Altai

by Tiger Properties · 📍 Jumeirah Village Triangle (JVT)

Price from

AED 816,000

Altai is a project by Tiger Properties in Jumeirah Village Triangle (JVT), Dubai. Prices start from AED 816,000. It offers 1 Bedroom and 2 Bedroom. Tiger Properties states handover in January 2026. It was 98% built at the official RERA site inspection of 29 September 2026.

AltaiAltai 2Altai 3Altai 4Altai 5

Official brochure

Full unit layouts & floor plans are inside the brochure. Source: independent listing source.

Download brochure ↓

About the project

AlTai is an impressive tower located in Jumeirah Village Triangle, offering a promising future built on simplicity. Developed by Tiger Properties, it is a 26-storey residential project with studios, 1 and 2-bedroom apartments. Residents of AlTai Tower enjoy access to a range of amenities that enhance their quality of life. Take a moment to relax by the outdoor pool, take a leisurely stroll along the running and walking track, or engage in a satisfying workout at the gym. The exterior design seamlessly blends with the natural surroundings, while the interior is carefully designed to create a captivating atmosphere.

Construction progress

98.43% complete at the latest RERA site inspection on 29 Sept 2026; originally scheduled 31 Jan 2026.

Project register as of 15 Oct 2026.

Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 1)Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 2)Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 3)Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 4)Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 5)Altai, Jumeirah Village Triangle (JVT) construction progress, 98.43% complete: RERA site inspection 29 Sept 2026 (photo 6)
Altai site photos from the RERA inspection on 29 Sept 2026 (6 of 15 shown).
InspectionCompletePhotos
29 Sept 202698.43%15
11 Aug 202695%19
27 Apr 202681.61%8
29 Dec 202565.54%11
22 Jul 202530.71%7
18 Feb 202513.33%4
8 Jul 20240.74%3
25 May 20230%3

Escrow account 10487681920036 at Abu Dhabi Commercial Bank. Payments for units in this project go into this account.

Official RERA site-inspection records for registered project #2636, updated daily. Tap a photo for the full-size original.

Sales velocity

Per-unit-type pricing and sell-through from an independent market source.

UnitSizePrice fromSold
1 Bed580–930 sqft (54–86 m²)AED 796,000134 / 142
2 Beds1,020–1,440 sqft (95–134 m²)AED 1.30M23 / 50
Studio340 sqft (32 m²)AED 551,00045 / 46

Independent third-party construction snapshot, not developer-confirmed. Sold counts reflect that source's own tracking and may differ from the other listing data on this page.

Amenities

Barbeque AreaGym or Health ClubKids Play AreaLobby in BuildingParking SpacesSaunaSteam RoomSwimming Pool

How it compares in Jumeirah Village Triangle (JVT)

12 other off-plan projects in Jumeirah Village Triangle (JVT) · average entry price AED 889,000 · this project is 8% below that average

Altai: questions and answers

What is the starting price of Altai?

Prices at Altai start from AED 816,000, as published by Tiger Properties.

What is the payment plan for Altai?

The payment plan published by Tiger Properties for Altai is: 20% down, 34% pre-handover, 10% handover, 36% post-handover.

When is the handover of Altai?

Tiger Properties states handover of Altai in January 2026. The Dubai Land Department project register lists January 2026 as the original completion date of the project; it is still under construction.

How much of Altai is built?

Altai was 98% complete at the official RERA site inspection of 29 September 2026.

Is Altai registered with the Dubai Land Department?

Yes. Altai is registered with the Dubai Land Department as project number 2636, and its escrow account is held at Abu Dhabi Commercial Bank. By law, buyers' payments for an off-plan home in Dubai go into the project's escrow account.

Who is the developer of Altai?

Altai is developed by Tiger Properties. The Dubai Land Department project register lists 26 projects for Tiger Properties: 17 delivered and 9 under construction.

Where is Altai located?

Altai is in Jumeirah Village Triangle (JVT) (JVT District 1), Dubai.

What unit types does Altai offer?

Altai offers 1 Bedroom and 2 Bedroom. The project has 239 units in the Dubai Land Department project register.

How does Altai compare with other off-plan projects in Jumeirah Village Triangle (JVT)?

The starting price of Altai (AED 816,000) is 8% below the average starting price of 5 other off-plan projects in Jumeirah Village Triangle (JVT), which is AED 889,000.

What is the average price per sqft in Jumeirah Village Triangle?

Apartments in Jumeirah Village Triangle sell for about AED 1,338/sqft (AED 14,405/m²), based on 450 registered sales in the last 12 months.

What rental yield can I expect in Jumeirah Village Triangle?

Apartments in Jumeirah Village Triangle yield about 6.9% gross, or about 5.6% net after service charges, based on 2,857 registered rent contracts and 450 sales in the last 12 months.

What are the service charges in Jumeirah Village Triangle?

Service charges for apartments in Jumeirah Village Triangle are about AED 17.57/sqft (AED 189/m²) a year, per an independent third-party source. The exact rate depends on the building, so confirm it with the developer before buying.

What amenities does Altai have?

Altai lists these amenities: Barbeque Area, Gym or Health Club, Kids Play Area, Lobby in Building, Parking Spaces, Sauna, Steam Room and Swimming Pool.

Explore more

✦ Want the full picture on Altai?

This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.

✦ Ask the AI →

Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting. Project details last checked on 29 Sept 2026.