THE STERLING WEST HOUSE
Data through November 2026 · DLDBy Omniyat, Business Bay — 24 registered sales in the last 12 months, at an average of AED 2,054/sqft (AED 22,109/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.
THE STERLING WEST HOUSE: price and rent by number of bedrooms
| Home | Average sale price | AED/sqftAED/m² | Sales | Average rent a year | Rent contracts | Gross yield |
|---|---|---|---|---|---|---|
| Studio | — | — | — | AED 75,024 | 14 | — |
| 1-bedroom | AED 2.03M | 1,98921,409 | 17 | AED 136,625 | 36 | 6.7% |
| 2-bedroom | — | — | — | AED 185,167 | 12 | — |
Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.
Price per sqft/m² trend
From 1 Jan 2024 to 11 Nov 2026 · ready sales only · apartments only · quarterly average of this project's sales; the latest quarter is still in progress
Sales by quarter
From 1 Jan 2024 to 11 Nov 2026 · ready sales only · apartments only · quarterly average of this project's sales; the latest quarter is still in progress
| Quarter | Sales | AED/sqftAED/m² |
|---|---|---|
| 2026-Q3 | 6 | 1,81519,536 |
| 2026-Q2 | 8 | 1,99621,485 |
| 2026-Q1 | 3 | 2,24124,122 |
| 2025-Q4 | 10 | 2,27624,499 |
| 2025-Q3 | 3 | 2,33725,155 |
| 2025-Q2 | 2 | 2,33225,101 |
| 2025-Q1 | 16 | 2,10722,680 |
| 2024-Q4 | 15 | 2,20623,745 |
| 2024-Q3 | 10 | 2,22223,917 |
| 2024-Q2 | 29 | 2,10022,604 |
| 2024-Q1 | 5 | 1,99621,485 |
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (1.8 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 4.9 h | 0.0 h | 1.2 h | 4.2 / 5.3 |
| South-east | 6.4 h | 0.0 h | 4.6 h | 5.5 / 6.8 |
| South-west | 3.3 h | 1.8 h | 6.2 h | 2.7 / 5.9 |
| North-west | 0.4 h | 0.2 h | 0.2 h | 0.2 / 2.3 |
Neighbours shade the lower floors: in summer 2.7 hours a day on a low floor against 5.9 near the top, on the side facing South-west.
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. One of them has no height limit in its site plan.
- Plot 3460713, 59 m away, being built · site plan: G+19 · Burj Pacific
- Plot 3460714, 119 m away, no building on record · site plan: G+30 (110m)
- Plot 3460742, 320 m away, being built · site plan: G+3P+25 · Velor
- South-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 130 m (around 37 floors).
- Plot 3460725, 199 m away, no building on record · site plan: G+19
- Plot 3460727, 260 m away, being built · site plan: G+19 · The Crestmark
- Plot 3460666, 452 m away, being built · site plan: G+36 · Regent Residences Dubai Sankari Place
- South-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 70 m (around 20 floors). Floors below about 20 on this side may face a new building.
- Plot 3460731, 420 m away, no building on record · site plan: G+19
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. One of them has no height limit in its site plan.
- Plot 3450423, 184 m away, being built · site plan: G+5P+45 · Inaura Hotels & Residences
- Plot 3450388, 212 m away, being built · site plan: G+4P+UNLIMITED · City Center Residences
- Plot 3454476, 281 m away, no building on record · site plan: G+15
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
How often homes here change hands
24 ready homes sold in the last 12 months, of 186 registered units: about 1 in 8. Across Business Bay, apartments: about 1 in 13.
Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.
From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.
Renewing tenants against new tenants
Tenants who renewed in THE STERLING WEST HOUSE pay on average 12.8% more than new tenants of the same bedroom count.
| Bedrooms | New leases (avg/yr) | Renewals (avg/yr) | Renewal vs new |
|---|---|---|---|
| Studio | AED 70,5057 leases | AED 79,5437 leases | +12.8% |
A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator
From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.
Cooling (chiller)
The owners' association budget for 2026 has no line for the homes' air-conditioning: cooling is billed separately (by a district-cooling company, or the home's own air-conditioning on the DEWA bill).
Full year 2026 · Owners' association budget registered with RERA (residential part, per sqft of the unit a year).
District cooling for this building: Empower.
Empower publishes its charges: AED 0.568 per ton-hour of cooling used and AED 750 per ton a year of contracted capacity (the developer sets each home's tons), plus a meter fee and 5% VAT.
Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.
Getting around and build time
Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 1.9 km in a straight line.
Bus stops within 800 m
- Coral Tower 1 · 10, 102, 103, 104150 m
- Coral Tower 2 · 10, 103, 105, 106170 m
- Canal Views Hotel Apartments 1 · F14, F19B, X22, 10260 m
- Alwajeha Al Maeyah Marine Transport Stat · 10, 310, 367, 53280 m
- Burj View central Tower 2 · 10, 102, 103, 104300 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
THE STERLING WEST HOUSE: questions and answers
What is the price per sqft at THE STERLING WEST HOUSE?
Homes at THE STERLING WEST HOUSE sold for an average of AED 2,054/sqft (AED 22,109/m²) over the last 12 months, with the middle half of sales between AED 1,867/sqft (AED 20,096/m²) and AED 2,228/sqft (AED 23,982/m²), from 24 registered sales.
How much does a home cost at THE STERLING WEST HOUSE?
Average ready sale prices at THE STERLING WEST HOUSE over the last 12 months: AED 2.03M for a 1-bedroom (17 sales), from official Dubai Land Department sale registrations.
How much is rent at THE STERLING WEST HOUSE?
Average yearly rents at THE STERLING WEST HOUSE over the 12 months to 11 Nov 2026: AED 75,024 for a studio, AED 136,625 for a 1-bedroom and AED 185,167 for a 2-bedroom, from 62 registered rent contracts (Ejari).
What rental yield does THE STERLING WEST HOUSE give?
At the average sale price and the average rent of the same home type, the gross rental yield at THE STERLING WEST HOUSE is about 6.7% for a 1-bedroom. Service charges and vacancy lower the net figure.
How many homes are sold at THE STERLING WEST HOUSE?
THE STERLING WEST HOUSE had 24 registered sales in the last 12 months, all ready homes.
Is THE STERLING WEST HOUSE more expensive than the rest of Business Bay?
The average price at THE STERLING WEST HOUSE is AED 2,054/sqft (AED 22,109/m²), 5% above the Business Bay average for ready homes over the same 12 months, which is AED 1,953/sqft (AED 21,022/m²).
Where is THE STERLING WEST HOUSE and who built it?
THE STERLING WEST HOUSE is in Business Bay, Dubai, and is a Omniyat development.
Explore more
Other buildings in Business Bay
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months
- Binghatti Aquarise prices and sales history430 sales
- Downtown Residences prices and sales history299 sales
- Binghatti Skyrise prices and sales history255 sales
- Peninsula Four prices and sales history232 sales
- One by Binghatti prices and sales history205 sales
- Al Habtoor Tower prices and sales history192 sales
- Avarra by Palace prices and sales history160 sales
- Peninsula Three prices and sales history158 sales
- The EDGE prices and sales history144 sales
- Bayz 102 By Danube prices and sales history129 sales