City Walk Crestlane 5 Building A is a project by Meraas in City Walk, Dubai. Prices start from AED 2.80M. It offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom. Its handover is listed for April 2030. It was 0% built at the official RERA site inspection of 6 October 2026.
Official brochure
Layouts and floor plans inside. Source: independent listing.
About the project
City Walk Crestlane 5 Building A will be a residential development in City Walk, Dubai, set within a vibrant urban district defined by open spaces and engaging communal areas. The upcoming project by Meraas will offer 1, 2, 3, and 4-bedroom apartments and 4-bedroom duplexes designed to provide spacious layouts and an airy living environment. Residents will have access to various amenities, including water features, swimming pools, sports courts, kids’ play areas, outdoor fitness stations, community hubs, event lawns, yoga and exercise lawns, sunken seats and jogging tracks. The development will connect via Al Wasl Road (D92) and Al Safa Street (D73), ensuring smooth access across Dubai.
Construction progress
0.01% complete at the latest RERA site inspection on 6 Oct 2026; scheduled completion 25 Apr 2030.
Project register as of 15 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 6 Oct 2026 | 0.01% | 4 |
| 12 Jun 2026 | 0.01% | 3 |
| 4 Dec 2025 | 0% | 3 |
Escrow account 10502351920030 at Abu Dhabi Commercial Bank. Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #4274, updated daily. Tap a photo for the full-size original.
Paid against built
On this plan a buyer pays 75% of the price before the keys and 25% on handover.
By the inspection of 6 Oct 2026, on an even schedule, payments ran 28 points ahead of the building. That is usual during a build (the booking is paid up front); payments go into the project's escrow account and the developer draws them only against inspected progress.
Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 5.6 / 5.6 |
| East | 6.3 h | 0.0 h | 5.2 h | 6.2 / 6.3 |
| South | 6.1 h | 2.4 h | 10.5 h | 6.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 6.3 / 6.3 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 130 m (around 37 floors).
- Plot 3431288, 165 m away, no building on record · site plan: G+36
- Plot 3431293, 191 m away, no building on record · site plan: G+12
- Plot 3431297, 266 m away, no building on record · site plan: G+12
- East
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 84 m (around 24 floors).
- Plot 3431234, 128 m away, being built · site plan: G+12 · City Walk Crestlane 4
- Plot 3431252, 275 m away, being built · site plan: G+P+15 · City Walk Northline 1
- Plot 3431248, 390 m away, being built · site plan: G+23 · Central Park Plaza
- South
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 49 m (around 14 floors). Floors below about 14 on this side may face a new building.
- Plot 3431276, 152 m away, being built · site plan: G+11 · City Walk Crestlane 3
- Plot 3431275, 203 m away, being built · site plan: G+13 · City Walk Crestlane 2
- Plot 3431249, 288 m away, being built · site plan: G+12 · City Walk Crestlane 1
- West
The planning register covers too little of what lies in front of this side to say what may be built there.
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Amenities
Who's selling this project
9 agencies are currently listing units in City Walk Crestlane 5 Building A across 13 listings, from AED 2.80M to AED 18.08M depending on unit size and floor.
| Agency | Listings | Asking range | Trust |
|---|---|---|---|
| 2 | AED 2.80M – AED 17.98M | 2 verified | |
| 2 | AED 2.80M – AED 2.82M | 2 verified | |
| 2 | AED 2.80M – AED 17.98M | 2 verified · Trusted broker | |
| 2 | AED 2.82M – AED 18.08M | 2 verified · Trusted broker | |
| 1 | AED 3.76M | 1 verified · Trusted broker | |
| 1 | AED 2.80M | 1 verified · Trusted broker | |
| 1 | AED 18.08M | 1 verified · Trusted broker | |
| 1 | AED 18.08M | 1 verified · Trusted broker | |
| 1 | AED 2.82M | 1 verified · Trusted broker |
Tap an agency to see its listings and call or WhatsApp the agent (sign in).
Live agency asking prices across unit types and floors — not sold prices.
How it compares in City Walk
8 other off-plan projects in City Walk · average entry price AED 2.58M · this project is 8% above that average
City Walk Crestlane 5 Building A: questions and answers
What is the starting price of City Walk Crestlane 5 Building A?
Prices at City Walk Crestlane 5 Building A start from AED 2.80M, for homes from 793 sqft (74 m²), as listed for sale.
What is the payment plan for City Walk Crestlane 5 Building A?
The payment plan listed for City Walk Crestlane 5 Building A is: 20% down, 55% pre-handover, 25% handover.
When is the handover of City Walk Crestlane 5 Building A?
The handover of City Walk Crestlane 5 Building A is listed for April 2030. The Dubai Land Department project register lists the completion date of the project as April 2030.
How much of City Walk Crestlane 5 Building A is built?
City Walk Crestlane 5 Building A was 0% complete at the official RERA site inspection of 6 October 2026.
Is City Walk Crestlane 5 Building A registered with the Dubai Land Department?
Yes. City Walk Crestlane 5 Building A is registered with the Dubai Land Department as project number 4274, and its escrow account is held at Abu Dhabi Commercial Bank. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of City Walk Crestlane 5 Building A?
City Walk Crestlane 5 Building A is developed by Meraas. The Dubai Land Department project register lists 76 projects for Meraas: 39 delivered and 36 under construction.
Where is City Walk Crestlane 5 Building A located?
City Walk Crestlane 5 Building A is in City Walk (City Walk Crestlane 5), Dubai.
What unit types does City Walk Crestlane 5 Building A offer?
City Walk Crestlane 5 Building A offers 1 Bedroom, 2 Bedroom, 3 Bedroom and 4 Bedroom, with sizes from 793 sqft (74 m²). The project has 161 units in the Dubai Land Department project register.
How does City Walk Crestlane 5 Building A compare with other off-plan projects in City Walk?
The starting price of City Walk Crestlane 5 Building A (AED 2.80M) is 8% above the average starting price of 8 other off-plan projects in City Walk, which is AED 2.58M.
What is the average price per sqft in City Walk?
Apartments in City Walk sell for about AED 2,756/sqft (AED 29,669/m²), based on 258 registered sales in the last 12 months.
What rental yield can I expect in City Walk?
Apartments in City Walk yield about 5.3% gross, or about 4.6% net after service charges, based on 1,134 registered rent contracts and 258 sales in the last 12 months.
What are the service charges in City Walk?
Service charges for apartments in City Walk are about AED 18.95/sqft (AED 204/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.
What amenities does City Walk Crestlane 5 Building A have?
City Walk Crestlane 5 Building A lists these amenities: Gym or Health Club, Kids Play Area, Lawn or Garden and Swimming Pool.
Explore more
✦ Want the full picture on City Walk Crestlane 5 Building A?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 6 Oct 2026.



