LUNAYA

Data through November 2026 · DLD
WhatsAppEmail

By Zaya, Jebel Ali Hills — 442 registered sales in the last 12 months, at an average of AED 2,616/sqft (AED 28,158/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

For villas and townhouses DLD records the price per sqft on the plot area, so compare communities by average price.

442
Registered sales
AED 2,616 /sqft
AED 28,158 /m²
Average price per sqft · m²
AED 2,232–3,006/sqft, or AED 24,025–32,356/m²
Typical range (p25–p75)
100%
Off-plan share of sales

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 6. The tallest may rise to about 14 m (around 4 floors). Floors below about 4 on this side may face a new building.

    • Plot 5132279, 98 m away, no building on record · site plan: G+3
    • Plot 5132459, 127 m away, no building on record · site plan: G+3
    • Plot 5132286, 176 m away, no building on record · site plan: G+3
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 6. The tallest may rise to about 14 m (around 4 floors). Floors below about 4 on this side may face a new building.

    • Plot 5132425, 159 m away, no building on record · site plan: G+3
    • Plot 5132303, 200 m away, no building on record · site plan: G+3
    • Plot 5132426, 202 m away, no building on record · site plan: G+3
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 14 m (around 4 floors). Floors below about 4 on this side may face a new building.

    • Plot 5132309, 211 m away, no building on record · site plan: G+3
    • Plot 5132432, 244 m away, no building on record · site plan: G+3
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 10. The tallest may rise to about 14 m (around 4 floors). Floors below about 4 on this side may face a new building.

    • Plot 5132435, 82 m away, no building on record · site plan: G+3
    • Plot 5132313, 89 m away, no building on record · site plan: G+3
    • Plot 5132389, 149 m away, no building on record · site plan: G+3

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Getting around and build time

Nearest metro: UAE Exchange Metro Station (Red Metro line), 10.3 km in a straight line.

Bus stops within 800 m

No RTA bus stop within 800 m in a straight line.

How long buildings like this take in Dubai

  • Investment villas: average 30 months from permit to completion (middle half 27–33; 1,595 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

LUNAYA: questions and answers

What is the price per sqft at LUNAYA?

Homes at LUNAYA sold for an average of AED 2,616/sqft (AED 28,158/m²) over the last 12 months, with the middle half of sales between AED 2,232/sqft (AED 24,025/m²) and AED 3,006/sqft (AED 32,356/m²), from 442 registered sales.

How many homes are sold at LUNAYA?

LUNAYA had 442 registered sales in the last 12 months, all off-plan.

Where is LUNAYA and who built it?

LUNAYA is in Jebel Ali Hills, Dubai, and is a Zaya development.

Explore more