Elegance Tower

by DAMAC Properties · 📍 Downtown Dubai

WhatsAppEmail

Elegance Tower is a project by DAMAC Properties in Downtown Dubai, Dubai. It offers Apartment. The Dubai Land Department project register lists completion for February 2026. It was 100% built at the official RERA site inspection of 16 September 2026.

Floor plans

Layouts by unit type — tap any plan to view it full size.

About the project

Residential tower near Downtown Dubai.

Construction progress

Finished

100% complete at the latest RERA site inspection on 16 Sept 2026; completed 28 Feb 2026.

Project register as of 22 Nov 2026.

Elegance Tower site photos from the RERA inspection on 16 Sept 2026 (6 of 15 shown).
InspectionCompletePhotos
16 Sept 2026100%15
12 Apr 202686.23%11
11 Dec 202566.55%7
6 Aug 202552.74%8
10 Apr 202541.51%8
13 Nov 202423.65%6
20 May 202412.75%2
14 Dec 20236.65%5

Official RERA site-inspection records for registered project #2475, updated daily. Tap a photo for the full-size original.

Sun on each side of the building

Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.

Most hot afternoon sun in summer (3.3 hours a day after 1 pm): West. The least (0.0 hours): North.

SideSummer (May–Sep)Of it after 1 pmWinter (Nov–Feb)Summer: low / high floor
North0.8 h0.0 h0.0 h0.8 / 1.8
East6.3 h0.0 h4.8 h6.3 / 6.3
South4.7 h1.1 h4.2 h4.1 / 5.2
West3.9 h3.3 h0.8 h3.3 / 4.1

Neighbours shade the lower floors: in summer 4.1 hours a day on a low floor against 5.2 near the top, on the side facing South.

Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.

What may be built in front of each side

Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.

  • North

    The planning register covers too little of what lies in front of this side to say what may be built there.

  • East

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 3. The tallest may rise to about 105 m (around 30 floors).

    • Plot 3450408, 180 m away, being built · site plan: G+M+4P+24
    • Plot 3450404, 196 m away, no building on record · site plan: G+4P+25
    • Plot 3456796, 381 m away, no building on record · site plan: G+4P+25
  • South

    Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 8. One of them has no height limit in its site plan.

    • Plot 3450394, 133 m away, being built · site plan: G+4P+UNLIMITED
    • Plot 3450410, 191 m away, being built · site plan: G+3P+18
    • Plot 3450416, 236 m away, being built · site plan: G+M+4P+30 · One Residence
  • West

    The planning register covers too little of what lies in front of this side to say what may be built there.

See the plots on the 3D map

Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).

How it compares in Downtown Dubai

15 other off-plan projects in Downtown Dubai · average entry price AED 4.59M

Elegance Tower: questions and answers

When is the handover of Elegance Tower?

The Dubai Land Department project register lists the completion date of Elegance Tower as February 2026.

How much of Elegance Tower is built?

Elegance Tower was 100% complete at the official RERA site inspection of 16 September 2026.

Is Elegance Tower registered with the Dubai Land Department?

Yes. Elegance Tower is registered with the Dubai Land Department as project number 2475, and its escrow account is held at Emirates Nbd Bank (P.J.S.C). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Elegance Tower?

Elegance Tower is developed by DAMAC Properties. The Dubai Land Department project register lists 284 projects for Damac Properties: 138 delivered and 113 under construction.

Where is Elegance Tower located?

Elegance Tower is in Downtown Dubai, Dubai.

What unit types does Elegance Tower offer?

Elegance Tower offers Apartment. The project has 296 units in the Dubai Land Department project register.

What is the average price per sqft in Downtown Dubai?

Apartments in Downtown Dubai sell for about AED 2,600/sqft (AED 27,990/m²), based on 1,400 registered sales in the last 12 months.

What rental yield can I expect in Downtown Dubai?

Apartments in Downtown Dubai yield about 5.3% gross, or about 4.3% net after service charges, based on 9,742 registered rent contracts and 1,400 sales in the last 12 months.

What are the service charges in Downtown Dubai?

Service charges for apartments in Downtown Dubai are about AED 24.97/sqft (AED 269/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

Explore more

More off-plan projects by DAMAC Properties

✦ Want the full picture on Elegance Tower?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 9 Nov 2026.