Celadon

by Meraas · 📍 City Walk

WhatsAppEmail

Celadon is a project by Meraas in City Walk, Dubai. The Dubai Land Department project register lists completion for November 2024. It was 100% built at the official RERA site inspection of 30 September 2025.

About the project

Celadon Celadon is a residential cluster by Meraas Holding, located in Central Park at City Walk, Dubai. The development will consist of three L-shaped mid-rise buildings, offering a selection of 1, 2, and 3-bedroom apartments. Designed with a focus on green living, Celadon will be surrounded by landscaped spaces, shaded walkways and recreational areas that promote a healthier lifestyle within the city. Residents will have access to a wide range of amenities, including infinity and leisure pools, a state-of-the-art fitness centre, rooftop gardens, shaded picnic areas, outdoor sports facilities and play areas for children. The development’s central location in City Walk enables easy access to Downtown Dubai, Jumeirah, and Sheikh Zayed Road, connecting residents to the rest of the city. Celadon 1 Celadon 1 will feature contemporary apartments designed with spacious layouts. The residences will overlook the community’s landscaped green areas, with amenities such as fitness centres, swimming pools, and open recreational spaces complementing the lifestyle offering. Celadon 2 Celadon 2 will be located within the Jumeirah neighbourhood at City Walk, offering residents convenient access to major city landmarks and attractions. Apartments will range from 1 to 3-bedrooms, all set within a green community environment supported by modern facilities and pedestrian-friendly spaces. Celadon 3 Celadon 3 will continue the community’s design theme with modern apartments emphasising open layouts and natural light. The building will be surrounded by green landscapes, sports and fitness facilities, and family-friendly leisure areas, creating a setting where residents can balance work and lifestyle within a vibrant urban environment.

Construction progress

Finished

100% complete at the latest RERA site inspection on 30 Sept 2025; completed 1 Nov 2024.

Project register as of 22 Nov 2026.

Celadon site photos from the RERA inspection on 30 Sept 2025 (6 of 14 shown).
InspectionCompletePhotos
30 Sept 2025100%14
26 Sept 202599.01%14
26 Aug 202594.32%9
13 May 202581.01%12
6 Feb 202570.66%7
21 Mar 202420.01%7
21 Mar 202420.01%7
15 Aug 20235.88%3

Official RERA site-inspection records for registered project #2325, updated daily. Tap a photo for the full-size original.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east3.6 h0.0 h0.4 h3.1 / 5.0
South-east6.2 h0.0 h5.8 h5.7 / 6.6
South-west7.4 h5.7 h9.2 h7.4 / 7.4
North-west4.2 h3.9 h3.6 h4.1 / 5.6

Neighbours shade the lower floors: in summer 3.1 hours a day on a low floor against 5.0 near the top, on the side facing North-east.

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 84 m (around 24 floors).

    • Plot 3431248, 325 m away, being built · site plan: G+23 · Central Park Plaza
    • Plot 3431238, 384 m away, being built · site plan: G+P+8 · City Walk Northline 2
    • Plot 3431252, 453 m away, being built · site plan: G+P+15 · City Walk Northline 1
  • South-east

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • South-west

    The planning register covers too little of what lies in front of this side to say what may be built there.

  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 49 m (around 14 floors).

    • Plot 3431275, 406 m away, being built · site plan: G+13 · City Walk Crestlane 2
    • Plot 3431249, 443 m away, being built · site plan: G+12 · City Walk Crestlane 1

See the plots on the 3D map

Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Celadon: questions and answers

When is the handover of Celadon?

The Dubai Land Department project register lists the completion date of Celadon as November 2024.

How much of Celadon is built?

Celadon was 100% complete at the official RERA site inspection of 30 September 2025.

Is Celadon registered with the Dubai Land Department?

Yes. Celadon is registered with the Dubai Land Department as project number 2325, and its escrow account is held at Commercial Bank Of Dubai(Psc). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Celadon?

Celadon is developed by Meraas. The Dubai Land Department project register lists 76 projects for Meraas: 39 delivered and 36 under construction.

Where is Celadon located?

Celadon is in City Walk (Central Park), Dubai.

What unit types does Celadon offer?

The project has 161 units in the Dubai Land Department project register.

What is the average price per sqft in City Walk?

Apartments in City Walk sell for about AED 2,756/sqft (AED 29,670/m²), based on 261 registered sales in the last 12 months.

What rental yield can I expect in City Walk?

Apartments in City Walk yield about 5.3% gross, or about 4.6% net after service charges, based on 1,151 registered rent contracts and 261 sales in the last 12 months.

What are the service charges in City Walk?

Service charges for apartments in City Walk are about AED 18.95/sqft (AED 204/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

Explore more

✦ Want the full picture on Celadon?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 30 Sept 2025.