Mirdad (Tower 2)

by Union Properties · 📍 Motor City

WhatsAppEmail

Price from

AED 1.40M

Mirdad (Tower 2) is a project by Union Properties in Motor City, Dubai. Prices start from AED 1.40M. It offers Studio, 1 Bedroom, 2 Bedroom and 3 Bedroom. The Dubai Land Department project register lists completion for December 2028. It was 6% built at the official RERA site inspection of 28 September 2026.

About the project

Launch window: Launched January 9, 2026. AED 2bn, four-tower, 1,087-unit residential community in Motor City; completion Q4 2028.

Construction progress

6.02% complete at the latest RERA site inspection on 28 Sept 2026; scheduled completion 31 Dec 2028.

Project register as of 17 Nov 2026.

Mirdad (Tower 2) site photos from the RERA inspection on 28 Sept 2026.
InspectionCompletePhotos
28 Sept 20266.02%6
19 Jun 20262.83%5
24 Oct 20250.27%2

Escrow account 001640218978101 at Dubai Islamic Bank (Public Joint Stock Company). Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #4158, updated daily. Tap a photo for the full-size original.

Paid against built

On this plan a buyer pays 60% of the price before the keys and 40% on handover.

Paid by today (booked at the start, construction share paid evenly)23%
Built (inspection of 28 Sept 2026)6%
Build time passed (registered start to registered completion)38%

By the inspection of 28 Sept 2026, on an even schedule, payments ran 14 points ahead of the building: more than the booking explains, so the build is behind its registered timetable. Payments go into the project's escrow account and the developer draws them only against inspected progress.

Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North5.6 h2.8 h0.0 h5.6 / 5.6
East6.3 h0.0 h5.0 h6.3 / 6.3
South6.1 h2.4 h9.9 h6.1 / 6.1
West6.3 h5.7 h5.1 h6.3 / 6.3

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 196 m (around 56 floors).

    • Plot 6740194, 367 m away, no building on record · site plan: G+55
    • Plot 6740288, 459 m away, being built · site plan: G+5 · Monarch
  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 140 m (around 40 floors).

    • Plot 6740289, 264 m away, being built · site plan: G+39 · O1ne District - Dawn
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 5. The tallest may rise to about 179 m (around 51 floors).

    • Plot 6740191, 145 m away, being built · site plan: G+27 · Capital One
    • Plot 6740341, 188 m away, being built · site plan: G+6P+40 · Binghatti Skyterraces
    • Plot 6740192, 261 m away, being built · site plan: G+50 · Ananda Residences
  • West

    The planning register covers too little of what lies in front of this side to say what may be built there.

See the plots on the 3D map

Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

Units sold

Snapshot of 1 Nov 2026

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
1 Bed630–1,080 sqft (59–100 m²)AED 1.40M6 / 140
2 Beds980–1,760 sqft (91–164 m²)AED 2.60M3 / 116
3 Beds1,450–3,110 sqft (135–289 m²)—0 / 47

Mirdad (Tower 2): questions and answers

What is the starting price of Mirdad (Tower 2)?

Prices at Mirdad (Tower 2) start from AED 1.40M, as listed for sale.

What is the payment plan for Mirdad (Tower 2)?

The payment plan listed for Mirdad (Tower 2) is: 60% pre-handover, 40% handover.

When is the handover of Mirdad (Tower 2)?

The Dubai Land Department project register lists the completion date of Mirdad (Tower 2) as December 2028.

How much of Mirdad (Tower 2) is built?

Mirdad (Tower 2) was 6% complete at the official RERA site inspection of 28 September 2026.

Is Mirdad (Tower 2) registered with the Dubai Land Department?

Yes. Mirdad (Tower 2) is registered with the Dubai Land Department as project number 4158, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Mirdad (Tower 2)?

Mirdad (Tower 2) is developed by Union Properties. The Dubai Land Department project register lists 4 projects for Union Properties: 1 delivered and 2 under construction.

Where is Mirdad (Tower 2) located?

Mirdad (Tower 2) is in Motor City, Dubai.

What unit types does Mirdad (Tower 2) offer?

Mirdad (Tower 2) offers Studio, 1 Bedroom, 2 Bedroom and 3 Bedroom, with sizes from 630 sqft (59 m²). The project has 1,114 units in the Dubai Land Department project register.

What is the average price per sqft in Motor City?

Apartments in Motor City sell for about AED 1,011/sqft (AED 10,883/m²), based on 606 registered sales in the last 12 months.

What rental yield can I expect in Motor City?

Apartments in Motor City yield about 7.1% gross, or about 5.5% net after service charges, based on 1,892 registered rent contracts and 606 sales in the last 12 months.

What are the service charges in Motor City?

Service charges for apartments in Motor City are about AED 15.70/sqft (AED 169/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

Explore more

More off-plan projects by Union Properties

✦ Want the full picture on Mirdad (Tower 2)?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 28 Sept 2026.