Price from
AED 600,000
Auresta Tower is a project by Tiger Properties in Jumeirah Village Circle, Dubai. Prices start from AED 600,000. It offers Studio, 1BR, 2BR and 3BR. The Dubai Land Department project register lists completion for December 2028. It was 4% built at the official RERA site inspection of 8 October 2026.
Floor plans
Layouts by unit type — tap any plan to view it full size.
Official brochure
Source: Tiger Properties official site.
| Unit type | Size range | Layouts |
|---|---|---|
| Studio | — | 1 |
| 1 Bedroom | — | 1 |
| 2 Bedroom | — | 1 |
| 3 Bedroom | — | 1 |
Unit types & sizes read from the brochure.
About the project
63-story residential tower in JVC with 568 studios, 202 one-bed, 40 two-bed and 4 three-bed duplexes.
Units & pricing
| Unit | Size | Price from |
|---|---|---|
| Studio | — | AED 600,000 |
| 1BR | — | — |
| 2BR | — | — |
| 3BR Duplex | — | — |
Construction progress
4.44% complete at the latest RERA site inspection on 8 Oct 2026; scheduled completion 31 Dec 2028.
Project register as of 17 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 8 Oct 2026 | 4.44% | 3 |
| 27 Jul 2026 | 2% | 4 |
| 8 Jan 2026 | 0% | 4 |
| 16 Jun 2025 | 0% | 2 |
Escrow account 4031225724912014 at First Abu Dhabi Bank P.J.S.C.. Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #3734, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.7 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.6 h | 2.8 h | 0.0 h | 4.3 / 5.6 |
| East | 6.3 h | 0.0 h | 5.2 h | 6.3 / 6.3 |
| South | 6.1 h | 2.4 h | 10.5 h | 5.8 / 6.1 |
| West | 6.3 h | 5.7 h | 5.1 h | 4.7 / 6.3 |
Neighbours shade the lower floors: in summer 4.7 hours a day on a low floor against 6.3 near the top, on the side facing West.
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
The building is not built yet: the sides face due north, east, south and west, at its planned height, with the buildings that stand around it today.
Units sold
Snapshot of 1 Nov 2026
Per-unit-type prices from an independent market source. Sold: off-plan sales registered with the Dubai Land Department up to 28 Oct 2026.
| Unit | Size | Price from | Sold |
|---|---|---|---|
| Studio | 330–370 sqft (31–34 m²) | AED 552,000 | 374 / 568 |
| 1 Bed | 670–680 sqft (62–63 m²) | AED 1.00M | 140 / 202 |
| 2 Beds | 1,140 sqft (106 m²) | AED 1.40M | 9 / 40 |
| 3 Beds | 2,050 sqft (190 m²) | — | 0 / 4 |
Prices and unit counts: independent third-party snapshot, not developer-confirmed. Sold counts are this project's off-plan sales registered with the Dubai Land Department, by bedroom type; they may include resales of the same home and may differ from the other listing data on this page.
Amenities
Who's selling this project
30 agencies are currently listing units in Auresta Tower across 133 listings, from AED 365,000 to AED 4.14M depending on unit size and floor.
| Agency | Listings | Asking range | Trust |
|---|---|---|---|
| 12 | AED 429,000 – AED 1.55M | 12 verified | |
| 11 | AED 440,000 – AED 2.68M | 11 verified | |
| 10 | AED 806,471 – AED 4.14M | 10 verified · Trusted broker | |
| 9 | AED 588,280 – AED 1.56M | 9 verified · Trusted broker | |
| 8 | AED 578,711 – AED 1.07M | 8 verified | |
| 7 | AED 540,011 – AED 2.66M | 6 verified · Trusted broker | |
| 7 | AED 450,000 – AED 740,000 | 7 verified | |
| 7 | AED 575,143 – AED 1.56M | 7 verified | |
| 6 | AED 370,000 – AED 990,000 | 6 verified | |
| 6 | AED 369,990 – AED 619,999 | 6 verified · Trusted broker | |
| 5 | AED 941,915 – AED 1.45M | 5 verified · Trusted broker | |
| 5 | AED 480,000 – AED 1.44M | 5 verified · Trusted broker | |
| 5 | AED 365,000 – AED 554,500 | 5 verified · Trusted broker | |
| 3 | AED 528,000 – AED 1.01M | 3 verified · Trusted broker | |
| 3 | AED 575,000 – AED 1.01M | 3 verified · Trusted broker | |
| 3 | AED 420,000 – AED 460,000 | 3 verified · Trusted broker | |
| 3 | AED 459,300 – AED 1.44M | Trusted broker | |
| 3 | AED 512,045 – AED 1.50M | 3 verified · Trusted broker | |
| 2 | AED 500,000 – AED 840,000 | 2 verified | |
| 2 | AED 503,894 – AED 545,412 | 2 verified · Trusted broker | |
| 2 | AED 1.23M – AED 1.24M | 2 verified · Trusted broker | |
| 2 | AED 473,690 – AED 927,711 | 2 verified · Trusted broker | |
| 2 | AED 564,529 – AED 1.03M | 2 verified · Trusted broker | |
| 2 | AED 564,500 – AED 941,900 | 2 verified | |
| 2 | AED 636,440 – AED 4.14M | 2 verified · Trusted broker | |
| 2 | AED 575,000 – AED 1.01M | 2 verified · Trusted broker | |
| 1 | AED 666,000 | 1 verified | |
| 1 | AED 1.20M | 1 verified · Trusted broker | |
| 1 | AED 450,000 | 1 verified | |
| 1 | AED 540,000 | 1 verified |
Tap an agency to see its listings and call or WhatsApp the agent (sign in).
Live agency asking prices across unit types and floors — not sold prices.
How it compares in Jumeirah Village Circle
135 other off-plan projects in Jumeirah Village Circle · average entry price AED 798,802 · this project is 25% below that average
Auresta Tower: questions and answers
What is the starting price of Auresta Tower?
Prices at Auresta Tower start from AED 600,000, for homes from 670 sqft (62 m²), as published by Tiger Properties.
What is the payment plan for Auresta Tower?
The payment plan published by Tiger Properties for Auresta Tower is: 5-year payment plan.
When is the handover of Auresta Tower?
The Dubai Land Department project register lists the completion date of Auresta Tower as December 2028.
How much of Auresta Tower is built?
Auresta Tower was 4% complete at the official RERA site inspection of 8 October 2026.
Is Auresta Tower registered with the Dubai Land Department?
Yes. Auresta Tower is registered with the Dubai Land Department as project number 3734, and its escrow account is held at First Abu Dhabi Bank P.J.S.C.. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Auresta Tower?
Auresta Tower is developed by Tiger Properties. The Dubai Land Department project register lists 26 projects for Tiger Properties: 18 delivered and 8 under construction.
Where is Auresta Tower located?
Auresta Tower is in Jumeirah Village Circle (JVC), Dubai.
What unit types does Auresta Tower offer?
Auresta Tower offers Studio, 1BR, 2BR and 3BR, with sizes from 670 sqft (62 m²). The project has 840 units in the Dubai Land Department project register.
How does Auresta Tower compare with other off-plan projects in Jumeirah Village Circle?
The starting price of Auresta Tower (AED 600,000) is 25% below the average starting price of 123 other off-plan projects in Jumeirah Village Circle, which is AED 798,802.
What is the average price per sqft in Jumeirah Village Circle?
Apartments in Jumeirah Village Circle sell for about AED 1,291/sqft (AED 13,893/m²), based on 4,118 registered sales in the last 12 months.
What rental yield can I expect in Jumeirah Village Circle?
Apartments in Jumeirah Village Circle yield about 7.1% gross, or about 5.9% net after service charges, based on 29,807 registered rent contracts and 4,118 sales in the last 12 months.
What are the service charges in Jumeirah Village Circle?
Service charges for apartments in Jumeirah Village Circle are about AED 16.02/sqft (AED 172/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.
What amenities does Auresta Tower have?
Auresta Tower lists these amenities: Outdoor swimming pool, Fitness center, Kids pool and play area, Sauna and steam rooms, Sports courts, Jogging and cycling tracks, Yoga and meditation decks and Garden zones, plus 3 more.
Explore more
More off-plan projects by Tiger Properties
- Altai Tower, Jumeirah Village Trianglefrom AED 599,000
- Sky Gate Tower, Jumeirah Village Trianglefrom AED 600,000
✦ Want the full picture on Auresta Tower?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s official website + live listing photos. Prices are "starting from"; confirm with the developer. Checked 9 Nov 2026.





