Durar 1 is a project by Durar Group in Dubailand, Dubai. Durar Group states handover in Completed. It was 99% built at the official RERA site inspection of 3 October 2013.
About the project
Mid-rise residential building (Skycourts Tower, Plot 380, Wadi Al Safa 5) in the Dubailand Residence Complex, Dubai, with ground-floor retail. 241 residential units, clean geometric design focused on practical family living in a suburban setting. Completed.
Construction progress
Finished100% complete at the latest RERA site inspection on 3 Oct 2013; completed 15 Aug 2013.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 3 Oct 2013 | 99.4% | 14 |
| 17 Sept 2012 | 96.23% | 13 |
Official RERA site-inspection records for registered project #880, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.4 hours a day after 1 pm): South-west. The least (0.0 hours): North-east.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North-east | 3.0 h | 0.0 h | 1.6 h | 2.8 / 3.4 |
| South-east | 4.5 h | 0.4 h | 2.5 h | 3.7 / 5.2 |
| South-west | 6.4 h | 5.4 h | 6.5 h | 6.3 / 6.5 |
| North-west | 4.3 h | 4.2 h | 0.4 h | 4.1 / 4.8 |
Neighbours shade the lower floors: in summer 3.7 hours a day on a low floor against 5.2 near the top, on the side facing South-east.
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 74 m (around 21 floors).
- Plot 6488687, 138 m away, being built · site plan: G+3P+16 · Time 2
- Plot 6488686, 194 m away, being built · site plan: G+3P+17 · Samana Boulevard Heights
- South-east
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 15. The tallest may rise to about 60 m (around 17 floors).
- Plot 6488670, 92 m away, being built · site plan: G+15 · Samana Park Meadows
- Plot 6488672, 108 m away, no building on record · site plan: G+13
- Plot 6488669, 137 m away, being built · site plan: G+13 · Seraph By Wadan
- South-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 19. The tallest may rise to about 63 m (around 18 floors).
- Plot 6488676, 60 m away, no building on record · site plan: G+13
- Plot 6488671, 75 m away, no building on record · site plan: G+13
- Plot 6488682, 81 m away, being built · site plan: G+13 · Dalmore Tower
- North-west
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 13. The tallest may rise to about 109 m (around 31 floors).
- Plot 6488679, 157 m away, being built · site plan: G+3P+17 · Reef 995
- Plot 6488678, 166 m away, being built · site plan: G+17 · The Boulevard By Prestige One
- Plot 6488701, 371 m away, no building on record · site plan: G+17
Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Amenities
How it compares in Dubailand
22 other off-plan projects in Dubailand · average entry price AED 695,744
Durar 1: questions and answers
When is the handover of Durar 1?
Durar Group states handover of Durar 1 in Completed. The Dubai Land Department project register lists the completion date of the project as August 2013.
How much of Durar 1 is built?
Durar 1 was 99% complete at the official RERA site inspection of 3 October 2013.
Is Durar 1 registered with the Dubai Land Department?
Yes. Durar 1 is registered with the Dubai Land Department as project number 880, and its escrow account is held at First Abu Dhabi Bank P.J.S.C.. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Durar 1?
Durar 1 is developed by Durar Group. The Dubai Land Department project register lists 3 projects for Durar Group, all delivered.
Where is Durar 1 located?
Durar 1 is in Dubailand (Wadi Al Safa 5 / Dubailand Residence Complex), Dubai.
What unit types does Durar 1 offer?
The project has 241 units in the Dubai Land Department project register.
Explore more
More off-plan projects by Durar Group
✦ Want the full picture on Durar 1?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 14 Jun 2026.