W Residences Dubai Harbour

by Arada Development · 📍 Dubai Harbour

WhatsAppEmail

Price from

AED 5.00M

W Residences Dubai Harbour is a project by Arada Development in Dubai Harbour, Dubai. Prices start from AED 5.00M. It offers 1 Bedroom, 2 Bedroom, 3 Bedroom, 4 Bedroom and 5 Bedroom. The Dubai Land Department project register lists completion for December 2028. It was 4% built at the official RERA site inspection of 13 October 2026.

Floor plans

Layouts by unit type — tap any plan to view it full size.

Official brochure

Source: independent listing.

Download brochure ↓

About the project

Three-tower luxury branded-residence complex at Dubai Harbour with over 400 homes and breathtaking Dubai skyline and seafront views.

Construction progress

3.99% complete at the latest RERA site inspection on 13 Oct 2026; scheduled completion 31 Dec 2028.

Project register as of 22 Nov 2026.

W Residences Dubai Harbour site photos from the RERA inspection on 13 Oct 2026.
InspectionCompletePhotos
13 Oct 20263.99%6
6 Jul 20262.04%5
16 Feb 20260.04%2
26 Aug 20250%2
26 Sept 20240%3

Escrow account 0023429246003 at National Bank Of Ras Al- Khaimah (P.S.C). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #3317, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 60% of the price before the keys and 40% on handover.

Paid by today (booked at the start, construction share paid evenly)30%
Built (inspection of 13 Oct 2026)4%
Build time passed (registered start to registered completion)41%

By the inspection of 13 Oct 2026, on an even schedule, payments ran 25 points ahead of the building: more than the booking explains, so the build is behind its registered timetable. Payments go into the project's escrow account and the developer draws them only against inspected progress.

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.1 h2.8 h0.0 h3.9 / 5.6
East6.0 h0.0 h5.0 h5.2 / 6.3
South6.1 h2.4 h10.5 h5.8 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Neighbours shade the lower floors: in summer 3.9 hours a day on a low floor against 5.6 near the top, on the side facing North.

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 40 m (around 11 floors). Floors below about 11 on this side may face a new building.

    • Plot 3920739, 301 m away, being built · site plan: G+8 (40m) · Dubai Harbour Residences (Area 1)
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 220 m (around 63 floors).

    • Plot 3920719, 229 m away, being built · site plan: G+4P+55 (220m) · Damac Bay 2
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 275 m (around 79 floors).

    • Plot 3920736, 216 m away, being built · site plan: G+9P+53 (245m) · Sobha Seahaven Tower B & C
    • Plot 3920660, 278 m away, being built · site plan: G+9P+60 (275m) · Sobha Seahaven Tower A
    • Plot 3920720, 342 m away, no building on record · site plan: G+2 (20m)
  • West

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 47 m (around 13 floors). Floors below about 13 on this side may face a new building.

    • Plot 3920635, 480 m away, being built · site plan: G+9 (47.4m) · The Residences At The Dubai Beach Edition

See the plots on the 3D map

Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Units sold

Snapshot of 25 Sept 2026

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
1 Bed1,050–1,470 sqft (98–137 m²)AED 5.00M77 / 113
2 Beds1,400–2,550 sqft (130–237 m²)AED 7.00M109 / 125
3 Beds1,930–5,730 sqft (179–532 m²)AED 11.50M50 / 69

Amenities

Podium-level amenities and servicesLEED-certified architecturePromenade and harbour access

How it compares in Dubai Harbour

9 other off-plan projects in Dubai Harbour · average entry price AED 3.73M · this project is 34% above that average

W Residences Dubai Harbour: questions and answers

What is the starting price of W Residences Dubai Harbour?

Prices at W Residences Dubai Harbour start from AED 5.00M, as listed for sale.

What is the payment plan for W Residences Dubai Harbour?

The payment plan listed for W Residences Dubai Harbour is: 10% down, 50% pre-handover, 40% handover.

When is the handover of W Residences Dubai Harbour?

The Dubai Land Department project register lists the completion date of W Residences Dubai Harbour as December 2028.

How much of W Residences Dubai Harbour is built?

W Residences Dubai Harbour was 4% complete at the official RERA site inspection of 13 October 2026.

Is W Residences Dubai Harbour registered with the Dubai Land Department?

Yes. W Residences Dubai Harbour is registered with the Dubai Land Department as project number 3317, and its escrow account is held at National Bank Of Ras Al- Khaimah (P.S.C). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of W Residences Dubai Harbour?

W Residences Dubai Harbour is developed by Arada Development. The Dubai Land Department project register lists 5 projects for Arada, all under construction.

Where is W Residences Dubai Harbour located?

W Residences Dubai Harbour is in Dubai Harbour (Dubai), Dubai.

What unit types does W Residences Dubai Harbour offer?

W Residences Dubai Harbour offers 1 Bedroom, 2 Bedroom, 3 Bedroom, 4 Bedroom and 5 Bedroom, with sizes from 1,050 sqft (98 m²). The project has 494 units in the Dubai Land Department project register.

How does W Residences Dubai Harbour compare with other off-plan projects in Dubai Harbour?

The starting price of W Residences Dubai Harbour (AED 5.00M) is 34% above the average starting price of 9 other off-plan projects in Dubai Harbour, which is AED 3.73M.

What amenities does W Residences Dubai Harbour have?

W Residences Dubai Harbour lists these amenities: Podium-level amenities and services, LEED-certified architecture and Promenade and harbour access.

Explore more

More off-plan projects by Arada Development

✦ Want the full picture on W Residences Dubai Harbour?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 13 Oct 2026.