Elara Building 2

by Meraas · 📍 Madinat Jumeirah Living

WhatsAppEmail

Price from

AED 2.30M

Elara Building 2 is a project by Meraas in Madinat Jumeirah Living, Dubai. Prices start from AED 2.30M. It offers 1 Bedroom and 2 Bedroom. Its handover is listed for November 2026. It was 78% built at the official RERA site inspection of 3 November 2026.

Official brochure

Layouts and floor plans inside. Source: independent listing.

Download brochure ↓
Unit typeSize rangeLayouts
1 Bedroom—1
2 Bedroom—1
3 Bedroom—1
4 Bedroom—1

Unit types & sizes read from the brochure; floor-plan drawings are in the PDF — download above.

About the project

Meraas presents Elara Building 2 at Madinat Jumeirah Living, an extraordinary addition to the community providing a unique lifestyle experience in Dubai. This development is part of a three-tower complex that showcases contemporary design and state-of-the-art interiors, complemented by its prime location. Discover a range of luxurious 1 to 3-bedroom apartments and 4-bedroom penthouses available for purchase. These units offer generous living spaces, bedrooms with private bathrooms, well-equipped kitchens and a balcony. Residents can indulge in breathtaking views of the iconic Burj Al Arab, pristine beaches and picturesque walkways surrounding Elara Building 2 at Madinat Jumeirah Living, offering an immersive and truly exceptional way of life.

Construction progress

78.35% complete at the latest RERA site inspection on 3 Nov 2026; scheduled completion 25 Nov 2026.

Project register as of 15 Nov 2026.

Elara Building 2 site photos from the RERA inspection on 3 Nov 2026 (6 of 9 shown).
InspectionCompletePhotos
3 Nov 202678.35%9
20 Jul 202664.27%10
30 Apr 202653.56%8
30 Jan 202640.04%14
22 Oct 202522.14%6
31 Jul 20258.37%4
7 May 20250.55%3
25 Feb 20250.04%3

Escrow account 4031224784662012 at First Abu Dhabi Bank P.J.S.C.. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #2754, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 70% of the price before the keys and 30% on handover.

Paid by today (booked at the start, construction share paid evenly)70%
Built (inspection of 3 Nov 2026)78%
Build time passed (registered start to registered completion)99%

By the inspection of 3 Nov 2026, payments and building progress were about level.

At the building's speed over the last 12 months it would be finished around 9 Apr 2027, about 4 months after the registered date. (registered completion: 25 Nov 2026)

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • East

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 46 m (around 13 floors).

    • Plot 3660845, 182 m away, being built · site plan: G+12 · Nourelle
  • West

    No plot in front (within 500 m) where a building of more than about 3 floors may rise: the view here is set by what stands today.

See the plots on the 3D map

Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Amenities

Gym or Health ClubKids Play AreaParking SpacesSwimming Pool

Who's selling this project

6 agencies are currently listing units in Elara Building 2 across 10 listings, from AED 2.37M to AED 4.31M depending on unit size and floor.

AgencyListingsAsking rangeTrust
4AED 2.37M – AED 4.31M4 verified · Trusted broker
2AED 2.73M – AED 3.59M2 verified · Trusted broker
1AED 2.73M1 verified · Trusted broker
1AED 2.73M1 verified · Trusted broker
1AED 2.69M1 verified · Trusted broker
1AED 2.73M1 verified · Trusted broker

Tap an agency to see its listings and call or WhatsApp the agent (sign in).

Live agency asking prices across unit types and floors — not sold prices.

How it compares in Madinat Jumeirah Living

7 other off-plan projects in Madinat Jumeirah Living · average entry price AED 2.88M · this project is 20% below that average

Elara Building 2: questions and answers

What is the starting price of Elara Building 2?

Prices at Elara Building 2 start from AED 2.30M, for homes from 721 sqft (67 m²), as listed for sale.

What is the payment plan for Elara Building 2?

The payment plan listed for Elara Building 2 is: 20% down, 50% pre-handover, 30% handover.

When is the handover of Elara Building 2?

The handover of Elara Building 2 is listed for November 2026. The Dubai Land Department project register lists the completion date of the project as November 2026.

How much of Elara Building 2 is built?

Elara Building 2 was 78% complete at the official RERA site inspection of 3 November 2026.

Is Elara Building 2 registered with the Dubai Land Department?

Yes. Elara Building 2 is registered with the Dubai Land Department as project number 2754, and its escrow account is held at First Abu Dhabi Bank P.J.S.C.. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Elara Building 2?

Elara Building 2 is developed by Meraas. The Dubai Land Department project register lists 76 projects for Meraas: 39 delivered and 36 under construction.

Where is Elara Building 2 located?

Elara Building 2 is in Madinat Jumeirah Living (Elara), Dubai.

What unit types does Elara Building 2 offer?

Elara Building 2 offers 1 Bedroom and 2 Bedroom, with sizes from 721 sqft (67 m²). The project has 238 units in the Dubai Land Department project register.

How does Elara Building 2 compare with other off-plan projects in Madinat Jumeirah Living?

The starting price of Elara Building 2 (AED 2.30M) is 20% below the average starting price of 5 other off-plan projects in Madinat Jumeirah Living, which is AED 2.88M.

What amenities does Elara Building 2 have?

Elara Building 2 lists these amenities: Gym or Health Club, Kids Play Area, Parking Spaces and Swimming Pool.

Explore more

✦ Want the full picture on Elara Building 2?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 3 Nov 2026.