Mirdad
Data through November 2026 · DLDBy Union Properties, Motor City — 144 registered sales in the last 12 months, at an average of AED 1,903/sqft (AED 20,484/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 5.6 / 5.6 |
| East | 6.3 h | 0.0 h | 5.0 h | 6.3 / 6.3 |
| South | 6.1 h | 2.4 h | 9.9 h | 6.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 6.3 / 6.3 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 196 m (around 56 floors).
- Plot 6740194, 367 m away, no building on record · site plan: G+55
- Plot 6740288, 459 m away, being built · site plan: G+5 · Monarch
- East
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 140 m (around 40 floors).
- Plot 6740289, 264 m away, being built · site plan: G+39 · O1ne District - Dawn
- South
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 179 m (around 51 floors).
- Plot 6740191, 145 m away, being built · site plan: G+27 · Capital One
- Plot 6740341, 188 m away, being built · site plan: G+6P+40 · Binghatti Skyterraces
- Plot 6740192, 261 m away, being built · site plan: G+50 · Ananda Residences
- West
The planning register covers too little of what lies in front of this side to say what may be built there.
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Getting around and build time
Nearest metro: Jumeirah Golf Estates Metro Station (Red Metro line), 7.4 km in a straight line.
Bus stops within 800 m
- Motor City, Autodrome Stadium 1 · 10, 103, 104, 105540 m
- Motor City, Autodrome Stadium 2 · 10, 104, 105, 110560 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
Mirdad: questions and answers
What is the price per sqft at Mirdad?
Homes at Mirdad sold for an average of AED 1,903/sqft (AED 20,484/m²) over the last 12 months, with the middle half of sales between AED 1,831/sqft (AED 19,709/m²) and AED 1,951/sqft (AED 21,000/m²), from 144 registered sales.
How many homes are sold at Mirdad?
Mirdad had 144 registered sales in the last 12 months, all off-plan.
Where is Mirdad and who built it?
Mirdad is in Motor City, Dubai, and is a Union Properties development.
Explore more
Other buildings in Motor City
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months
- Binghatti Skyterraces prices and sales history931 sales
- SIERRA BY IMAN prices and sales history548 sales
- Sobha Solis prices and sales history314 sales
- ANANDA RESIDENCES prices and sales history158 sales
- Sobha Orbis prices and sales history139 sales
- Takaya prices and sales history135 sales
- Beverly Grande prices and sales history115 sales
- 15 CASCADE prices and sales history109 sales
- Velos Residence prices and sales history81 sales
- CASA FLORES AND EDEN APARTMENTS prices and sales history74 sales