The Edit
by Meraas · 📍 Dubai Design District (D3)
The Edit is a project by Meraas in Dubai Design District (D3), Dubai. The Dubai Land Department project register lists completion for January 2030. It was 0% built at the official RERA site inspection of 19 August 2026.

About the project
The Edit at D3 will be an architectural masterpiece planned for Dubai Design District (D3). This complex is being developed by Meraas and will redefine modern urban excellence. It will offer an exclusive collection of 1 to 4-bedroom apartments and penthouses, sprawling across three buildings. The striking facades of this project are characterised by filleted corners, soft edges and continuous balcony lines, resulting in a fluid, contemporary aesthetic. This architectural elegance will be complemented by spacious interiors with natural light, open spaces and lush greenery. The Edit Tower A will be the first of the three buildings belonging to The Edit at D3. Serving as a vibrant cornerstone, residents will experience the dynamic, community-centric atmosphere of Dubai Design District. This tower will offer a premium collection of 1, 2, 3 and 4-bedroom residences alongside exclusive penthouses. Each unit will feature spacious, open-plan layouts for maximum space and natural light. The Edit Tower B will follow the same architectural philosophy by integrating residential luxury with the renowned creative energy of D3. Tower B is planned to strike a perfect balance between generous spatial dimensions and everyday functionality for those who appreciate cutting-edge lifestyle and practical comfort. This building will also offer the signature mix of 1 to 4-bedroom apartments and penthouses. Completing the exceptional residential trio, The Edit Tower C anchors this exuberant off-plan complex. This upcoming tower by Meraas will follow the same aesthetics and functional standards of the wider The Edit at D3 complex. Tower C will also feature a refined array of 1, 2, 3 and 4-bedroom residences and penthouses.
Construction progress
0.24% complete at the latest RERA site inspection on 19 Aug 2026; scheduled completion 31 Jan 2030.
Project register as of 15 Oct 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 19 Aug 2026 | 0.24% | 3 |
| 1 Jun 2026 | 0% | 3 |
| 29 Oct 2025 | 0% | 2 |
Escrow account 29427113 at Abu Dhabi Islamic Bank. Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #4177, updated daily. Tap a photo for the full-size original.
The Edit: questions and answers
When is the handover of The Edit?
The Dubai Land Department project register lists the completion date of The Edit as January 2030.
How much of The Edit is built?
The Edit was 0% complete at the official RERA site inspection of 19 August 2026.
Is The Edit registered with the Dubai Land Department?
Yes. The Edit is registered with the Dubai Land Department as project number 4177, and its escrow account is held at Abu Dhabi Islamic Bank. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of The Edit?
The Edit is developed by Meraas. The Dubai Land Department project register lists 64 projects for Meraas: 31 delivered and 32 under construction.
Where is The Edit located?
The Edit is in Dubai Design District (D3) (The Edit at D3), Dubai.
What unit types does The Edit offer?
The project has 557 units in the Dubai Land Department project register.
Explore more
✦ Want the full picture on The Edit?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 19 Aug 2026.