Marine 4 is a project by Damac Properties in DAMAC Riverside, Dubai. Its handover is listed for May 2028. It was 21% built at the official RERA site inspection of 26 August 2026.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: independent listing.
About the project
Marine 4 at DAMAC Riverside presents an array of premium residences crafted to accommodate varying lifestyle preferences. Situated in the dynamic, multi-purpose Dubai Investment Park (DIP), Marine 4 by DAMAC Properties aims to create a lively and well-connected neighbourhood, providing an outstanding residential experience. The upcoming project will feature tranquil riverside vistas, verdant landscapes and lifestyle facilities. Strategically located at the intersection of Emirates Road (E611) and Jebel Ali Al Hibab Road (D57), it offers convenient connectivity to major city destinations. These primary thoroughfares near Marine 4 by DAMAC Properties enable quick access to Al Maktoum International Airport and Expo City.
Construction progress
21.17% complete at the latest RERA site inspection on 26 Aug 2026; scheduled completion 31 May 2028.
Project register as of 15 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 26 Aug 2026 | 21.17% | 7 |
| 10 Apr 2026 | 9.17% | 7 |
| 11 Nov 2025 | 7% | 6 |
| 20 May 2025 | 0.24% | 4 |
| 31 Oct 2024 | 0% | 2 |
Escrow account 4031226083895017 at First Abu Dhabi Bank P.J.S.C.. Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #3375, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 5.6 / 5.6 |
| East | 6.3 h | 0.0 h | 5.2 h | 6.3 / 6.3 |
| South | 6.1 h | 2.4 h | 10.5 h | 6.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 6.3 / 6.3 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.
Amenities
Who's selling this project
20 agencies are currently listing units in Marine 4 across 33 listings, from AED 805,000 to AED 2.23M depending on unit size and floor.
| Agency | Listings | Asking range | Trust |
|---|---|---|---|
| 7 | AED 1.38M – AED 2.23M | 7 verified · Trusted broker | |
| 3 | AED 2.23M | 3 verified · Trusted broker | |
| 2 | AED 1.55M – AED 1.80M | 2 verified | |
| 2 | AED 1.07M – AED 1.25M | 2 verified | |
| 2 | AED 1.20M | 2 verified · Trusted broker | |
| 2 | AED 1.14M – AED 1.38M | 2 verified · Trusted broker | |
| 2 | AED 1.14M – AED 1.20M | 2 verified · Trusted broker | |
| 1 | AED 1.99M | 1 verified · Trusted broker | |
| 1 | AED 1.99M | 1 verified | |
| 1 | AED 1.13M | 1 verified · Trusted broker | |
| 1 | AED 870,000 | 1 verified · Trusted broker | |
| 1 | AED 1.80M | 1 verified · Trusted broker | |
| 1 | AED 805,000 | 1 verified | |
| 1 | AED 1.30M | 1 verified · Trusted broker | |
| 1 | AED 999,900 | 1 verified · Trusted broker | |
| 1 | AED 1.30M | 1 verified · Trusted broker | |
| 1 | AED 1.38M | 1 verified | |
| 1 | AED 1.25M | 1 verified · Trusted broker | |
| 1 | AED 1.43M | 1 verified | |
| 1 | AED 1.20M | 1 verified · Trusted broker |
Tap an agency to see its listings and call or WhatsApp the agent (sign in).
Live agency asking prices across unit types and floors — not sold prices.
Marine 4: questions and answers
When is the handover of Marine 4?
The handover of Marine 4 is listed for May 2028. The Dubai Land Department project register lists the completion date of the project as May 2028.
How much of Marine 4 is built?
Marine 4 was 21% complete at the official RERA site inspection of 26 August 2026.
Is Marine 4 registered with the Dubai Land Department?
Yes. Marine 4 is registered with the Dubai Land Department as project number 3375, and its escrow account is held at First Abu Dhabi Bank P.J.S.C.. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Marine 4?
Marine 4 is developed by Damac Properties. The Dubai Land Department project register lists 284 projects for Damac Properties: 138 delivered and 113 under construction.
Where is Marine 4 located?
Marine 4 is in DAMAC Riverside (Riverside Views), Dubai.
What unit types does Marine 4 offer?
The project has 276 units in the Dubai Land Department project register.
What amenities does Marine 4 have?
Marine 4 lists these amenities: Gym or Health Club, Kids Play Area and Swimming Pool.
Explore more
✦ Want the full picture on Marine 4?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 26 Aug 2026.