UPPER CREST

Data through November 2026 · DLD
WhatsAppEmail

By Damac Properties, Downtown Dubai — 16 registered sales in the last 12 months, at an average of AED 1,673/sqft (AED 18,008/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

16
Registered sales
AED 1,673 /sqft
AED 18,008 /m²
Average price per sqft · m²
AED 1,531–1,729/sqft, or AED 16,480–18,611/m²
Typical range (p25–p75)
0%
Off-plan share of sales

UPPER CREST: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
Studio———AED 63,89032—
1-bedroom———AED 93,03289—
2-bedroom———AED 131,12538—
3-bedroom———AED 170,61513—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (3.2 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east1.7 h0.0 h2.3 h1.3 / 4.8
South-east6.7 h0.2 h7.8 h5.9 / 6.7
South-west4.5 h3.2 h5.4 h4.0 / 4.9
North-west3.1 h2.9 h0.9 h2.6 / 3.7

Neighbours shade the lower floors: in summer 1.3 hours a day on a low floor against 4.8 near the top, on the side facing North-east.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 126 m (around 36 floors). Floors below about 36 on this side may face a new building.

    • Plot 3450416, 94 m away, being built · site plan: G+M+4P+30 · One Residence
    • Plot 3450408, 193 m away, being built · site plan: G+M+4P+24
    • Plot 3450404, 289 m away, no building on record · site plan: G+4P+25
  • South-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 77 m (around 22 floors). Floors below about 22 on this side may face a new building.

    • Plot 3460286, 315 m away, no building on record · site plan: SEE NOTES
    • Plot 3466828, 342 m away, being built · site plan: G+21 · Enara By Omniyat
    • Plot 3460752, 472 m away, no building on record · site plan: G+19
  • South-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 6. One of them has no height limit in its site plan.

    • Plot 3450418, 62 m away, no building on record · site plan: G+4P+23
    • Plot 3460742, 236 m away, being built · site plan: G+3P+25 · Velor
    • Plot 3450390, 254 m away, being built · site plan: G+4P+UNLIMITED · Opulent Residences
  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. One of them has no height limit in its site plan.

    • Plot 3450394, 135 m away, being built · site plan: G+4P+UNLIMITED
    • Plot 3450413, 148 m away, being built · site plan: G+M+3P+11 · Azha Downtown Residences
    • Plot 3450410, 176 m away, being built · site plan: G+3P+18

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How often homes here change hands

16 ready homes sold in the last 12 months, of 189 registered units: about 1 in 12. Across Downtown Dubai, apartments: about 1 in 13.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Renewing tenants against new tenants

Tenants who renewed in UPPER CREST pay on average 1.3% more than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
StudioAED 63,00419 leasesAED 65,60114 leases+4.1%
1-bedroomAED 92,61552 leasesAED 93,61737 leases+1.1%
2-bedroomAED 131,40319 leasesAED 130,84819 leases-0.4%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Cooling (chiller)

The owners' association budget for 2026 has no line for the homes' air-conditioning: cooling is billed separately (by a district-cooling company, or the home's own air-conditioning on the DEWA bill).

Full year 2026 · Owners' association budget registered with RERA (residential part, per sqft of the unit a year).

Getting around and build time

Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 1.8 km in a straight line.

Bus stops within 800 m

  • Empire Heights Towers 1 · F14, X22, 10, 102190 m
  • Empire Heights Towers 2 · 10, 103, 105, 106220 m
  • Dubai Fountain Street 2 · 10, 102, 103, 104270 m
  • Dubai Fountain St.1 · 50, X22380 m
  • Dubai Fountain Street 1 · 10, 105, 106, 11A390 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

UPPER CREST: questions and answers

What is the price per sqft at UPPER CREST?

Homes at UPPER CREST sold for an average of AED 1,673/sqft (AED 18,008/m²) over the last 12 months, with the middle half of sales between AED 1,531/sqft (AED 16,480/m²) and AED 1,729/sqft (AED 18,611/m²), from 16 registered sales.

How much is rent at UPPER CREST?

Average yearly rents at UPPER CREST over the 12 months to 11 Nov 2026: AED 63,890 for a studio, AED 93,032 for a 1-bedroom, AED 131,125 for a 2-bedroom and AED 170,615 for a 3-bedroom, from 172 registered rent contracts (Ejari).

How many homes are sold at UPPER CREST?

UPPER CREST had 16 registered sales in the last 12 months, all ready homes.

Is UPPER CREST more expensive than the rest of Downtown Dubai?

The average price at UPPER CREST is AED 1,673/sqft (AED 18,008/m²), 36% below the Downtown Dubai average for ready homes over the same 12 months, which is AED 2,614/sqft (AED 28,137/m²).

Where is UPPER CREST and who built it?

UPPER CREST is in Downtown Dubai, Dubai, and is a Damac Properties development.

Explore more

Other buildings in Downtown Dubai

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months