THE MATRIX

Data through November 2026 · DLD
WhatsAppEmail

By The First Group, Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf) — 28 registered sales in the last 12 months, at an average of AED 999/sqft (AED 10,753/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

28
Registered sales
AED 999 /sqft
AED 10,753 /m²
Average price per sqft · m²
AED 848–1,072/sqft, or AED 9,128–11,539/m²
Typical range (p25–p75)
0%
Off-plan share of sales

THE MATRIX: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
Studio———AED 49,038132—
1-bedroom———AED 66,28895—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (4.6 hours a day after 1 pm): North-west. The least (0.0 hours): North-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east5.9 h0.0 h3.8 h5.8 / 6.0
South-east7.4 h0.5 h9.6 h7.4 / 7.4
South-west0.9 h0.1 h1.6 h0.5 / 5.3
North-west4.7 h4.6 h0.2 h3.8 / 5.1

Neighbours shade the lower floors: in summer 0.5 hours a day on a low floor against 5.3 near the top, on the side facing South-west.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 137 m (around 39 floors).

    • Plot 6820121, 104 m away, no building on record · site plan: G+5P+21
    • Plot 6820112, 362 m away, no building on record · site plan: G+5P+33
    • Plot 6820283, 459 m away, no building on record · site plan: G+5P+15
  • South-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 88 m (around 25 floors). Floors below about 25 on this side may face a new building.

    • Plot 6820126, 216 m away, being built · site plan: G+5P+19 · Golf Residences By Prestige One
    • Plot 6821468, 298 m away, no building on record · site plan: G+5P+19
  • South-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 123 m (around 35 floors).

    • Plot 6820123, 69 m away, being built · site plan: G+5P+29 · Eden Garden
    • Plot 6820144, 198 m away, no building on record · site plan: G+5P+24
  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 112 m (around 32 floors).

    • Plot 6820124, 82 m away, no building on record · site plan: G+4P+27
    • Plot 6820142, 190 m away, being built · site plan: G+5P+19 · Mag 777
    • Plot 6820130, 318 m away, no building on record · site plan: G+5P+19

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How often homes here change hands

28 ready homes sold in the last 12 months, of 381 registered units: about 1 in 14. Across Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf), apartments: about 1 in 13.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Renewing tenants against new tenants

Tenants who renewed in THE MATRIX pay on average 5.7% less than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
StudioAED 50,30353 leasesAED 48,18979 leases-4.2%
1-bedroomAED 68,99145 leasesAED 63,85550 leases-7.4%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Cooling (chiller)

The owners' association budget for 2026 has no line for the homes' air-conditioning: cooling is billed separately (by a district-cooling company, or the home's own air-conditioning on the DEWA bill).

Full year 2026 · Owners' association budget registered with RERA (residential part, per sqft of the unit a year).

Getting around and build time

Nearest metro: Jumeirah Golf Estates Metro Station (Red Metro line), 6.2 km in a straight line.

Bus stops within 800 m

  • Sports City, Victory Heights East Gate 2 · F34, J02, 10, 103120 m
  • Sports City, Victory Heights East Gate 1 · 10, 103, 104, 105120 m
  • Sport City, Arena Tower · 10, 104, 105, 10X130 m
  • Sport City, European Building · 10, 104, 105, 10X230 m
  • Sports City, ICC Headquarter 1 · 10, 103, 104, 105280 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

THE MATRIX: questions and answers

What is the price per sqft at THE MATRIX?

Homes at THE MATRIX sold for an average of AED 999/sqft (AED 10,753/m²) over the last 12 months, with the middle half of sales between AED 848/sqft (AED 9,128/m²) and AED 1,072/sqft (AED 11,539/m²), from 28 registered sales.

How much is rent at THE MATRIX?

Average yearly rents at THE MATRIX over the 12 months to 11 Nov 2026: AED 49,038 for a studio and AED 66,288 for a 1-bedroom, from 227 registered rent contracts (Ejari).

How many homes are sold at THE MATRIX?

THE MATRIX had 28 registered sales in the last 12 months, all ready homes.

Where is THE MATRIX and who built it?

THE MATRIX is in Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf), Dubai, and is a The First Group development.

Explore more

Other buildings in Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf)

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months