Price from
AED 280,000
Time 1 is a project by Time Properties in Dubailand Residence Complex, Dubai. Prices start from AED 280,000. The Dubai Land Department project register lists completion for December 2022. It was 100% built at the official RERA site inspection of 27 December 2023.
About the project
Sold-out residential tower (3 basements, ground + 13 floors) in Dubailand with open-layout apartments and balconies.
Construction progress
Finished100% complete at the latest RERA site inspection on 27 Dec 2023; completed 31 Dec 2022.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 27 Dec 2023 | 100% | 15 |
| 28 Aug 2023 | 91.32% | 10 |
| 25 Apr 2023 | 68.06% | 9 |
| 7 Dec 2022 | 57.08% | 10 |
| 4 Aug 2022 | 47.04% | 9 |
| 27 Jan 2022 | 33.04% | 10 |
| 23 Aug 2021 | 24.13% | 5 |
| 4 May 2021 | 17.72% | 7 |
Official RERA site-inspection records for registered project #1973, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 5.9 h | 0.0 h | 3.2 h | 5.9 / 5.9 |
| South-east | 7.1 h | 0.3 h | 8.5 h | 7.1 / 7.1 |
| South-west | 6.8 h | 5.7 h | 7.0 h | 6.8 / 6.8 |
| North-west | 5.5 h | 5.3 h | 1.5 h | 5.5 / 5.5 |
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 21. The tallest may rise to about 74 m (around 21 floors).
- Plot 64810507, 127 m away, no building on record · site plan: G+11
- Plot 6488558, 185 m away, no building on record · site plan: G+11
- Plot 64810508, 191 m away, no building on record · site plan: G+11
- South-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 10. The tallest may rise to about 154 m (around 44 floors).
- Plot 6488570, 50 m away, being built · site plan: G+3P+13 · Havencia
- Plot 6488573, 101 m away, being built · site plan: G+13 · Ag Aum Residence
- Plot 6488571, 151 m away, being built · site plan: G+3P+13 · Cove Edition Residence 2 By Imtiaz
- South-west
No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 13. The tallest may rise to about 84 m (around 24 floors).
- Plot 6488568, 50 m away, being built · site plan: G+13 · Cybele By Wadan
- Plot 6488567, 100 m away, no building on record · site plan: G+17
- Plot 6488566, 153 m away, being built · site plan: G+3P+20 · Samana Parkville
Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Cooling (chiller)
District cooling for this building: Empower.
Empower publishes its charges: AED 0.568 per ton-hour of cooling used and AED 750 per ton a year of contracted capacity (the developer sets each home's tons), plus a meter fee and 5% VAT.
Snapshot of 22 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.
Amenities
How it compares in Dubailand Residence Complex
16 other off-plan projects in Dubailand Residence Complex · average entry price AED 659,000 · this project is 58% below that average
Time 1: questions and answers
What is the starting price of Time 1?
Prices at Time 1 start from AED 280,000, as published by Time Properties.
When is the handover of Time 1?
The Dubai Land Department project register lists the completion date of Time 1 as December 2022.
How much of Time 1 is built?
Time 1 was 100% complete at the official RERA site inspection of 27 December 2023.
Is Time 1 registered with the Dubai Land Department?
Yes. Time 1 is registered with the Dubai Land Department as project number 1973, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Time 1?
Time 1 is developed by Time Properties. The Dubai Land Department project register lists 11 projects for Time Properties: 6 delivered and 2 under construction.
Where is Time 1 located?
Time 1 is in Dubailand Residence Complex, Dubai.
What unit types does Time 1 offer?
The project has 286 units in the Dubai Land Department project register.
How does Time 1 compare with other off-plan projects in Dubailand Residence Complex?
The starting price of Time 1 (AED 280,000) is 58% below the average starting price of 12 other off-plan projects in Dubailand Residence Complex, which is AED 659,000.
What is the average price per sqft in Dubai Land Residence Complex?
Apartments in Dubai Land Residence Complex sell for about AED 854/sqft (AED 9,188/m²), based on 589 registered sales in the last 12 months.
What rental yield can I expect in Dubai Land Residence Complex?
Apartments in Dubai Land Residence Complex yield about 7.8% gross, or about 6.4% net after service charges, based on 7,773 registered rent contracts and 589 sales in the last 12 months.
What are the service charges in Dubai Land Residence Complex?
Service charges for apartments in Dubai Land Residence Complex are about AED 12.60/sqft (AED 136/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.
What amenities does Time 1 have?
Time 1 lists these amenities: High-speed elevators, Covered parking, Swimming pool, Gym, Communal terrace and 24/7 security.
Explore more
More off-plan projects by Time Properties
✦ Want the full picture on Time 1?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 14 Jun 2026.





