Price from
AED 1.20M
Capri 2 is a project by Damac Properties in DAMAC Riverside, Dubai. Prices start from AED 1.20M. It offers 1 Bedroom and 2 Bedroom. Its handover is listed for March 2029. It was 8% built at the official RERA site inspection of 22 September 2026.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: DAMAC Properties official site.
About the project
Capri 2 will form part of the Riverside Views community within DAMAC Riverside in Dubai Investments Park (DIP). This project, developed by DAMAC Properties, will feature 1 and 2-bedroom apartments designed for balanced living within a waterfront setting. It will reflect the community’s emphasis on recreation and wellbeing, offering various leisure amenities such as a clubhouse, a floating island restaurant, a zen garden, a spa, a Portofino Restaurant and a hydroponic farm that adds a natural touch to the surroundings. Located near Sheikh Mohammed Bin Zayed Road (E311) and Emirates Road (E611), Capri 2 will maintain easy connections across Dubai while preserving a calm residential atmosphere.
Construction progress
8.33% complete at the latest RERA site inspection on 22 Sept 2026; scheduled completion 31 Mar 2029.
Project register as of 15 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 22 Sept 2026 | 8.33% | 6 |
| 12 Mar 2026 | 4.75% | 4 |
| 10 Nov 2025 | 0.53% | 4 |
| 22 Apr 2025 | 0% | 2 |
Escrow account 019000089177 at Mashreq Bank Psc. Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #3664, updated daily. Tap a photo for the full-size original.
Paid against built
On this plan a buyer pays 70% of the price before the keys and 30% on handover.
By the inspection of 22 Sept 2026, on an even schedule, payments ran 27 points ahead of the building. That is usual during a build (the booking is paid up front); payments go into the project's escrow account and the developer draws them only against inspected progress.
Estimate: the plan's share during construction is spread evenly from the project's registered start to its registered completion; many plans tie payments to build stages instead. Built = the latest Land Department inspection.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 5.6 / 5.6 |
| East | 6.3 h | 0.0 h | 5.2 h | 6.3 / 6.3 |
| South | 6.1 h | 2.4 h | 10.5 h | 6.1 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 6.3 / 6.3 |
Snapshot of 15 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.
Amenities
Who's selling this project
3 agencies are currently listing units in Capri 2 across 3 listings, from AED 1.19M to AED 1.38M depending on unit size and floor.
| Agency | Listings | Asking range | Trust |
|---|---|---|---|
| 1 | AED 1.35M | Trusted broker | |
| 1 | AED 1.19M | — | |
| 1 | AED 1.38M | Trusted broker |
Tap an agency to see its listings and call or WhatsApp the agent (sign in).
Live agency asking prices across unit types and floors — not sold prices.
How it compares in DAMAC Riverside
11 other off-plan projects in DAMAC Riverside · average entry price AED 1.17M · this project is 3% above that average
Capri 2: questions and answers
What is the starting price of Capri 2?
Prices at Capri 2 start from AED 1.20M, as listed for sale.
What is the payment plan for Capri 2?
The payment plan listed for Capri 2 is: 20% down, 50% pre-handover, 30% handover.
When is the handover of Capri 2?
The handover of Capri 2 is listed for March 2029. The Dubai Land Department project register lists the completion date of the project as March 2029.
How much of Capri 2 is built?
Capri 2 was 8% complete at the official RERA site inspection of 22 September 2026.
Is Capri 2 registered with the Dubai Land Department?
Yes. Capri 2 is registered with the Dubai Land Department as project number 3664, and its escrow account is held at Mashreq Bank Psc. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Capri 2?
Capri 2 is developed by Damac Properties. The Dubai Land Department project register lists 284 projects for Damac Properties: 138 delivered and 113 under construction.
Where is Capri 2 located?
Capri 2 is in DAMAC Riverside (Riverside Views), Dubai.
What unit types does Capri 2 offer?
Capri 2 offers 1 Bedroom and 2 Bedroom. The project has 576 units in the Dubai Land Department project register.
How does Capri 2 compare with other off-plan projects in DAMAC Riverside?
The starting price of Capri 2 (AED 1.20M) is 3% above the average starting price of 11 other off-plan projects in DAMAC Riverside, which is AED 1.17M.
What amenities does Capri 2 have?
Capri 2 lists these amenities: CCTV Security, Gym or Health Club, Kids Play Area, Lawn or Garden and Swimming Pool.
Explore more
✦ Want the full picture on Capri 2?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from"; confirm with the developer. Checked 22 Sept 2026.




