BADRA PHASE 1

Data through November 2026 · DLD
WhatsAppEmail

By Dubai Waterfront, Badra — 20 registered sales in the last 12 months, at an average of AED 748/sqft (AED 8,051/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.

20
Registered sales
AED 748 /sqft
AED 8,051 /m²
Average price per sqft · m²
AED 710–819/sqft, or AED 7,642–8,816/m²
Typical range (p25–p75)
0%
Off-plan share of sales

BADRA PHASE 1: price and rent by number of bedrooms

HomeAverage sale priceAED/sqftAED/m²SalesAverage rent a yearRent contractsGross yield
Studio———AED 33,79478—
1-bedroom———AED 42,439149—
2-bedroom———AED 57,62180—
3-bedroom———AED 73,87238—

Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.

Renewing tenants against new tenants

Tenants who renewed in BADRA PHASE 1 pay on average 15.1% less than new tenants of the same bedroom count.

BedroomsNew leases (avg/yr)Renewals (avg/yr)Renewal vs new
StudioAED 37,39514 leasesAED 33,00664 leases-11.7%
1-bedroomAED 47,65143 leasesAED 40,324106 leases-15.4%
2-bedroomAED 66,84119 leasesAED 53,99761 leases-19.2%
3-bedroomAED 79,8899 leasesAED 72,00529 leases-9.9%

A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator

From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.

Getting around and build time

Nearest metro: UAE Exchange Metro Station (Red Metro line), 5.3 km in a straight line.

Bus stops within 800 m

No RTA bus stop within 800 m in a straight line.

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

BADRA PHASE 1: questions and answers

What is the price per sqft at BADRA PHASE 1?

Homes at BADRA PHASE 1 sold for an average of AED 748/sqft (AED 8,051/m²) over the last 12 months, with the middle half of sales between AED 710/sqft (AED 7,642/m²) and AED 819/sqft (AED 8,816/m²), from 20 registered sales.

How much is rent at BADRA PHASE 1?

Average yearly rents at BADRA PHASE 1 over the 12 months to 11 Nov 2026: AED 33,794 for a studio, AED 42,439 for a 1-bedroom, AED 57,621 for a 2-bedroom and AED 73,872 for a 3-bedroom, from 345 registered rent contracts (Ejari).

How many homes are sold at BADRA PHASE 1?

BADRA PHASE 1 had 20 registered sales in the last 12 months, all ready homes.

Where is BADRA PHASE 1 and who built it?

BADRA PHASE 1 is in Badra, Dubai, and is a Dubai Waterfront development.

Explore more