MONTROSE

Data through November 2026 · DLD
WhatsAppEmail

By Deyaar, Dubai Science Park — 19 registered sales in the last 12 months, at an average of AED 1,187/sqft (AED 12,777/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

19
Registered sales
AED 1,187 /sqft
AED 12,777 /m²
Average price per sqft · m²
AED 1,146–1,209/sqft, or AED 12,335–13,014/m²
Typical range (p25–p75)
0%
Off-plan share of sales

MONTROSE: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
1-bedroom———AED 67,121104—
2-bedroom———AED 95,38073—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (2.8 hours a day after 1 pm): North. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
East1.5 h0.0 h2.4 h1.0 / 4.4
South6.0 h2.2 h10.5 h6.0 / 6.0
West1.7 h1.0 h2.8 h1.2 / 4.7
North4.6 h2.8 h0.0 h3.5 / 4.9

Neighbours shade the lower floors: in summer 1.2 hours a day on a low floor against 4.7 near the top, on the side facing West.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 158 m (around 45 floors).

    • Plot 6727770, 225 m away, being built · site plan: G+19 · Vincitore Aqua Dimore
    • Plot 6723163, 375 m away, being built · site plan: G+3P+41 · Binghatti Hills
    • Plot 6731897, 452 m away, no building on record · site plan: G+8
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 60 m (around 17 floors). Floors below about 17 on this side may face a new building.

    • Plot 6730126, 209 m away, being built · site plan: G+5P+11 · Butterfly
    • Plot 6731113, 398 m away, no building on record · site plan: G+8
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 14 m (around 4 floors). Floors below about 4 on this side may face a new building.

    • Plot 6727773, 375 m away, no building on record · site plan: G+3
  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 88 m (around 25 floors).

    • Plot 6727700, 165 m away, no building on record · site plan: G+24
    • Plot 6727720, 214 m away, being built · site plan: G+24 · Binghatti Hillside
    • Plot 6727696, 289 m away, being built · site plan: G+24 · Nova Tower

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How often homes here change hands

19 ready homes sold in the last 12 months, of 297 registered units: about 1 in 16. Across Dubai Science Park, apartments: about 1 in 13.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Renewing tenants against new tenants

Tenants who renewed in MONTROSE pay on average 1.5% less than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
1-bedroomAED 67,90749 leasesAED 66,42055 leases-2.2%
2-bedroomAED 95,63535 leasesAED 95,14538 leases-0.5%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Cooling (chiller)

District cooling for this building: Empower.

Empower publishes its charges: AED 0.568 per ton-hour of cooling used and AED 750 per ton a year of contracted capacity (the developer sets each home's tons), plus a meter fee and 5% VAT.

Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.

Getting around and build time

Nearest metro: Mall of the Emirates Metro Station (Red Metro line), 7.3 km in a straight line.

Bus stops within 800 m

  • Dubai Science Park, City Center 1 · 10, 102, 103, 104450 m
  • Arjan, Sheraton Building 1 · F36, 10, 102, 103490 m
  • Arjan, Domus Hotels Staff Buildings 2 · 10, 102, 103, 104510 m
  • Dubai Science Park Complex 1 · F36, 10, 102, 103670 m
  • Arjan, Damac Northside Buildings 2 · 10, 102, 103, 104720 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

MONTROSE: questions and answers

What is the price per sqft at MONTROSE?

Homes at MONTROSE sold for an average of AED 1,187/sqft (AED 12,777/m²) over the last 12 months, with the middle half of sales between AED 1,146/sqft (AED 12,335/m²) and AED 1,209/sqft (AED 13,014/m²), from 19 registered sales.

How much is rent at MONTROSE?

Average yearly rents at MONTROSE over the 12 months to 11 Nov 2026: AED 67,121 for a 1-bedroom and AED 95,380 for a 2-bedroom, from 177 registered rent contracts (Ejari).

How many homes are sold at MONTROSE?

MONTROSE had 19 registered sales in the last 12 months, all ready homes.

Is MONTROSE more expensive than the rest of Dubai Science Park?

The average price at MONTROSE is AED 1,187/sqft (AED 12,777/m²), 14% below the Dubai Science Park average for ready homes over the same 12 months, which is AED 1,375/sqft (AED 14,800/m²).

Where is MONTROSE and who built it?

MONTROSE is in Dubai Science Park, Dubai, and is a Deyaar development.

Explore more

Other buildings in Dubai Science Park

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months