,969/m²) and AED 2,199/sqft (AED 23,670/m²), from 35 registered sales.

How many homes are sold at ENSO AMBER?

ENSO AMBER had 35 registered sales in the last 12 months, all off-plan.

Where is ENSO AMBER and who built it?

ENSO AMBER is in Jumeirah Garden City, Dubai, and is a Enso Development development.

Explore more

Other buildings in Jumeirah Garden City

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months