CHIC TOWER

Data through November 2026 · DLD
WhatsAppEmail

By Damac Properties, Business Bay — 26 registered sales in the last 12 months, at an average of AED 2,589/sqft (AED 27,868/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

26
Registered sales
AED 2,589 /sqft
AED 27,868 /m²
Average price per sqft · m²
AED 2,054–2,650/sqft, or AED 22,109–28,524/m²
Typical range (p25–p75)
100%
Off-plan share of sales

CHIC TOWER: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
StudioAED 1.27M2,63228,33117———
1-bedroomAED 2.33M2,58827,8578———

Off-plan sales, last 12 months (5+ sales per type). Yield = average rent ÷ average price.

Price per sqft/m² trend

AED/sqft1,8383,0584,2782024-Q12024-Q32025-Q12025-Q32026-Q12026-Q32026-Q4

From 1 Jan 2024 to 11 Nov 2026 · off-plan sales only · apartments only · quarterly average of this project's sales; the latest quarter is still in progress

Sales by quarter

From 1 Jan 2024 to 11 Nov 2026 · off-plan sales only · apartments only · quarterly average of this project's sales; the latest quarter is still in progress

QuarterSalesAED/sqftAED/m²
2026-Q4 so far (to 11 Nov)43,88941,861
2026-Q342,25224,240
2026-Q232,68428,890
2026-Q1112,41425,984
2025-Q452,18123,476
2025-Q3132,07922,378
2025-Q262,04522,012
2025-Q1172,73029,385
2024-Q452,23724,079
2024-Q312,44526,318
2024-Q2202,04221,980
2024-Q142,37025,510

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (3.0 hours a day after 1 pm): West. The least (0.0 hours): North.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North1.9 h0.0 h0.0 h1.3 / 2.6
East5.2 h0.0 h5.1 h4.1 / 5.9
South5.1 h1.4 h10.5 h4.6 / 5.8
West3.4 h3.0 h2.0 h0.2 / 4.0

Neighbours shade the lower floors: in summer 0.2 hours a day on a low floor against 4.0 near the top, on the side facing West.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 105 m (around 30 floors). Floors below about 30 on this side may face a new building.

    • Plot 3460478, 141 m away, being built · site plan: G+29 · 77s
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 231 m (around 66 floors).

    • Plot 3460508, 149 m away, being built · site plan: G+59 · Wedyan
    • Plot 3466812, 177 m away, no building on record · site plan: G+29
    • Plot 3460507, 229 m away, being built · site plan: G+65 · One By Binghatti
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 210 m (around 60 floors).

    • Plot 3460492, 204 m away, being built · site plan: G+5P+54 · One River Point
  • West

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Getting around and build time

Nearest metro: Business Bay Metro Station (Red Metro line), 870 m in a straight line.

Bus stops within 800 m

  • Business Bay Marine Transport Station · 10, 310, 367, 53130 m
  • Lillian Tower 2 · 10, 102, 103, 104240 m
  • Lillian Tower 1 · 50, F14, F19A, X22380 m
  • Godolphin Marine Transport Station · 10, 310, 367, 53550 m
  • XL Tower 2 · 10, 102, 103, 104630 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

CHIC TOWER: questions and answers

What is the price per sqft at CHIC TOWER?

Homes at CHIC TOWER sold for an average of AED 2,589/sqft (AED 27,868/m²) over the last 12 months, with the middle half of sales between AED 2,054/sqft (AED 22,109/m²) and AED 2,650/sqft (AED 28,524/m²), from 26 registered sales.

How much does a home cost at CHIC TOWER?

Average off-plan sale prices at CHIC TOWER over the last 12 months: AED 1.27M for a studio (17 sales) and AED 2.33M for a 1-bedroom (8 sales), from official Dubai Land Department sale registrations.

Are prices at CHIC TOWER going up or down?

The average price at CHIC TOWER was AED 2,414/sqft (AED 25,984/m²) in Q1 2026, 11.6% lower than in Q1 2025, when it was AED 2,730/sqft (AED 29,385/m²), on registered sales.

How many homes are sold at CHIC TOWER?

CHIC TOWER had 26 registered sales in the last 12 months, all off-plan.

Where is CHIC TOWER and who built it?

CHIC TOWER is in Business Bay, Dubai, and is a Damac Properties development.

Explore more

Other buildings in Business Bay

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months