Villa del Gavi

by Mr Eight Development · 📍 Dubai Islands

WhatsAppEmail

Price from

AED 3.66M

Villa del Gavi is a project by Mr Eight Development in Dubai Islands, Dubai. Prices start from AED 3.66M. It offers 2BR, 3BR and 4BR. Mr Eight Development states handover in Q4 2027. It was 38% built at the official RERA site inspection of 28 September 2026.

Special offerMr. Eight changes payment plan for Villa del Gavi and Villa del Brunello on Dubai Islands from 35/65 to 25/75.

Official brochure

Layouts and floor plans inside. Source: Mr Eight Development official site.

Download brochure ↓

About the project

Exclusive luxury branded residences on Dubai Islands with Mediterranean seaside architecture and beachfront positioning. 2-4 bedroom apartments, ~20 minutes from Downtown Dubai.

Units & pricing

UnitSizePrice from
2BR—AED 3.66M

Latest offers from the developer

Units the developer's sales team is offering right now, with their own prices and payment plans.

  • Special offerMr. Eight changes payment plan for Villa del Gavi and Villa del Brunello on Dubai Islands from 35/65 to 25/75.

    Plan 25/75

    6 Nov 2026

Construction progress

37.57% complete at the latest RERA site inspection on 28 Sept 2026; scheduled completion 25 Dec 2027.

Project register as of 22 Nov 2026.

Villa del Gavi site photos from the RERA inspection on 28 Sept 2026 (6 of 9 shown).
InspectionCompletePhotos
28 Sept 202637.57%9
8 Jul 202615.88%9
25 Mar 20263.66%3
16 Jun 20250%2

Escrow account 01434279234 at Bank Of Sharjah. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #3751, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 35% of the price before the keys and 65% on handover.

Paid by today (booked at the start, construction share paid evenly)18%
Built (inspection of 28 Sept 2026)38%
Build time passed (registered start to registered completion)53%

By the inspection of 28 Sept 2026, the building ran 22 points ahead of the payments on an even schedule.

At the building's speed over the last 12 months it would be finished around 7 Sept 2027, about 4 months before the registered date. (registered completion: 25 Dec 2027)

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

Under a landing line

This building sits about 301 m from the extended centre line of Dubai International (DXB) runway 12L, about 6.7 km before the runway. Planes landing on it pass at about 365 m. Planes taking off on runway 30R climb out over the same line. Which way the runway is used depends on the wind.

Estimate: runway ends from public aviation data, a standard 3° approach; shown within 15 km of the runway and close to its centre line.

Units sold

Snapshot of 1 Nov 2026

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
2 Beds1,010–2,290 sqft (94–213 m²)AED 4.10M40 / 52
3 Beds1,660–4,630 sqft (154–430 m²)AED 7.20M12 / 18
4 Beds2,510–5,350 sqft (233–497 m²)AED 10.20M7 / 17

Amenities

BeachfrontPrivate poolsHousekeepingBell boyLaundry/dry cleaningPersonal trainerRolls-Royce chauffeurBranded golf carts with driversRiva motorboat with captainIn-home massage

Who's selling this project

11 agencies are currently listing units in Villa del Gavi across 19 listings, from AED 3.57M to AED 18.80M depending on unit size and floor.

AgencyListingsAsking rangeTrust
4AED 4.34M – AED 5.33M4 verified · Trusted broker
3AED 4.65M – AED 9.00M3 verified · Trusted broker
3AED 6.80M – AED 18.80M3 verified · Trusted broker
2AED 8.00M – AED 9.53M2 verified · Trusted broker
1AED 5.30MTrusted broker
1AED 12.00M1 verified
1AED 3.57M1 verified · Trusted broker
1AED 4.90M1 verified · Trusted broker
1AED 9.45M1 verified · Trusted broker
1AED 9.53M1 verified · Trusted broker
1AED 3.96M1 verified

Tap an agency to see its listings and call or WhatsApp the agent (sign in).

Live agency asking prices across unit types and floors — not sold prices.

How it compares in Dubai Islands

126 other off-plan projects in Dubai Islands · average entry price AED 2.22M · this project is 65% above that average

Villa del Gavi: questions and answers

What is the starting price of Villa del Gavi?

Prices at Villa del Gavi start from AED 3.66M, for homes from 1,010 sqft (94 m²), as published by Mr Eight Development.

What is the payment plan for Villa del Gavi?

The payment plan published by Mr Eight Development for Villa del Gavi is: 35/65.

When is the handover of Villa del Gavi?

Mr Eight Development states handover of Villa del Gavi in Q4 2027. The Dubai Land Department project register lists the completion date of the project as December 2027.

How much of Villa del Gavi is built?

Villa del Gavi was 38% complete at the official RERA site inspection of 28 September 2026.

Is Villa del Gavi registered with the Dubai Land Department?

Yes. Villa del Gavi is registered with the Dubai Land Department as project number 3751, and its escrow account is held at Bank Of Sharjah. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Villa del Gavi?

Villa del Gavi is developed by Mr Eight Development. The Dubai Land Department project register lists 7 projects for Mr Eight Development, all under construction.

Where is Villa del Gavi located?

Villa del Gavi is in Dubai Islands, Dubai.

What unit types does Villa del Gavi offer?

Villa del Gavi offers 2BR, 3BR and 4BR, with sizes from 1,010 sqft (94 m²). The project has 87 units in the Dubai Land Department project register.

Is there a special offer on Villa del Gavi now?

Yes. Mr. Eight changes payment plan for Villa del Gavi and Villa del Brunello on Dubai Islands from 35/65 to 25/75.

How does Villa del Gavi compare with other off-plan projects in Dubai Islands?

The starting price of Villa del Gavi (AED 3.66M) is 65% above the average starting price of 113 other off-plan projects in Dubai Islands, which is AED 2.22M.

What amenities does Villa del Gavi have?

Villa del Gavi lists these amenities: Beachfront, Private pools, Housekeeping, Bell boy, Laundry/dry cleaning, Personal trainer, Rolls-Royce chauffeur and Branded golf carts with drivers, plus 2 more.

Explore more

More off-plan projects by Mr Eight Development

✦ Want the full picture on Villa del Gavi?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 1 Nov 2026.