Mirdad

by Union Properties · 📍 Motor City

Mirdad is a project by Union Properties in Motor City, Dubai. The Dubai Land Department project register lists completion for December 2028. It was 6% built at the official RERA site inspection of 28 September 2026.

Mirdad

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓

About the project

Mirdad Towers by Union Properties is an off-plan residential complex that will redefine urban living in Dubai. Located within Dubai's most vibrant Motor City, this highly anticipated project will feature four high-rise residential towers. The project will blend architectural sophistication with a deep sense of belonging to offer a dynamic living experience. It will offer well-designed studios as well as 1, 2 and 3-bedroom apartments, lofts and duplexes with premium interiors. The masterplan also features several outdoor amenities, such as landscaped greenery, recreational zones and communal spaces. Mirdad 1 Mirdad 1 is one of the four off-plan residential towers belonging to the Mirdad complex in Motor City, Dubai. This 19-storey building will offer a vibrant living environment courtesy of wrapped-around green lawns and dedicated recreational spaces. It will feature a mix of studios as well as 1 to 3-bedroom apartments, lofts and duplexes with spacious layouts to maximise space and natural light. Mirdad 2 Soaring 31 floors tall, Mirdad 2 extends the community’s core vision of high-end living amidst well-thought-out amenities. This off-plan phase emphasises versatility and active living through flexible layouts across all residential options, including studios, apartments, lofts and duplexes. Mirdad 2 is specifically designed to feature open-air zones and functional indoor spaces, encouraging natural social interaction, connection and physical activity. Mirdad 3 Mirdad 3 will be the tallest tower in the Mirdad complex in Motor City, Dubai. Standing 39 storeys tall, this tower elevates the lifestyle concept of the project by harmonising grand, open communal areas with meticulously crafted interiors. It will offset the full spectrum of residential options available in this complex with the design philosophy of spatial freedom without comprising connectivity. Mirdad 4 Mirdad 4, being only 13 floors tall, will complete the Mirdad complex. This specific tower is planned to offer a private yet highly dynamic atmosphere with fewer residential units and access to communal amenities. It will focus heavily on wellness and recreation as it is planned around landscaped parks, pocket gardens and specialised activity zones. It will also offer a signature mix of studios, 1, 2 and 3-bedroom apartments, lofts and duplexes.

Construction progress

6.02% complete at the latest RERA site inspection on 28 Sept 2026; scheduled completion 31 Dec 2028.

Project register as of 15 Oct 2026.

Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 1)Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 2)Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 3)Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 4)Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 5)Mirdad, Motor City construction progress, 6.02% complete: RERA site inspection 28 Sept 2026 (photo 6)
Mirdad site photos from the RERA inspection on 28 Sept 2026.
InspectionCompletePhotos
28 Sept 20266.02%6
19 Jun 20262.83%5
24 Oct 20250.27%2

Escrow account 001640218978101 at Dubai Islamic Bank (Public Joint Stock Company). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #4158, updated daily. Tap a photo for the full-size original.

How it compares in Motor City

13 other off-plan projects in Motor City · average entry price AED 1.31M

Mirdad: questions and answers

When is the handover of Mirdad?

The Dubai Land Department project register lists the completion date of Mirdad as December 2028.

How much of Mirdad is built?

Mirdad was 6% complete at the official RERA site inspection of 28 September 2026.

Is Mirdad registered with the Dubai Land Department?

Yes. Mirdad is registered with the Dubai Land Department as project number 4158, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Mirdad?

Mirdad is developed by Union Properties. The Dubai Land Department project register lists 4 projects for Union Properties: 1 delivered and 2 under construction.

Where is Mirdad located?

Mirdad is in Motor City (Mirdad), Dubai.

What unit types does Mirdad offer?

The project has 1,114 units in the Dubai Land Department project register.

What is the average price per sqft in Motor City?

Apartments in Motor City sell for about AED 1,003/sqft (AED 10,792/m²), based on 746 registered sales in the last 12 months.

What rental yield can I expect in Motor City?

Apartments in Motor City yield about 7.2% gross, or about 5.6% net after service charges, based on 1,940 registered rent contracts and 746 sales in the last 12 months.

What are the service charges in Motor City?

Service charges for apartments in Motor City are about AED 15.71/sqft (AED 169/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

Explore more

✦ Want the full picture on Mirdad?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 28 Sept 2026.