Mr. C Residences Jumeirah is a project by Alta Real-Estate Developments in Jumeirah, Dubai. Alta Real-Estate Developments states handover in Launched 2023-10-01. It was 100% built at the official RERA site inspection of 13 November 2023.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: independent listing.
About the project
Branded residences developed in collaboration with Ignazio and Maggio Cipriani. 27 units. Building concept inspired by desert dunes and ocean waves; yacht-luxury interiors. Architecture by Bernardo Fort-Brescia (Arquitectonica), interiors by Will Meyer (Meyer Davis). Microsite: mrcresidencesjumeirah.com.
Construction progress
Finished100% complete at the latest RERA site inspection on 13 Nov 2023; completed 21 Jan 2024.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 13 Nov 2023 | 100% | 18 |
| 4 Sept 2023 | 81.37% | 11 |
| 12 Jun 2023 | 60.14% | 9 |
| 20 Mar 2023 | 40.49% | 9 |
| 17 Jan 2023 | 30.16% | 8 |
| 11 Aug 2022 | 13.46% | 3 |
| 19 May 2022 | 4.02% | 5 |
Official RERA site-inspection records for registered project #2288, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 5.3 h | 0.0 h | 1.3 h | 5.3 / 5.3 |
| South-east | 6.8 h | 0.0 h | 6.9 h | 6.8 / 6.8 |
| South-west | 7.2 h | 5.7 h | 8.8 h | 7.2 / 7.2 |
| North-west | 5.9 h | 5.6 h | 3.4 h | 5.5 / 5.9 |
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
Amenities
Mr. C Residences Jumeirah: questions and answers
When is the handover of Mr. C Residences Jumeirah?
Alta Real-Estate Developments states handover of Mr. C Residences Jumeirah in Launched 2023-10-01. The Dubai Land Department project register lists the completion date of the project as January 2024.
How much of Mr. C Residences Jumeirah is built?
Mr. C Residences Jumeirah was 100% complete at the official RERA site inspection of 13 November 2023.
Is Mr. C Residences Jumeirah registered with the Dubai Land Department?
Yes. Mr. C Residences Jumeirah is registered with the Dubai Land Department as project number 2288, and its escrow account is held at Emirates Nbd Bank (P.J.S.C). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Mr. C Residences Jumeirah?
Mr. C Residences Jumeirah is developed by Alta Real-Estate Developments. The Dubai Land Department project register lists 3 projects for Alta Real-Estate Developments: 1 delivered and 2 under construction.
Where is Mr. C Residences Jumeirah located?
Mr. C Residences Jumeirah is in Jumeirah, Dubai.
What unit types does Mr. C Residences Jumeirah offer?
The project has 27 units in the Dubai Land Department project register.
What amenities does Mr. C Residences Jumeirah have?
Mr. C Residences Jumeirah lists these amenities: Direct elevator access to each floor, Private plunge pools, Rooftop gardens (penthouses) and Burj Khalifa views.
Explore more
More off-plan projects by Alta Real-Estate Developments
✦ Want the full picture on Mr. C Residences Jumeirah?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 30 Oct 2026.