Hera Tower

Data through November 2026 · DLD
WhatsAppEmail

By Titans, Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf) — 98 registered sales in the last 12 months, at an average of AED 987/sqft (AED 10,624/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

98
Registered sales
AED 987 /sqft
AED 10,624 /m²
Average price per sqft · m²
AED 845–1,078/sqft, or AED 9,095–11,603/m²
Typical range (p25–p75)
0%
Off-plan share of sales

Hera Tower: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
Studio———AED 50,783152—
1-bedroom———AED 75,70994—
2-bedroom———AED 105,12456—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): South-east.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North-east5.2 h0.0 h0.2 h5.1 / 5.2
South-east4.2 h0.0 h6.5 h2.8 / 6.7
South-west7.4 h5.7 h7.9 h7.2 / 7.4
North-west0.9 h0.6 h1.0 h0.5 / 6.0

Neighbours shade the lower floors: in summer 0.5 hours a day on a low floor against 6.0 near the top, on the side facing North-west.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 137 m (around 39 floors).

    • Plot 6820112, 170 m away, no building on record · site plan: G+5P+33
    • Plot 6820114, 326 m away, no building on record · site plan: G+5P+31
    • Plot 6822706, 400 m away, no building on record · site plan: SEE NOTES
  • South-east

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 74 m (around 21 floors). Floors below about 21 on this side may face a new building.

    • Plot 6820283, 294 m away, no building on record · site plan: G+5P+15
  • South-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 123 m (around 35 floors).

    • Plot 6820121, 112 m away, no building on record · site plan: G+5P+21
    • Plot 6820123, 283 m away, being built · site plan: G+5P+29 · Eden Garden
    • Plot 6820126, 364 m away, being built · site plan: G+5P+19 · Golf Residences By Prestige One
  • North-west

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 112 m (around 32 floors).

    • Plot 6820129, 132 m away, no building on record · site plan: G+5P+19
    • Plot 6820130, 196 m away, no building on record · site plan: G+5P+19
    • Plot 6820142, 341 m away, being built · site plan: G+5P+19 · Mag 777

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How often homes here change hands

74 ready homes sold in the last 12 months, of 529 registered units: about 1 in 7. Across Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf), apartments: about 1 in 13.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Renewing tenants against new tenants

Tenants who renewed in Hera Tower pay on average 16.1% less than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
StudioAED 54,16590 leasesAED 46,47963 leases-14.2%
1-bedroomAED 80,41963 leasesAED 66,44432 leases-17.4%
2-bedroomAED 112,50038 leasesAED 89,55218 leases-20.4%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Cooling (chiller)

The owners' association budget for 2026 pays the homes' air-conditioning: AED 1.39/sqft (AED 15/m²) a year, within a total service charge of AED 17.68/sqft (AED 190/m²). So cooling comes with the service charge here, not as a separate bill.

Full year 2026 · Owners' association budget registered with RERA (residential part, per sqft of the unit a year).

District cooling for this building: Emicool.

Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.

Getting around and build time

Nearest metro: Jumeirah Golf Estates Metro Station (Red Metro line), 6.5 km in a straight line.

Bus stops within 800 m

  • Sports City, ICC Headquarter 1 · 10, 103, 104, 105110 m
  • Sports City, ICC Headquarter 2 · 10, 103, 104, 105210 m
  • Sports City, Victory Heights East Gate 1 · 10, 103, 104, 105280 m
  • Sports City, Victory Heights East Gate 2 · F34, J02, 10, 103310 m
  • Sport City, Arena Tower · 10, 104, 105, 10X330 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

Hera Tower: questions and answers

What is the price per sqft at Hera Tower?

Homes at Hera Tower sold for an average of AED 987/sqft (AED 10,624/m²) over the last 12 months, with the middle half of sales between AED 845/sqft (AED 9,095/m²) and AED 1,078/sqft (AED 11,603/m²), from 98 registered sales.

How much is rent at Hera Tower?

Average yearly rents at Hera Tower over the 12 months to 11 Nov 2026: AED 50,783 for a studio, AED 75,709 for a 1-bedroom and AED 105,124 for a 2-bedroom, from 302 registered rent contracts (Ejari).

How many homes are sold at Hera Tower?

Hera Tower had 98 registered sales in the last 12 months, all ready homes.

Where is Hera Tower and who built it?

Hera Tower is in Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf), Dubai, and is a Titans development.

Explore more

Other buildings in Al Hebiah Fourth (Dubai Sports City, Tilal Al Ghaf)

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months