DD STAND POINT

Data through November 2026 · DLD
WhatsAppEmail

By Emaar, Downtown Dubai — 34 registered sales in the last 12 months, at an average of AED 2,135/sqft (AED 22,981/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

34
Registered sales
AED 2,135 /sqft
AED 22,981 /m²
Average price per sqft · m²
AED 2,010–2,496/sqft, or AED 21,635–26,867/m²
Typical range (p25–p75)
0%
Off-plan share of sales

DD STAND POINT: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
Studio———AED 75,30333—
1-bedroom———AED 104,985184—
2-bedroom———AED 152,94164—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (3.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North2.3 h0.0 h0.0 h2.1 / 2.5
East1.6 h0.0 h2.0 h1.4 / 1.8
South5.8 h3.6 h5.8 h5.6 / 6.1
West4.2 h3.7 h1.8 h3.9 / 4.6

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

How often homes here change hands

34 ready homes sold in the last 12 months, of 536 registered units: about 1 in 16. Across Downtown Dubai, apartments: about 1 in 13.

Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.

From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.

Renewing tenants against new tenants

Tenants who renewed in DD STAND POINT pay on average 5.8% more than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
StudioAED 70,76521 leasesAED 78,46912 leases+10.9%
1-bedroomAED 103,854108 leasesAED 105,39976 leases+1.5%
2-bedroomAED 144,37544 leasesAED 171,10521 leases+18.5%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Cooling (chiller)

District cooling for this building: Downtown DCP.

Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.

Getting around and build time

Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 550 m in a straight line.

Bus stops within 800 m

  • Dubai Mall MS Land Side D · 30, D03, D03A, F13480 m
  • Dubai Mall Metro Bus Stop Landside 1 · 10, 102, 105, 106500 m
  • Dubai Mall Metro Bus Stop Landside 3 · 10, 11B, 12, 13560 m
  • Dubai Mall Metro Bus Stop Landside 2 · 10, 105, 106, 11A560 m
  • Dubai Mall Metro Bus Station Seaside · EV1, EV3, EV7, EV8660 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

DD STAND POINT: questions and answers

What is the price per sqft at DD STAND POINT?

Homes at DD STAND POINT sold for an average of AED 2,135/sqft (AED 22,981/m²) over the last 12 months, with the middle half of sales between AED 2,010/sqft (AED 21,635/m²) and AED 2,496/sqft (AED 26,867/m²), from 34 registered sales.

How much is rent at DD STAND POINT?

Average yearly rents at DD STAND POINT over the 12 months to 11 Nov 2026: AED 75,303 for a studio, AED 104,985 for a 1-bedroom and AED 152,941 for a 2-bedroom, from 281 registered rent contracts (Ejari).

How many homes are sold at DD STAND POINT?

DD STAND POINT had 34 registered sales in the last 12 months, all ready homes.

Is DD STAND POINT more expensive than the rest of Downtown Dubai?

The average price at DD STAND POINT is AED 2,135/sqft (AED 22,981/m²), 18% below the Downtown Dubai average for ready homes over the same 12 months, which is AED 2,614/sqft (AED 28,137/m²).

Where is DD STAND POINT and who built it?

DD STAND POINT is in Downtown Dubai, Dubai, and is a Emaar development.

Explore more

Other buildings in Downtown Dubai

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months