Price from
AED 8.10M
Mr. C Residences Downtown is a project by Alta Real-Estate Developments in Downtown Dubai, Dubai. Prices start from AED 8.10M. It offers 2 Bedroom, 3 Bedroom and 4 Bedroom. Alta Real-Estate Developments states handover in Launched 2025-01-30. It was 81% built at the official RERA site inspection of 2 November 2026.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: independent listing.
About the project
Italian-flair branded residences fusing Mr. C / Cipriani hospitality heritage with Dubai's cosmopolitan lifestyle. 162 units. Architecture by Arquitectonica, interiors by 1508 London. Microsite: mrcresidencesdowntown.com.
Construction progress
80.5% complete at the latest RERA site inspection on 2 Nov 2026; scheduled completion 27 Jan 2027.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 2 Nov 2026 | 80.5% | 15 |
| 4 Aug 2026 | 73.23% | 10 |
| 29 Apr 2026 | 70% | 9 |
| 20 Jan 2026 | 63% | 13 |
| 17 Dec 2025 | 57% | 9 |
| 9 Sept 2025 | 50.05% | 7 |
| 15 May 2025 | 43.3% | 12 |
| 30 Dec 2024 | 41.34% | 11 |
Escrow account 001640221011401 at Dubai Islamic Bank (Public Joint Stock Company). Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #2476, updated daily. Tap a photo for the full-size original.
Paid against built
On this plan a buyer pays 30% of the price before the keys and 70% on handover.
By the inspection of 2 Nov 2026, the building ran 52 points ahead of the payments on an even schedule.
At the building's speed over the last 12 months it would be finished around 26 Jul 2027, about 6 months after the registered date. (registered completion: 27 Jan 2027)
Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.5 h | 2.8 h | 0.0 h | 1.3 / 5.6 |
| East | 5.9 h | 0.0 h | 4.5 h | 4.1 / 6.2 |
| South | 6.0 h | 2.4 h | 9.8 h | 5.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 1.6 / 6.3 |
Neighbours shade the lower floors: in summer 1.6 hours a day on a low floor against 6.3 near the top, on the side facing West.
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North
No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.
- East
The planning register covers too little of what lies in front of this side to say what may be built there.
- South
The planning register covers too little of what lies in front of this side to say what may be built there.
- West
No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.
Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Who's selling this project
15 agencies are currently listing units in Mr. C Residences Downtown across 39 listings, from AED 8.60M to AED 37.57M depending on unit size and floor.
| Agency | Listings | Asking range | Trust |
|---|---|---|---|
| 15 | AED 8.76M – AED 36.73M | 15 verified | |
| 4 | AED 8.76M – AED 11.17M | 4 verified · Trusted broker | |
| 3 | AED 8.70M – AED 15.61M | 3 verified | |
| 2 | AED 10.60M – AED 11.93M | 2 verified | |
| 2 | AED 11.74M – AED 37.57M | 2 verified · Trusted broker | |
| 2 | AED 8.60M – AED 30.51M | 2 verified · Trusted broker | |
| 2 | AED 9.40M – AED 13.85M | 2 verified · Trusted broker | |
| 2 | AED 8.70M – AED 11.90M | 2 verified · Trusted broker | |
| 1 | AED 8.60M | 1 verified · Trusted broker | |
| 1 | AED 12.00M | 1 verified · Trusted broker | |
| 1 | AED 9.45M | 1 verified · Trusted broker | |
| 1 | AED 30.51M | 1 verified · Trusted broker | |
| 1 | AED 10.75M | 1 verified · Trusted broker | |
| 1 | AED 10.80M | 1 verified · Trusted broker | |
| 1 | AED 10.60M | 1 verified · Trusted broker |
Tap an agency to see its listings and call or WhatsApp the agent (sign in).
Live agency asking prices across unit types and floors — not sold prices.
Mr. C Residences Downtown: questions and answers
What is the starting price of Mr. C Residences Downtown?
Prices at Mr. C Residences Downtown start from AED 8.10M, for homes from 2,000 sqft (186 m²), as listed for sale.
What is the payment plan for Mr. C Residences Downtown?
The payment plan listed for Mr. C Residences Downtown is: 5% down, 25% pre-handover, 70% handover.
When is the handover of Mr. C Residences Downtown?
Alta Real-Estate Developments states handover of Mr. C Residences Downtown in Launched 2025-01-30. The Dubai Land Department project register lists the completion date of the project as January 2027.
How much of Mr. C Residences Downtown is built?
Mr. C Residences Downtown was 81% complete at the official RERA site inspection of 2 November 2026.
Is Mr. C Residences Downtown registered with the Dubai Land Department?
Yes. Mr. C Residences Downtown is registered with the Dubai Land Department as project number 2476, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Mr. C Residences Downtown?
Mr. C Residences Downtown is developed by Alta Real-Estate Developments. The Dubai Land Department project register lists 3 projects for Alta Real-Estate Developments: 1 delivered and 2 under construction.
Where is Mr. C Residences Downtown located?
Mr. C Residences Downtown is in Downtown Dubai, Dubai.
What unit types does Mr. C Residences Downtown offer?
Mr. C Residences Downtown offers 2 Bedroom, 3 Bedroom and 4 Bedroom, with sizes from 2,000 sqft (186 m²). The project has 179 units in the Dubai Land Department project register.
What is the average price per sqft in Downtown Dubai?
Apartments in Downtown Dubai sell for about AED 2,613/sqft (AED 28,127/m²), based on 1,405 registered sales in the last 12 months.
What rental yield can I expect in Downtown Dubai?
Apartments in Downtown Dubai yield about 5.3% gross, or about 4.3% net after service charges, based on 9,738 registered rent contracts and 1,405 sales in the last 12 months.
What are the service charges in Downtown Dubai?
Service charges for apartments in Downtown Dubai are about AED 24.97/sqft (AED 269/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.
Explore more
More off-plan projects by Alta Real-Estate Developments
✦ Want the full picture on Mr. C Residences Downtown?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 2 Nov 2026.