Tomorrow Commercial Tower

by Tomorrow World Group · 📍 International City

WhatsAppEmail

Price from

AED 1.90M

Tomorrow Commercial Tower is a project by Tomorrow World Group in International City, Dubai. Prices start from AED 1.90M. Tomorrow World Group states handover in March 2027. It was 70% built at the official RERA site inspection of 1 October 2026.

Official brochure

Layouts and floor plans inside. Source: Tomorrow World Group official site.

Download brochure ↓

About the project

Commercial tower of offices and ground-floor retail in International City CBD designed for SMEs and corporates.

Construction progress

70.01% complete at the latest RERA site inspection on 1 Oct 2026; originally scheduled 31 Jul 2026.

Project register as of 22 Nov 2026.

Tomorrow Commercial Tower site photos from the RERA inspection on 1 Oct 2026 (6 of 9 shown).
InspectionCompletePhotos
1 Oct 202670.01%9
15 Apr 202633.21%8
15 Apr 202633.21%8
21 Jan 202622.61%10
3 Nov 202516.04%8
16 Jun 20257.3%5

Escrow account 19472536 at Abu Dhabi Islamic Bank. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #3605, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 30% of the price before the keys and 70% on handover.

Paid by today (booked at the start, construction share paid evenly)30%
Built (inspection of 1 Oct 2026)70%
Build time passed (registered start to registered completion)100%

The registered completion date has passed with the building 70% built at the latest inspection.

At the building's speed over the last 12 months it would be finished around 10 Mar 2027, about 7 months after the registered date. (registered completion: 31 Jul 2026)

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.2 h6.3 / 6.3
South6.1 h2.4 h10.5 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

Amenities

Glass curtain wall facadeDouble-height grand lobbyFour high-speed OTIS elevatorsSmart building managementDedicated and public parking

Tomorrow Commercial Tower: questions and answers

What is the starting price of Tomorrow Commercial Tower?

Prices at Tomorrow Commercial Tower start from AED 1.90M, for homes from 1,066 sqft (99 m²) to 4,189 sqft (389 m²), as published by Tomorrow World Group.

What is the payment plan for Tomorrow Commercial Tower?

The payment plan published by Tomorrow World Group for Tomorrow Commercial Tower is: 30/70.

When is the handover of Tomorrow Commercial Tower?

Tomorrow World Group states handover of Tomorrow Commercial Tower in March 2027. The Dubai Land Department project register lists July 2026 as the original completion date of the project; it is still under construction.

How much of Tomorrow Commercial Tower is built?

Tomorrow Commercial Tower was 70% complete at the official RERA site inspection of 1 October 2026.

Is Tomorrow Commercial Tower registered with the Dubai Land Department?

Yes. Tomorrow Commercial Tower is registered with the Dubai Land Department as project number 3605, and its escrow account is held at Abu Dhabi Islamic Bank. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Tomorrow Commercial Tower?

Tomorrow Commercial Tower is developed by Tomorrow World Group. The Dubai Land Department project register lists 4 projects for Tomorrow World Group, all under construction.

Where is Tomorrow Commercial Tower located?

Tomorrow Commercial Tower is in International City (CBD), Dubai.

What unit types does Tomorrow Commercial Tower offer?

The project has 133 units in the Dubai Land Department project register.

What amenities does Tomorrow Commercial Tower have?

Tomorrow Commercial Tower lists these amenities: Glass curtain wall facade, Double-height grand lobby, Four high-speed OTIS elevators, Smart building management and Dedicated and public parking.

Explore more

More off-plan projects by Tomorrow World Group

✦ Want the full picture on Tomorrow Commercial Tower?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 9 Nov 2026.