by Majid Al Futtaim (MAF) · 📍 Tilal Al Ghaf
Price from
AED 7.50M





Full unit layouts & floor plans are inside the brochure. Source: independent listing source.
Amara represents the ultimate embellishment to the canvas of Tilal Al Ghaf. With elegant designs and outlines that echo desert dunes and verdant wadis, Amara nestles in a stunning hilly landscape. The distinguished villa cluster features 3 to 5-bedroom twin villas built around a pool, kids play area and park. The project by Majid Al Futtaim has an easy access to central city via well-connected road network. Experience the pleasure of residing in a locale where every move celebrates nature, architecture and communal life.
70.8% complete at the latest RERA site inspection on 13 Aug 2026.
Per-unit-type pricing and sell-through from an independent market source.
| Unit | Size | Price from | Sold |
|---|---|---|---|
| 3 Beds | 3,710 - 6,160 sqft | AED 7.90M | 3 / 3 |
| 4 Beds | 3,710 - 6,440 sqft | AED 7.50M | 100 / 100 |
| 5 Beds | 3,710 - 4,680 sqft | AED 7.70M | 13 / 13 |
Independent third-party construction snapshot, not developer-confirmed. Sold counts reflect that source's own tracking and may differ from the other listing data on this page.
1 other off-plan project in Tilal Al Ghaf · average entry price AED 2.80M · this project is 168% above that average
✦ Want the full picture on Amara?
This page shows what we collected. Ask the AI to compare it against other projects, run the rental ROI and mortgage numbers, or check how its area is performing on real DLD sales.
Source: live new-projects feed. Prices are "starting from" figures where published. Always verify with the developer before transacting.
| Inspection | Complete | Photos |
|---|---|---|
| 13 Aug 2026 | 70.8% | 9 |
| 8 Jul 2026 | 58.09% | 8 |
| 16 Apr 2026 | 40.63% | 14 |
| 13 Jan 2026 | 25.14% | 10 |
| 6 Oct 2025 | 6.63% | 8 |
| 18 Aug 2025 | 4.31% | 7 |
| 24 Jan 2025 | 0.64% | 3 |
| 27 Nov 2023 | 0% | 2 |
Escrow account 0205428840917 at Emirates Nbd Bank (P.J.S.C). Payments for units in this project go into this account.
Official RERA site-inspection records for registered project #2858, updated daily. Tap a photo for the full-size original.