Kensington Waters is a project by Ellington Properties in Mohammed Bin Rashid City, Dubai. It offers Studio, 1BR, 2BR and 3BR. The Dubai Land Department project register lists completion for June 2024. It was 100% built at the official RERA site inspection of 14 February 2025.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: Ellington Properties official site.
About the project
Inspired by the element of water; 277 units in MBR City meeting Dubai Green Building requirements.
Construction progress
Finished100% complete at the latest RERA site inspection on 14 Feb 2025; completed 30 Jun 2024.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 14 Feb 2025 | 100% | 11 |
| 10 Jul 2024 | 82.44% | 6 |
| 24 Apr 2024 | 71.75% | 9 |
| 14 Sept 2023 | 37.79% | 10 |
| 11 May 2023 | 22.23% | 7 |
| 2 Jan 2023 | 8.43% | 5 |
| 21 Jun 2022 | 2.93% | 5 |
Official RERA site-inspection records for registered project #2300, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (4.2 hours a day after 1 pm): North-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 2.4 h | 0.0 h | 1.0 h | 1.7 / 4.8 |
| South-east | 5.2 h | 0.6 h | 4.4 h | 5.0 / 5.5 |
| South-west | 4.2 h | 3.2 h | 1.9 h | 2.5 / 6.2 |
| North-west | 4.2 h | 4.2 h | 0.1 h | 3.3 / 4.6 |
Neighbours shade the lower floors: in summer 2.5 hours a day on a low floor against 6.2 near the top, on the side facing South-west.
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 189 m (around 54 floors).
- Plot 3473927, 76 m away, being built · site plan: G+12
- Plot 3470383, 183 m away, being built · site plan: G+5P+48
- South-east
The planning register covers too little of what lies in front of this side to say what may be built there.
- South-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 6. The tallest may rise to about 189 m (around 54 floors).
- Plot 3473938, 221 m away, being built · site plan: G+5P+48
- Plot 3473283, 265 m away, being built · site plan: G+12
- Plot 3473939, 270 m away, being built · site plan: G+5P+48
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 46 m (around 13 floors). Floors below about 13 on this side may face a new building.
- Plot 3473911, 210 m away, being built · site plan: G+12
Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Amenities
How it compares in Mohammed Bin Rashid City
18 other off-plan projects in Mohammed Bin Rashid City · average entry price AED 1.63M
Kensington Waters: questions and answers
When is the handover of Kensington Waters?
The Dubai Land Department project register lists the completion date of Kensington Waters as June 2024.
How much of Kensington Waters is built?
Kensington Waters was 100% complete at the official RERA site inspection of 14 February 2025.
Is Kensington Waters registered with the Dubai Land Department?
Yes. Kensington Waters is registered with the Dubai Land Department as project number 2300, and its escrow account is held at Commercial Bank International P.J.S.C. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Kensington Waters?
Kensington Waters is developed by Ellington Properties. The Dubai Land Department project register lists 55 projects for Ellington Properties: 22 delivered and 33 under construction.
Where is Kensington Waters located?
Kensington Waters is in Mohammed Bin Rashid City, Dubai.
What unit types does Kensington Waters offer?
Kensington Waters offers Studio, 1BR, 2BR and 3BR. The project has 281 units in the Dubai Land Department project register.
What amenities does Kensington Waters have?
Kensington Waters lists these amenities: Leisure and lap pools, Kids splash pad and play areas, Panoramic fitness studio, Gaming lounge, Viewing deck, Pavilion club and terrace, Leisure outdoor park and Retail outlets.
Explore more
More off-plan projects by Ellington Properties
- Windsor House II, Dubai Southfrom AED 1.20M
- The Highgrove, Mohammed Bin Rashid Cityfrom AED 2.00M
- The Meriva Collection, Dubai Islandsfrom AED 2.90M
- Berkeley Tower, Business Bay
- Belgravia Gardens, Dubailand
- Eltiera Views, Jumeirah Islands
- Wilton Park Residences, Mohammed Bin Rashid City
- Harrington House, Jumeirah Village Circle
✦ Want the full picture on Kensington Waters?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 11 Nov 2026.





