Celadon 1 is a project by Meraas in City Walk, Dubai. Prices start from AED 1.28M. It offers 1 Bedroom, 2 Bedroom and 3 Bedroom. Its handover is listed for November 2024. It was 100% built at the official RERA site inspection of 30 September 2025.
About the project
<p>Celadon 1 is an upcoming residential project developed by Meraas Holding in City Walk Al Wasl. It is located within Central Park as one of the three towers of the residential complex offering apartments with 1, 2, and 3 bedrooms. Each residential unit in the apartment building includes a spacious living area, a fully equipped kitchen, a maid's room with an attached bathroom, and a balcony. The master plan for Celadon 3 encompasses various modern fitness and recreational amenities, such as a gymnasium and swimming pools. Additionally, residents will have access to barbecue areas, sports courts, and a dog park.
Construction progress
Finished100% complete at the latest RERA site inspection on 30 Sept 2025; completed 1 Nov 2024.
Project register as of 15 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 30 Sept 2025 | 100% | 14 |
| 26 Sept 2025 | 99.01% | 14 |
| 26 Aug 2025 | 94.32% | 9 |
| 13 May 2025 | 81.01% | 12 |
| 6 Feb 2025 | 70.66% | 7 |
| 21 Mar 2024 | 20.01% | 7 |
| 21 Mar 2024 | 20.01% | 7 |
| 15 Aug 2023 | 5.88% | 3 |
Official RERA site-inspection records for registered project #2325, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 3.6 h | 0.0 h | 0.4 h | 3.1 / 5.0 |
| South-east | 6.2 h | 0.0 h | 5.8 h | 5.7 / 6.6 |
| South-west | 7.4 h | 5.7 h | 9.2 h | 7.4 / 7.4 |
| North-west | 4.2 h | 3.9 h | 3.6 h | 4.1 / 5.6 |
Neighbours shade the lower floors: in summer 3.1 hours a day on a low floor against 5.0 near the top, on the side facing North-east.
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 84 m (around 24 floors).
- Plot 3431248, 325 m away, being built · site plan: G+23 · Central Park Plaza
- Plot 3431238, 384 m away, being built · site plan: G+P+8 · City Walk Northline 2
- Plot 3431252, 453 m away, being built · site plan: G+P+15 · City Walk Northline 1
- South-east
No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.
- South-west
The planning register covers too little of what lies in front of this side to say what may be built there.
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 49 m (around 14 floors).
- Plot 3431275, 406 m away, being built · site plan: G+13 · City Walk Crestlane 2
- Plot 3431249, 443 m away, being built · site plan: G+12 · City Walk Crestlane 1
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Amenities
How it compares in City Walk
9 other off-plan projects in City Walk · average entry price AED 2.61M · this project is 51% below that average
Celadon 1: questions and answers
What is the starting price of Celadon 1?
Prices at Celadon 1 start from AED 1.28M, for homes from 710 sqft (66 m²), as listed for sale.
What is the payment plan for Celadon 1?
The payment plan listed for Celadon 1 is: 10% down, 40% pre-handover, 50% handover.
When is the handover of Celadon 1?
The handover of Celadon 1 is listed for November 2024. The Dubai Land Department project register lists the completion date of the project as November 2024.
How much of Celadon 1 is built?
Celadon 1 was 100% complete at the official RERA site inspection of 30 September 2025.
Is Celadon 1 registered with the Dubai Land Department?
Yes. Celadon 1 is registered with the Dubai Land Department as project number 2325, and its escrow account is held at Commercial Bank Of Dubai(Psc). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Celadon 1?
Celadon 1 is developed by Meraas. The Dubai Land Department project register lists 76 projects for Meraas: 39 delivered and 36 under construction.
Where is Celadon 1 located?
Celadon 1 is in City Walk (Central Park), Dubai.
What unit types does Celadon 1 offer?
Celadon 1 offers 1 Bedroom, 2 Bedroom and 3 Bedroom, with sizes from 710 sqft (66 m²). The project has 161 units in the Dubai Land Department project register.
How does Celadon 1 compare with other off-plan projects in City Walk?
The starting price of Celadon 1 (AED 1.28M) is 51% below the average starting price of 9 other off-plan projects in City Walk, which is AED 2.61M.
What is the average price per sqft in City Walk?
Apartments in City Walk sell for about AED 2,756/sqft (AED 29,669/m²), based on 258 registered sales in the last 12 months.
What rental yield can I expect in City Walk?
Apartments in City Walk yield about 5.3% gross, or about 4.6% net after service charges, based on 1,134 registered rent contracts and 258 sales in the last 12 months.
What are the service charges in City Walk?
Service charges for apartments in City Walk are about AED 18.95/sqft (AED 204/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.
What amenities does Celadon 1 have?
Celadon 1 lists these amenities: Gym or Health Club, Lawn or Garden, Nearby Shopping Malls, Sauna and Swimming Pool.
Explore more
✦ Want the full picture on Celadon 1?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 30 Sept 2025.



