Aura Central is a project by Aura Infinite Real Estate Development L. L. C in Arjan, Dubai. It offers Retail space and Office space. Aura Infinite Real Estate Development L. L. C states handover in May 2026. It was 100% built at the official RERA site inspection of 31 August 2026.
Official brochure
Layouts and floor plans inside. Source: Aura Infinite Real Estate Development L. L. C official site, as of Apr 2026.
About the project
Modern commercial building (B+G+4) in Arjan, Dubai with 20,000 sqft of retail and 45,000 sqft of office space, including units with private terraces. Reported as fully sold out.
Construction progress
Finished100% complete at the latest RERA site inspection on 31 Aug 2026.
Project register as of 22 Nov 2026.
| Inspection | Complete | Photos |
|---|---|---|
| 31 Aug 2026 | 100% | 16 |
| 31 Jul 2026 | 98.6% | 11 |
| 1 Jul 2025 | 33.26% | 6 |
| 4 Dec 2024 | 0% | 2 |
Official RERA site-inspection records for registered project #3327, updated daily. Tap a photo for the full-size original.
Sun on each side of the building
Hours of direct sun a day on each side, worked out from the sun's path over Dubai and the shade of the buildings around it. Afternoon sun in summer heats a flat the most and raises the cooling bill.
Most hot afternoon sun in summer (5.2 hours a day after 1 pm): West. The least (0.0 hours): East.
| Side | Summer (May–Sep) | Of it after 1 pm | Winter (Nov–Feb) | Summer: low / high floor |
|---|---|---|---|---|
| North | 5.2 h | 2.4 h | 0.0 h | 5.0 / 5.3 |
| East | 6.2 h | 0.0 h | 4.5 h | 6.2 / 6.2 |
| South | 6.0 h | 2.3 h | 9.3 h | 6.0 / 6.1 |
| West | 5.8 h | 5.2 h | 4.9 h | 5.6 / 6.1 |
Snapshot of 22 Nov 2026 · Middle floor; the sun's path on the 21st of each month; the shade of every building within 450 m, outlines and heights from the map (OpenStreetMap contributors) and the Land Department register. Low / high = a low floor and a floor near the top.
This building's exact outline is not on the map, so the sides shown face due north, east, south and west, and the shade of the neighbours is approximate.
What may be built in front of each side
Plots within 500 m in front of each side that have no building on record or are being built, with the height their site plan allows. A plot that is already built is part of today's view.
- North
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 4. The tallest may rise to about 67 m (around 19 floors).
- Plot 6731162, 128 m away, being built · site plan: G+6 · Bond Enclave
- Plot 6731157, 244 m away, no building on record · site plan: G+6
- Plot 6734093, 271 m away, no building on record · site plan: G+18
- East
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 6. The tallest may rise to about 53 m (around 15 floors).
- Plot 6731150, 153 m away, being built · site plan: G+4 · Vertex Pointe
- Plot 6731149, 192 m away, being built · site plan: G+6 · The Lx
- Plot 6731133, 335 m away, no building on record · site plan: G+6
- South
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 1. The tallest may rise to about 18 m (around 5 floors). Floors below about 5 on this side may face a new building.
- Plot 6731182, 282 m away, no building on record · site plan: G+4
- West
Plots in front where a building of more than about 3 floors may rise (no building on record, or being built): 2. The tallest may rise to about 67 m (around 19 floors).
- Plot 6731287, 202 m away, being built · site plan: G+13 · Vincitore Volare
- Plot 6734091, 321 m away, no building on record · site plan: G+18
Snapshot of 22 Nov 2026 · Dubai Development Authority planning register (209 master-planned projects). 'No building on record' means nothing is registered on the plot: an estimate. Heights as the site plan writes them (G+n = ground plus n floors).
Amenities
Aura Central: questions and answers
When is the handover of Aura Central?
Aura Infinite Real Estate Development L. L. C states handover of Aura Central in May 2026.
How much of Aura Central is built?
Aura Central was 100% complete at the official RERA site inspection of 31 August 2026.
Is Aura Central registered with the Dubai Land Department?
Yes. Aura Central is registered with the Dubai Land Department as project number 3327, and its escrow account is held at Dubai Islamic Bank (Public Joint Stock Company). By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.
Who is the developer of Aura Central?
Aura Central is developed by Aura Infinite Real Estate Development L. L. C. The Dubai Land Department project register lists 4 projects for Aura Infinite Real Estate Development L. L. C: 2 delivered and 2 under construction.
Where is Aura Central located?
Aura Central is in Arjan, Dubai.
What unit types does Aura Central offer?
Aura Central offers Retail space and Office space. The project has 38 units in the Dubai Land Department project register.
What amenities does Aura Central have?
Aura Central lists these amenities: Double-height lobby, Dedicated visitor parking and Private terraces (select units).
Explore more
More off-plan projects by Aura Infinite Real Estate Development L. L. C
✦ Want the full picture on Aura Central?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: developer’s website. Prices are "starting from"; confirm with the developer. Checked 1 Nov 2026.