Central Park

by Meraas · 📍 City Walk

WhatsAppEmail

Central Park is a project by Meraas in City Walk, Dubai. Its handover is listed for September 2027. It was 44% built at the official RERA site inspection of 1 September 2026.

About the project

Central Park is an up-and-coming residential community in City Walk – part of Al Wasl, Dubai. Developed by Meraas, the community will feature 12 residential buildings around lush greenery and a wide range of amenities. These buildings will feature 1, 2, 3, and 4-bedroom apartments, as well as penthouses and townhouses, all with elegant designs that blend luxury and serenity. Upon completion, residents will be able to enjoy a myriad of amenities, including swimming pools, a running track, a dog park, sports courts and much more. Its prime location allows for easy access to Jumeirah Beach, Burj Al Arab, the Coca-Cola Arena, and Dubai International Airport within a short drive. Central Park Plaza Central Park Plaza is an off-plan residential project featuring apartments, penthouses and townhouses that blend comfort, sophistication and natural beauty. Central Park Plaza Tower A Part of the Central Park Plaza, Tower A will feature 1 to 4-bed apartments as well as penthouses and townhouses. Central Park Plaza Tower B Central Park Plaza Tower B will feature apartments, penthouses and townhouses that blend modern design with natural elements. Building 1 Central Park Building 1 will feature 1 to 4-bedroom apartments that are planned to offer an active and healthier lifestyle. Celadon Developed by Meraas, Celadon at Central Park will feature three mid-rise residential buildings with 1-, 2-, and 3-bedroom apartments in a healthy, green environment. Thyme at Central Park Thyme at Central Park is a 10-storey residential building offering easy access to amenities in a lush green setting. Viridian Viridian is a residential project in City Walk Dubai that will feature premium residences, high-end amenities and a serene environment. Erin Erin at Central Park is a residential project within Al Wasl that will feature an upscale living environment and high-end amenities. Fern Fern at Central Park will feature 1 to 4-bedroom apartments and penthouses that blend modern design with natural elements. Laurel Laurel is the epitome of an urban jungle featuring meticulously designed 1 to 4-bed apartments and penthouses set amidst lush greenery. Castleton Castleton is an off-plan residential project situated in Central Park, featuring 1 to 4-bedroom apartments in a serene setting. Myrtle Myrtle will feature 1 and 2-bedroom apartments with stunning, bright interiors and spacious terraces offering community views.

Construction progress

43.68% complete at the latest RERA site inspection on 1 Sept 2026; originally scheduled 8 Oct 2026.

Project register as of 15 Nov 2026.

Central Park site photos from the RERA inspection on 1 Sept 2026 (6 of 10 shown).
InspectionCompletePhotos
1 Sept 202643.68%10
19 May 202634.63%8
13 Feb 202626.1%6
3 Nov 202516.44%4
6 Aug 202510.67%6
13 May 20257.02%5
5 Feb 20256.05%3
21 Sept 20245.35%4

Escrow account 0205778523502 at Emirates Nbd Bank (P.J.S.C). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #2796, updated daily. Tap a photo for the full-size original.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.2 / 5.6
East6.3 h0.0 h5.2 h6.2 / 6.3
South6.1 h2.4 h10.2 h5.9 / 6.1
West6.3 h5.7 h4.8 h5.9 / 6.3

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 130 m (around 37 floors).

    • Plot 3431252, 147 m away, being built · site plan: G+P+15 · City Walk Northline 1
    • Plot 3431288, 470 m away, no building on record · site plan: G+36
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 35 m (around 10 floors). Floors below about 10 on this side may face a new building.

    • Plot 3431238, 126 m away, being built · site plan: G+P+8 · City Walk Northline 2
  • South

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 49 m (around 14 floors). Floors below about 14 on this side may face a new building.

    • Plot 3431234, 265 m away, being built · site plan: G+12 · City Walk Crestlane 4
    • Plot 3431275, 288 m away, being built · site plan: G+13 · City Walk Crestlane 2
    • Plot 3431217, 390 m away, being built · site plan: G+12 · City Walk Crestlane 5

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Central Park: questions and answers

When is the handover of Central Park?

The handover of Central Park is listed for September 2027. The Dubai Land Department project register lists October 2026 as the original completion date of the project; it is still under construction.

How much of Central Park is built?

Central Park was 44% complete at the official RERA site inspection of 1 September 2026.

Is Central Park registered with the Dubai Land Department?

Yes. Central Park is registered with the Dubai Land Department as project number 2796, and its escrow account is held at Emirates Nbd Bank (P.J.S.C). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Central Park?

Central Park is developed by Meraas. The Dubai Land Department project register lists 76 projects for Meraas: 39 delivered and 36 under construction.

Where is Central Park located?

Central Park is in City Walk (Central Park), Dubai.

What unit types does Central Park offer?

The project has 212 units in the Dubai Land Department project register.

What is the average price per sqft in City Walk?

Apartments in City Walk sell for about AED 2,756/sqft (AED 29,669/m²), based on 258 registered sales in the last 12 months.

What rental yield can I expect in City Walk?

Apartments in City Walk yield about 5.3% gross, or about 4.6% net after service charges, based on 1,134 registered rent contracts and 258 sales in the last 12 months.

What are the service charges in City Walk?

Service charges for apartments in City Walk are about AED 18.95/sqft (AED 204/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

Explore more

✦ Want the full picture on Central Park?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 1 Sept 2026.