BADRA PHASE 1
Data through November 2026 · DLDBy Dubai Waterfront, Badra — 20 registered sales in the last 12 months, at an average of AED 748/sqft (AED 8,051/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.
BADRA PHASE 1: price and rent by number of bedrooms
| Home | Average sale price | AED/sqftAED/m² | Sales | Average rent a year | Rent contracts | Gross yield |
|---|---|---|---|---|---|---|
| Studio | — | — | — | AED 33,794 | 78 | — |
| 1-bedroom | — | — | — | AED 42,439 | 149 | — |
| 2-bedroom | — | — | — | AED 57,621 | 80 | — |
| 3-bedroom | — | — | — | AED 73,872 | 38 | — |
Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.
Renewing tenants against new tenants
Tenants who renewed in BADRA PHASE 1 pay on average 15.1% less than new tenants of the same bedroom count.
| Bedrooms | New leases (avg/yr) | Renewals (avg/yr) | Renewal vs new |
|---|---|---|---|
| Studio | AED 37,39514 leases | AED 33,00664 leases | -11.7% |
| 1-bedroom | AED 47,65143 leases | AED 40,324106 leases | -15.4% |
| 2-bedroom | AED 66,84119 leases | AED 53,99761 leases | -19.2% |
| 3-bedroom | AED 79,8899 leases | AED 72,00529 leases | -9.9% |
A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator
From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.
Getting around and build time
Nearest metro: UAE Exchange Metro Station (Red Metro line), 5.3 km in a straight line.
Bus stops within 800 m
No RTA bus stop within 800 m in a straight line.
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
BADRA PHASE 1: questions and answers
What is the price per sqft at BADRA PHASE 1?
Homes at BADRA PHASE 1 sold for an average of AED 748/sqft (AED 8,051/m²) over the last 12 months, with the middle half of sales between AED 710/sqft (AED 7,642/m²) and AED 819/sqft (AED 8,816/m²), from 20 registered sales.
How much is rent at BADRA PHASE 1?
Average yearly rents at BADRA PHASE 1 over the 12 months to 11 Nov 2026: AED 33,794 for a studio, AED 42,439 for a 1-bedroom, AED 57,621 for a 2-bedroom and AED 73,872 for a 3-bedroom, from 345 registered rent contracts (Ejari).
How many homes are sold at BADRA PHASE 1?
BADRA PHASE 1 had 20 registered sales in the last 12 months, all ready homes.
Where is BADRA PHASE 1 and who built it?
BADRA PHASE 1 is in Badra, Dubai, and is a Dubai Waterfront development.