Prive Residence
Data through November 2026 · DLDBy Ginco Properties, Hadaeq Sheikh Mohammed Bin Rashid (Dubai Hills Estate, MBR City District 7) — 32 registered sales in the last 12 months, at an average of AED 2,083/sqft (AED 22,421/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.
Prive Residence: price and rent by number of bedrooms
| Home | Average sale price | AED/sqftAED/m² | Sales | Average rent a year | Rent contracts | Gross yield |
|---|---|---|---|---|---|---|
| Studio | — | — | — | AED 68,000 | 16 | — |
| 1-bedroom | — | — | — | AED 97,369 | 94 | — |
| 2-bedroom | — | — | — | AED 143,711 | 13 | — |
Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.3 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 6.0 h | 0.0 h | 3.8 h | 6.0 / 6.0 |
| South-east | 7.4 h | 0.5 h | 9.0 h | 7.4 / 7.4 |
| South-west | 6.2 h | 5.3 h | 6.1 h | 6.0 / 6.5 |
| North-west | 4.9 h | 4.8 h | 0.3 h | 4.6 / 5.1 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 77 m (around 22 floors).
- Plot 63111910, 205 m away, being built · site plan: G+P+20 · Hillsedge
- Plot 6311490, 262 m away, no building on record · site plan: G+12
- South-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 46 m (around 13 floors). Floors below about 13 on this side may face a new building.
- Plot 6316306, 148 m away, no building on record · site plan: G+12
- South-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 42 m (around 12 floors). Floors below about 12 on this side may face a new building.
- Plot 6317871, 189 m away, being built · site plan: G+2P+9 · Soho The Berkeley
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 91 m (around 26 floors).
- Plot 63111911, 144 m away, being built · site plan: G+P+24 · Vida Residences Hillside
- Plot 6317269, 264 m away, being built · site plan: G+P+22 · Palace Residences Hillside B
- Plot 63111912, 357 m away, being built · site plan: G+P+24 · Parkwood
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
How often homes here change hands
32 ready homes sold in the last 12 months, of 225 registered units: about 1 in 7. Across Hadaeq Sheikh Mohammed Bin Rashid (Dubai Hills Estate, MBR City District 7), apartments: about 1 in 13.
Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.
From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.
Renewing tenants against new tenants
Tenants who renewed in Prive Residence pay on average 6.1% more than new tenants of the same bedroom count.
| Bedrooms | New leases (avg/yr) | Renewals (avg/yr) | Renewal vs new |
|---|---|---|---|
| 1-bedroom | AED 95,37462 leases | AED 101,23432 leases | +6.1% |
A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator
From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.
Cooling (chiller)
District cooling for this building: Emaar District Cooling.
Snapshot of 15 Nov 2026 · Who supplies the cooling: the list of district-cooling buildings and their permit holders kept by Dubai's Regulatory and Supervisory Bureau (RSB), matched to this building by name and position; charges as the company publishes them.
Getting around and build time
Nearest metro: First Abu Dhabi Bank Metro Station (Red Metro line), 4.7 km in a straight line.
Bus stops within 800 m
- Dubai Hills, Kings College Hospital 1 · 13D, 44, 61, 98E320 m
- Dubai Hills, Park Heights 1 · 13D, 44, 61, 98E550 m
- Dubai Hills, Mulberry 1 1 · 13D, 44, 61, 98E570 m
- Dubai Hills, Acacia 1 · 13D, 44, 61, 98E740 m
- Dubai Hills, Mulberry 2 1 · 13D, 44, 61, 98E750 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
Prive Residence: questions and answers
What is the price per sqft at Prive Residence?
Homes at Prive Residence sold for an average of AED 2,083/sqft (AED 22,421/m²) over the last 12 months, with the middle half of sales between AED 1,999/sqft (AED 21,517/m²) and AED 2,126/sqft (AED 22,884/m²), from 32 registered sales.
How much is rent at Prive Residence?
Average yearly rents at Prive Residence over the 12 months to 11 Nov 2026: AED 68,000 for a studio, AED 97,369 for a 1-bedroom and AED 143,711 for a 2-bedroom, from 123 registered rent contracts (Ejari).
How many homes are sold at Prive Residence?
Prive Residence had 32 registered sales in the last 12 months, all ready homes.
Where is Prive Residence and who built it?
Prive Residence is in Hadaeq Sheikh Mohammed Bin Rashid (Dubai Hills Estate, MBR City District 7), Dubai, and is a Ginco Properties development.
Explore more
Other buildings in Hadaeq Sheikh Mohammed Bin Rashid (Dubai Hills Estate, MBR City District 7)
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months
- Palace Residences Hillside A prices and sales history349 sales
- Greencrest prices and sales history146 sales
- MAG EYE Phase 1 prices and sales history99 sales
- Vida Residences Hillside prices and sales history85 sales
- Elvira prices and sales history79 sales
- Rosehill prices and sales history75 sales
- Parkwood prices and sales history71 sales
- PARK RIDGE prices and sales history60 sales
- Park Horizon prices and sales history60 sales
- Hills Park prices and sales history58 sales