Dubai Harbour Residences (Area 1)

by H&H Development · 📍 Dubai Harbour

Price from

AED 5.10M

Dubai Harbour Residences (Area 1) is a project by H&H Development in Dubai Harbour, Dubai. Prices start from AED 5.10M. It offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom. H&H Development states handover in January 2028. It was 30% built at the official RERA site inspection of 11 August 2026.

Dubai Harbour Residences (Area 1)Dubai Harbour Residences (Area 1) 2Dubai Harbour Residences (Area 1) 3Dubai Harbour Residences (Area 1) 4Dubai Harbour Residences (Area 1) 5

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓
Unit typeSize rangeLayouts
1 Bedroom—1
2 Bedroom—1
3 Bedroom—1
4 Bedroom—1
Penthouse—1

Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.

About the project

Dubai Harbour Residences (Area 1) is an exceptional selection of beachfront homes, masterfully designed by the renowned architect Nikken Sekkei. Perfectly situated in the heart of Dubai Harbour, these 1 to 4-bedroom apartments and penthouses offer unparalleled access to lively marinas, a private beach and upscale leisure and retail destinations. With the central areas of the city not far, thanks to seamless connectivity via Dubai Harbour Bridge, residents can savour stunning panoramic views from a range of unique layouts. Dubai Harbour Residences (Area 1) invites you to experience a new standard of coastal living. It is a joint venture by Shamal Holding and H&H Development.

Construction progress

30.25% complete at the latest RERA site inspection on 11 Aug 2026; scheduled completion 14 Jan 2028.

Project register as of 15 Oct 2026.

Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 1)Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 2)Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 3)Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 4)Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 5)Dubai Harbour Residences (Area 1), Dubai Harbour construction progress, 30.25% complete: RERA site inspection 11 Aug 2026 (photo 6)
Dubai Harbour Residences (Area 1) site photos from the RERA inspection on 11 Aug 2026 (6 of 10 shown).
InspectionCompletePhotos
11 Aug 202630.25%10
20 Apr 202615.86%5
7 Jul 20251.43%4
12 Jun 20240%2

Escrow account 0205887629202 at Emirates Nbd Bank (P.J.S.C). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #3133, updated daily. Tap a photo for the full-size original.

Sales velocity

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
1 Bed1,010–1,020 sqft (94–95 m²)AED 5.10M55 / 55
2 Beds2,100–2,940 sqft (195–273 m²)AED 9.50M72 / 88
3 Beds2,710–3,780 sqft (252–351 m²)AED 11.10M54 / 56

Independent third-party construction snapshot, not developer-confirmed. Sold counts reflect that source's own tracking and may differ from the other listing data on this page.

Amenities

Gym or Health ClubKids Play AreaOther RoomsReception/Waiting Room

How it compares in Dubai Harbour

6 other off-plan projects in Dubai Harbour · average entry price AED 4.60M · this project is 11% above that average

Dubai Harbour Residences (Area 1): questions and answers

What is the starting price of Dubai Harbour Residences (Area 1)?

Prices at Dubai Harbour Residences (Area 1) start from AED 5.10M, for homes from 1,055 sqft (98 m²), as published by H&H Development.

What is the payment plan for Dubai Harbour Residences (Area 1)?

The payment plan published by H&H Development for Dubai Harbour Residences (Area 1) is: 5% down, 55% pre-handover, 40% handover.

When is the handover of Dubai Harbour Residences (Area 1)?

H&H Development states handover of Dubai Harbour Residences (Area 1) in January 2028. The Dubai Land Department project register lists the completion date of the project as January 2028.

How much of Dubai Harbour Residences (Area 1) is built?

Dubai Harbour Residences (Area 1) was 30% complete at the official RERA site inspection of 11 August 2026.

Is Dubai Harbour Residences (Area 1) registered with the Dubai Land Department?

Yes. Dubai Harbour Residences (Area 1) is registered with the Dubai Land Department as project number 3133, and its escrow account is held at Emirates Nbd Bank (P.J.S.C). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Dubai Harbour Residences (Area 1)?

Dubai Harbour Residences (Area 1) is developed by H&H Development. The Dubai Land Department project register lists 8 projects for H&H Development: 1 delivered and 7 under construction.

Where is Dubai Harbour Residences (Area 1) located?

Dubai Harbour Residences (Area 1) is in Dubai Harbour (Dubai Harbour Residences), Dubai.

What unit types does Dubai Harbour Residences (Area 1) offer?

Dubai Harbour Residences (Area 1) offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom, with sizes from 1,055 sqft (98 m²). The project has 217 units in the Dubai Land Department project register.

What amenities does Dubai Harbour Residences (Area 1) have?

Dubai Harbour Residences (Area 1) lists these amenities: Gym or Health Club, Kids Play Area, Other Rooms and Reception/Waiting Room.

Explore more

✦ Want the full picture on Dubai Harbour Residences (Area 1)?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 11 Aug 2026.