Erin

Data through November 2026 · DLD
WhatsAppEmail

By Meraas, Al Wasl (City Walk, Dubai Water Canal) — 30 registered sales in the last 12 months, at an average of AED 2,922/sqft (AED 31,452/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

30
Registered sales
AED 2,922 /sqft
AED 31,452 /m²
Average price per sqft · m²
AED 2,699–3,139/sqft, or AED 29,052–33,788/m²
Typical range (p25–p75)
57%
Off-plan share of sales

Erin: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
1-bedroom———AED 131,53732—
2-bedroom———AED 197,38918—

Off-plan sales, last 12 months (5+ sales per type). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east5.1 h0.0 h0.2 h4.5 / 5.3
South-east5.9 h0.0 h6.8 h5.1 / 6.4
South-west7.3 h5.7 h9.0 h7.3 / 7.3
North-west5.3 h5.1 h3.5 h3.5 / 5.9

Neighbours shade the lower floors: in summer 3.5 hours a day on a low floor against 5.9 near the top, on the side facing North-west.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 84 m (around 24 floors).

    • Plot 3431248, 275 m away, being built · site plan: G+23 · Central Park Plaza
    • Plot 3431238, 370 m away, being built · site plan: G+P+8 · City Walk Northline 2
    • Plot 3431252, 373 m away, being built · site plan: G+P+15 · City Walk Northline 1
  • South-east

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • South-west

    The planning register covers too little of what lies in front of this side to say what may be built there.

  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 49 m (around 14 floors).

    • Plot 3431275, 280 m away, being built · site plan: G+13 · City Walk Crestlane 2
    • Plot 3431249, 315 m away, being built · site plan: G+12 · City Walk Crestlane 1
    • Plot 3431276, 414 m away, being built · site plan: G+11 · City Walk Crestlane 3

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Getting around and build time

Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 1.1 km in a straight line.

Bus stops within 800 m

  • City Walk 2 · 10, 106, 12, 1380 m
  • DEWA Al Wasl Customer Happiness Center 2 · 10, 106, 12, 13520 m
  • Jumeirah, Post Office 1 · 10, 102, 103, 104670 m
  • Jumeira, Post Office 2 · 12, 15, 81, 93700 m
  • Jumeirah, Post Office 2 · 10, 102, 103, 104700 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

Erin: questions and answers

What is the price per sqft at Erin?

Homes at Erin sold for an average of AED 2,922/sqft (AED 31,452/m²) over the last 12 months, with the middle half of sales between AED 2,699/sqft (AED 29,052/m²) and AED 3,139/sqft (AED 33,788/m²), from 30 registered sales.

How much is rent at Erin?

Average yearly rents at Erin over the 12 months to 11 Nov 2026: AED 131,537 for a 1-bedroom and AED 197,389 for a 2-bedroom, from 50 registered rent contracts (Ejari).

How many homes are sold at Erin?

Erin had 30 registered sales in the last 12 months: 13 ready homes and 17 off-plan.

Where is Erin and who built it?

Erin is in Al Wasl (City Walk, Dubai Water Canal), Dubai, and is a Meraas development.

Explore more

Other buildings in Al Wasl (City Walk, Dubai Water Canal)

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months