Celadon

Data through November 2026 · DLD
WhatsAppEmail

By Meraas, Al Wasl (City Walk, Dubai Water Canal) — 19 registered sales in the last 12 months, at an average of AED 2,860/sqft (AED 30,785/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

19
Registered sales
AED 2,860 /sqft
AED 30,785 /m²
Average price per sqft · m²
AED 2,645–3,190/sqft, or AED 28,471–34,337/m²
Typical range (p25–p75)
0%
Off-plan share of sales

Celadon: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
1-bedroom———AED 122,09345—
2-bedroom———AED 205,28635—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east3.6 h0.0 h0.4 h3.1 / 5.0
South-east6.2 h0.0 h5.8 h5.7 / 6.6
South-west7.4 h5.7 h9.2 h7.4 / 7.4
North-west4.2 h3.9 h3.6 h4.1 / 5.6

Neighbours shade the lower floors: in summer 3.1 hours a day on a low floor against 5.0 near the top, on the side facing North-east.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 84 m (around 24 floors).

    • Plot 3431248, 325 m away, being built · site plan: G+23 · Central Park Plaza
    • Plot 3431238, 384 m away, being built · site plan: G+P+8 · City Walk Northline 2
    • Plot 3431252, 453 m away, being built · site plan: G+P+15 · City Walk Northline 1
  • South-east

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • South-west

    The planning register covers too little of what lies in front of this side to say what may be built there.

  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 49 m (around 14 floors).

    • Plot 3431275, 406 m away, being built · site plan: G+13 · City Walk Crestlane 2
    • Plot 3431249, 443 m away, being built · site plan: G+12 · City Walk Crestlane 1

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How often homes here change hands

19 ready homes sold in the last 12 months, of 160 registered units: about 1 in 8. Across Al Wasl (City Walk, Dubai Water Canal), apartments: about 1 in 11.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Getting around and build time

Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 990 m in a straight line.

Bus stops within 800 m

  • City Walk 2 · 10, 106, 12, 13120 m
  • DEWA Al Wasl Customer Happiness Center 2 · C14, 10, 106, 12410 m
  • Mazaya Center 2 · 11A, 12, 13, 13A680 m
  • Safa, Safest Way 2 · 98E, C14, 10, 106710 m
  • City Walk 1 · 10, 102, 103, 104740 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

Celadon: questions and answers

What is the price per sqft at Celadon?

Homes at Celadon sold for an average of AED 2,860/sqft (AED 30,785/m²) over the last 12 months, with the middle half of sales between AED 2,645/sqft (AED 28,471/m²) and AED 3,190/sqft (AED 34,337/m²), from 19 registered sales.

How much is rent at Celadon?

Average yearly rents at Celadon over the 12 months to 11 Nov 2026: AED 122,093 for a 1-bedroom and AED 205,286 for a 2-bedroom, from 80 registered rent contracts (Ejari).

How many homes are sold at Celadon?

Celadon had 19 registered sales in the last 12 months, all ready homes.

Where is Celadon and who built it?

Celadon is in Al Wasl (City Walk, Dubai Water Canal), Dubai, and is a Meraas development.

Explore more

Other buildings in Al Wasl (City Walk, Dubai Water Canal)

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months