Crystal Tower
Data through November 2026 · DLDBy VHS Developments, International City Phase 1 — 24 registered sales in the last 12 months, at an average of AED 1,205/sqft (AED 12,970/m²), from Dubai Land Department (DLD) data and 200M+ datapoints from multiple sources.
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · Count: all sales. Average and range: off-plan only.
A few sales far from the rest pull the average outside the typical range, so the median is shown.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 5.6 / 5.6 |
| East | 6.3 h | 0.0 h | 5.2 h | 6.3 / 6.3 |
| South | 6.1 h | 2.4 h | 10.5 h | 6.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 6.3 / 6.3 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 25 m (around 7 floors). Floors below about 7 on this side may face a new building.
- Plot 6218546, 72 m away, no building on record · site plan: G+6
- Plot 6218599, 80 m away, no building on record · site plan: G+6
- Plot 6218545, 81 m away, no building on record · site plan: G+6
- East
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 30. The tallest may rise to about 28 m (around 8 floors). Floors below about 8 on this side may face a new building.
- Plot 6218543, 120 m away, no building on record · site plan: G+6
- Plot 6218542, 147 m away, no building on record · site plan: G+6
- Plot 6218582, 160 m away, no building on record · site plan: G+6
- South
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 28 m (around 8 floors). Floors below about 8 on this side may face a new building.
- Plot 6218574, 35 m away, no building on record · site plan: G+7
- Plot 6218627, 120 m away, no building on record · site plan: G+3
- Plot 6218625, 147 m away, no building on record · site plan: G+7
- West
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 15. The tallest may rise to about 28 m (around 8 floors). Floors below about 8 on this side may face a new building.
- Plot 6218495, 72 m away, no building on record · site plan: G+7
- Plot 6218494, 82 m away, no building on record · site plan: G+7
- Plot 6212101, 126 m away, no building on record · site plan: G+6
Snapshot of 15 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Getting around and build time
Nearest metro: Burj Khalifa/ Dubai Mall Metro Station (Red Metro line), 2.2 km in a straight line.
Bus stops within 800 m
- Dubai Fountain Street 1 · 10, 105, 106, 11A130 m
- Dubai Fountain St.1 · 50, X22150 m
- Dubai Fountain Street 2 · 10, 102, 103, 104230 m
- Empire Heights Towers 2 · 10, 103, 105, 106450 m
- Empire Heights Towers 1 · F14, X22, 10, 102460 m
How long buildings like this take in Dubai
- Multi-storey buildings, all heights: average 33 months from permit to completion (middle half 19–34; 104 buildings completed in 2026)
Dubai Municipality register, all of Dubai. The usual time for this kind of building, not a promise for this project.
Methodology
Last 12 months of DLD sale registrations, homes only; off-plan and ready never blended; sales outside AED 50–25,000/sqft, or AED 538–269,098/m² excluded. Listed with 10+ sales in the last 12 months. Data through November 2026.
Crystal Tower: questions and answers
What is the price per sqft at Crystal Tower?
Homes at Crystal Tower sold for an average of AED 1,205/sqft (AED 12,970/m²) over the last 12 months, with the middle half of sales between AED 1,200/sqft (AED 12,917/m²) and AED 1,200/sqft (AED 12,917/m²), from 24 registered sales.
How many homes are sold at Crystal Tower?
Crystal Tower had 24 registered sales in the last 12 months, all off-plan.
Where is Crystal Tower and who built it?
Crystal Tower is in International City Phase 1, Dubai, and is a VHS Developments development.
Explore more
Other buildings in International City Phase 1
Last 12 months: 12 Nov 2025 – 11 Nov 2026 · the Sales column counts registered sales of the last 12 months
- AYAMI RESIDENCE, BY AYAT DEVELOPMENT prices and sales history220 sales
- Longford Residences by Devan Real Estate Development prices and sales history174 sales
- YIGO26 prices and sales history128 sales
- INTERNATIONAL CITY EMARATI prices and sales history103 sales
- Ryze by AUM prices and sales history64 sales
- Lawnz Residence by Danube prices and sales history64 sales
- Petalz By Danube prices and sales history32 sales
- Olivz Residence prices and sales history29 sales
- CLASSIC APARTMENTS prices and sales history28 sales
- Listone Residence prices and sales history20 sales