EQUITI TOWER

Data through November 2026 · DLD
WhatsAppEmail

By BNH Real Estate Developer, International City Phase 3 — 32 registered sales in the last 12 months, at an average of AED 1,074/sqft (AED 11,560/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.

32
Registered sales
AED 1,074 /sqft
AED 11,560 /m²
Average price per sqft · m²
AED 1,027–1,106/sqft, or AED 11,055–11,905/m²
Typical range (p25–p75)
100%
Off-plan share of sales

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (4.2 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North4.8 h2.1 h0.0 h4.1 / 5.5
East6.2 h0.0 h4.5 h6.1 / 6.3
South6.0 h2.3 h9.0 h5.8 / 6.1
West4.8 h4.2 h4.1 h3.9 / 6.3

Neighbours shade the lower floors: in summer 3.9 hours a day on a low floor against 6.3 near the top, on the side facing West.

Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.

Getting around and build time

Nearest metro: Rashidiya Metro Station (Red Metro line), 8.6 km in a straight line.

Bus stops within 800 m

  • Al Warsan Fourth, Bus Stop 3 - 1 · 10, 102, 103, 104430 m
  • Al Warsan Fourth, Bus Stop 3 - 2 · 12, 13A, 13B, 13D460 m
  • Manama Road 4-2 · 10, 103, 104, 105490 m
  • Sh Mohammed Bin Zayed Rd 1 2 (Non-stop) · 97600 m
  • Manama Road 4-1 · 10, 102, 103, 104650 m

How long buildings like this take in Dubai

  • Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)

Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.

Methodology

EQUITI TOWER: questions and answers

What is the price per sqft at EQUITI TOWER?

Homes at EQUITI TOWER sold for an average of AED 1,074/sqft (AED 11,560/m²) over the last 12 months, with the middle half of sales between AED 1,027/sqft (AED 11,055/m²) and AED 1,106/sqft (AED 11,905/m²), from 32 registered sales.

How many homes are sold at EQUITI TOWER?

EQUITI TOWER had 32 registered sales in the last 12 months, all off-plan.

Where is EQUITI TOWER and who built it?

EQUITI TOWER is in International City Phase 3, Dubai, and is a BNH Real Estate Developer development.

Explore more

Other buildings in International City Phase 3

Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months