Skyvue

Data through November 2026 · DLD
WhatsAppEmail

By Sobha, The Lagoons — 563 registered sales in the last 12 months, at an average of AED 2,919/sqft (AED 31,420/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

563
Registered sales
AED 2,919 /sqft
AED 31,420 /m²
Average price per sqft · m²
AED 2,900–3,035/sqft, or AED 31,215–32,668/m²
Typical range (p25–p75)
100%
Off-plan share of sales

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 20. The tallest may rise to about 140 m (around 40 floors). Floors below about 40 on this side may face a new building.

    • Plot 6110877, 166 m away, being built · site plan: G+3
    • Plot 6117232, 293 m away, no building on record · site plan: G+3P+17
    • Plot 6117251, 301 m away, being built · site plan: G+3P+21
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 9. The tallest may rise to about 95 m (around 27 floors). Floors below about 27 on this side may face a new building.

    • Plot 6110878, 166 m away, being built · site plan: G+M+5P+20+R
    • Plot 6110836, 336 m away, being built
    • Plot 6110775, 344 m away, being built
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 7. The tallest may rise to about 270 m (around 77 floors). Floors below about 77 on this side may face a new building.

    • Plot 6110915, 56 m away, being built · site plan: G+3P+R
    • Plot 6110676, 169 m away, being built · site plan: G+M+5P+70+R · 360 Riverside Crescent
    • Plot 6110677, 245 m away, being built · site plan: G+M+5P+60+R · 350 Riverside Crescent
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 8. The tallest may rise to about 88 m (around 25 floors). Floors below about 25 on this side may face a new building.

    • Plot 6110682, 152 m away, being built
    • Plot 6117230, 313 m away, no building on record · site plan: G+3P+17
    • Plot 6117229, 346 m away, no building on record · site plan: G+3P+17

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Getting around and build time

Nearest metro: Creek Metro Station (Green Metro line), 5.0 km in a straight line.

Bus stops within 800 m

  • Dubai Polo Club · 50, 55, 61, 63E370 m
  • Nad Al Shiba, Emirates NBD · 10, 102, 103, 105550 m
  • Ras Al Khor, Mubarak Trans. 2 · 10, 103, 110, 11A670 m
  • Aden Street 2 2 · 63E, 64, 10, 103790 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

Skyvue: questions and answers

What is the price per sqft at Skyvue?

Homes at Skyvue sold for an average of AED 2,919/sqft (AED 31,420/m²) over the last 12 months, with the middle half of sales between AED 2,900/sqft (AED 31,215/m²) and AED 3,035/sqft (AED 32,668/m²), from 563 registered sales.

How many homes are sold at Skyvue?

Skyvue had 563 registered sales in the last 12 months, all off-plan.

Where is Skyvue and who built it?

Skyvue is in The Lagoons, Dubai, and is a Sobha development.

Explore more

Other buildings in The Lagoons

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months