One Za'abeel
Data through November 2026 · DLDBy One Zaabeel, Zabeel — 32 registered sales in the last 12 months, at an average of AED 4,390/sqft (AED 47,254/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Sales count: ready and off-plan together. Average and range: ready sales only.
One Za'abeel: price and rent by number of bedrooms
| Home | Average sale price | AED/sqftAED/m² | Sales | Average rent a year | Rent contracts | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom | — | — | — | AED 329,150 | 31 | — |
| 2-bedroom | — | — | — | AED 615,379 | 89 | — |
| 3-bedroom | — | — | — | AED 696,867* | 10 | — |
Sale prices: ready homes, registered sales of the last 12 months (a bedroom count needs 5 sales). Rents: registered rent contracts (Ejari), 12 months to 11 Nov 2026. Yield = average rent ÷ average price. * Median rent: a few very high leases lift the average.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 4.7 h | 0.0 h | 0.9 h | 0.8 / 5.5 |
| South-east | 3.6 h | 0.1 h | 7.0 h | 2.2 / 6.8 |
| South-west | 7.2 h | 5.7 h | 8.4 h | 5.8 / 7.2 |
| North-west | 5.9 h | 5.6 h | 3.1 h | 5.3 / 5.9 |
Neighbours shade the lower floors: in summer 0.8 hours a day on a low floor against 5.5 near the top, on the side facing North-east.
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
How often homes here change hands
32 ready homes sold in the last 12 months, of 263 registered units: about 1 in 8. Across Zabeel, apartments: about 1 in 8.
Homes in a building where sales are frequent are usually quicker to sell later; a low figure can also mean owners hold on to their homes.
From 12 Nov 2025 to 11 Nov 2026 · Ready sales registered with the Land Department (resales and the developer's sales of finished homes), against the residential units of the project in the Land Department's project register.
Renewing tenants against new tenants
Tenants who renewed in One Za'abeel pay on average 1.2% less than new tenants of the same bedroom count.
| Bedrooms | New leases (avg/yr) | Renewals (avg/yr) | Renewal vs new |
|---|---|---|---|
| 1-bedroom | AED 314,34823 leases | AED 371,7068 leases | +18.2% |
| 2-bedroom | AED 613,75366 leases | AED 566,26124 leases | -7.7% |
A tenant who renews pays the old rent plus the rise the RERA rental index allows; where new leases cost more, staying saves money, and where they cost less, it pays to compare before renewing. Rent increase calculator
From 11 Nov 2025 to 10 Nov 2026 · Ejari residential leases that started in the period (bulk leases left out), averages. Renewals and new leases are compared inside the same building; an area's figure averages its buildings, so newer towers (mostly new leases) do not tilt it. The all-bedroom figure averages the bedroom counts.
Getting around and build time
Nearest metro: Al Jafiliya Metro Station (Red Metro line), 660 m in a straight line.
Bus stops within 800 m
- World Trade Centre Hotel 2 · 27, 29, 55, 6190 m
- World Trade Centre Hotel 1 · 10, 102, 103, 104110 m
- Al Jafiliya Bus Station 6 · 105, 11A, 12, 13A470 m
- Al Jafiliya Bus Station 5 · 10, 103, 105, 110470 m
- Al Jafiliya Bus Station 4 · 10, 103, 105, 11B480 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
One Za'abeel: questions and answers
What is the price per sqft at One Za'abeel?
Homes at One Za'abeel sold for an average of AED 4,390/sqft (AED 47,254/m²) over the last 12 months, with the middle half of sales between AED 3,973/sqft (AED 42,765/m²) and AED 4,852/sqft (AED 52,226/m²), from 32 registered sales.
How much is rent at One Za'abeel?
Average yearly rents at One Za'abeel over the 12 months to 11 Nov 2026: AED 329,150 for a 1-bedroom, AED 615,379 for a 2-bedroom and AED 696,867 for a 3-bedroom, from 130 registered rent contracts (Ejari).
How many homes are sold at One Za'abeel?
One Za'abeel had 32 registered sales in the last 12 months, all ready homes.
Is One Za'abeel more expensive than the rest of Zabeel?
The average price at One Za'abeel is AED 4,390/sqft (AED 47,254/m²), in line with the Zabeel average for ready homes over the same 12 months, which is AED 4,390/sqft (AED 47,254/m²).
Where is One Za'abeel and who built it?
One Za'abeel is in Zabeel, Dubai, and is a One Zaabeel development.
Explore more
Other buildings in Zabeel
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months