Belmore Residences

by Ellington Properties · 📍 Mohammed Bin Rashid City

WhatsAppEmail

Price from

AED 1.80M

Belmore Residences is a project by Ellington Properties in Mohammed Bin Rashid City, Dubai. Prices start from AED 1.80M. It offers 1BR, 2BR and 3BR. The Dubai Land Department project register lists completion for December 2027. It was 7% built at the official RERA site inspection of 6 August 2026.

Floor plans

Layouts by unit type — tap any plan to view it full size.

Official brochure

Source: independent listing.

Download brochure ↓

About the project

Harmonious urban living with the tranquillity of nature in MBR City, applying golden ratio design principles.

Construction progress

6.53% complete at the latest RERA site inspection on 6 Aug 2026; scheduled completion 31 Dec 2027.

Project register as of 22 Nov 2026.

Belmore Residences site photos from the RERA inspection on 6 Aug 2026.
InspectionCompletePhotos
6 Aug 20266.53%4
25 Mar 20263.16%4
20 Aug 20250.16%3

Escrow account 3001748623000 at Arab Bank Plc. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #4033, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 70% of the price before the keys and 30% on handover.

Paid by today (booked at the start, construction share paid evenly)47%
Built (inspection of 6 Aug 2026)7%
Build time passed (registered start to registered completion)54%

By the inspection of 6 Aug 2026, on an even schedule, payments ran 34 points ahead of the building: more than the booking explains, so the build is behind its registered timetable. Payments go into the project's escrow account and the developer draws them only against inspected progress.

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    The planning register covers too little of what lies in front of this side to say what may be built there.

  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 13. The tallest may rise to about 123 m (around 35 floors).

    • Plot 6110304, 49 m away, no building on record · site plan: G+5P+26
    • Plot 6110307, 97 m away, no building on record · site plan: G+5P+26
    • Plot 6110297, 147 m away, no building on record · site plan: G+5P+26
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 17. The tallest may rise to about 140 m (around 40 floors).

    • Plot 6117277, 145 m away, being built · site plan: G+4P+23 · Zen Lagoons
    • Plot 6117276, 173 m away, no building on record · site plan: G+4P+23
    • Plot 6117264, 223 m away, no building on record · site plan: G+3P+21
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 9. The tallest may rise to about 133 m (around 38 floors).

    • Plot 6110226, 31 m away, being built
    • Plot 6110306, 57 m away, no building on record · site plan: G+5P+26
    • Plot 6110300, 107 m away, no building on record · site plan: G+5P+26

See the plots on the 3D map

Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Amenities

Infinity-edge leisure poolLandscaped gardensLobby receptionRetail and F&BIndoor/outdoor fitness/yoga studiosChildren's play areaOutdoor cinemaPicnic podsObservatory deckPet play and wash areaClubhouse

Who's selling this project

6 agencies are currently listing units in Belmore Residences across 6 listings, from AED 1.65M to AED 1.95M depending on unit size and floor.

AgencyListingsAsking rangeTrust
1AED 1.95M1 verified · Trusted broker
1AED 1.69M1 verified · Trusted broker
1AED 1.92MTrusted broker
1AED 1.79M1 verified · Trusted broker
1AED 1.65M1 verified · Trusted broker
1AED 1.65M1 verified · Trusted broker

Tap an agency to see its listings and call or WhatsApp the agent (sign in).

Live agency asking prices across unit types and floors — not sold prices.

How it compares in Mohammed Bin Rashid City

17 other off-plan projects in Mohammed Bin Rashid City · average entry price AED 1.62M · this project is 11% above that average

Belmore Residences: questions and answers

What is the starting price of Belmore Residences?

Prices at Belmore Residences start from AED 1.80M, for homes from 756 sqft (70 m²), as listed for sale.

What is the payment plan for Belmore Residences?

The payment plan listed for Belmore Residences is: 20% down, 50% pre-handover, 30% handover.

When is the handover of Belmore Residences?

The Dubai Land Department project register lists the completion date of Belmore Residences as December 2027.

How much of Belmore Residences is built?

Belmore Residences was 7% complete at the official RERA site inspection of 6 August 2026.

Is Belmore Residences registered with the Dubai Land Department?

Yes. Belmore Residences is registered with the Dubai Land Department as project number 4033, and its escrow account is held at Arab Bank Plc. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Belmore Residences?

Belmore Residences is developed by Ellington Properties. The Dubai Land Department project register lists 55 projects for Ellington Properties: 22 delivered and 33 under construction.

Where is Belmore Residences located?

Belmore Residences is in Mohammed Bin Rashid City, Dubai.

What unit types does Belmore Residences offer?

Belmore Residences offers 1BR, 2BR and 3BR, with sizes from 756 sqft (70 m²). The project has 214 units in the Dubai Land Department project register.

How does Belmore Residences compare with other off-plan projects in Mohammed Bin Rashid City?

The starting price of Belmore Residences (AED 1.80M) is 11% above the average starting price of 16 other off-plan projects in Mohammed Bin Rashid City, which is AED 1.62M.

What amenities does Belmore Residences have?

Belmore Residences lists these amenities: Infinity-edge leisure pool, Landscaped gardens, Lobby reception, Retail and F&B, Indoor/outdoor fitness/yoga studios, Children's play area, Outdoor cinema and Picnic pods, plus 3 more.

Explore more

More off-plan projects by Ellington Properties

✦ Want the full picture on Belmore Residences?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 8 Nov 2026.